1.
This paper studies three tool replacement/operation sequencing strategies for a flexible manufacturing system over a finite time horizon: (1) failure replacement—replace the tool only upon failure, (2) optimal preventive tool replacement for a fixed sequence of operations, and (3) joint scheduling of the optimal preventive tool replacement times and the optimal sequence of operations. Stochastic dynamic decision models are used for strategies 2 and 3. The optimization criterion for strategies 2 and 3 is the minimization of the total expected cost over the finite time horizon. We will show through numerical studies that, with the same amount of information, the total expected costs can be reduced considerably by choosing an optimal strategy. Our conclusion is that in flexible manufacturing, optimal tool replacement and optimal operations sequencing are not separate issues. They should be considered jointly to minimize the expected total cost. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 479–499, 2000  相似文献   

2.
The majority of scheduling literature assumes that the machines are available at all times. In this paper, we study single machine scheduling problems where the machine maintenance must be performed within certain intervals and hence the machine is not available during the maintenance periods. We also assume that if a job is not processed to completion before the machine is stopped for maintenance, an additional setup is necessary when the processing is resumed. Our purpose is to schedule the maintenance and jobs to minimize some performance measures. The objective functions that we consider are minimizing the total weighted job completion times and minimizing the maximum lateness. In both cases, maintenance must be performed within a fixed period T, and the time for the maintenance is a decision variable. In this paper, we study two scenarios concerning the planning horizon. First, we show that, when the planning horizon is long in relation to T, the problem with either objective function is NP-complete, and we present pseudopolynomial time dynamic programming algorithms for both objective functions. In the second scenario, the planning horizon is short in relation to T. However, part of the period T may have elapsed before we schedule any jobs in this planning horizon, and the remaining time before the maintenance is shorter than the current planning horizon. Hence we must schedule one maintenance in this planning horizon. We show that the problem of minimizing the total weighted completion times in this scenario is NP-complete, while the shortest processing time (SPT) rule and the earliest due date (EDD) rule are optimal for the total completion time problem and the maximum lateness problem respectively. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 845–863, 1999  相似文献   

3.
    
This paper presents a branch‐and‐price algorithm for scheduling n jobs on m nonhomogeneous parallel machines with multiple time windows. An additional feature of the problem is that each job falls into one of ρ priority classes and may require two operations. The objective is to maximize the weighted number of jobs scheduled, where a job in a higher priority class has “infinitely” more weight or value than a job in a lower priority class. The methodology makes use of a greedy randomized adaptive search procedure (GRASP) to find feasible solutions during implicit enumeration and a two‐cycle elimination heuristic when solving the pricing subproblems. Extensive computational results are presented based on data from an application involving the use of communications relay satellites. Many 100‐job instances that were believed to be beyond the capability of exact methods, were solved within minutes. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

4.
In this paper the n/1/rj Σj wj Cj problem under the assumptions of nonpreemptive sequencing and sequence independent processing times is investigated. After pointing out the fundamental properties, some dominance sufficient conditions among sequences are obtained and a branch and bound algorithm is proposed. Computational results are reported and discussed.  相似文献   

5.
针对挠性胶管管壁的粘弹性,提出了复波速的概念,并将其应用于挠性胶管现有的动态特性理论中,分别建立了挠性胶管瞬态响应和频率响应的模型,说明了挠性胶管衰减管中液体介质压力脉动和流量脉动的原理并解释了现有的现象,得出了一些新的结论.此外,还指出了该方法目前存在的不足及今后的研究方向.  相似文献   

6.
挠性接管隔振效果检测试验装置合理性的讨论   总被引:1,自引:1,他引:1  
采用机电比拟的方法对挠性接管隔振效果检测试验装置进行了分析,针对欲达到的试验目的,定性地提出了组成试验装置的质量、弹性常数等应达到的要求.  相似文献   

7.
介绍了一种基于神经网络技术的感应电机定子电阻观测方法;讨论了定子电阻样本规划,并设计训练形成了定子电阻神经网络观测器.试验表明,该技术方法能有效地实施定子绕组电阻在线观测.  相似文献   

8.
针对现行工厂使用的拉线机床操作不便、可视性差的弱点,提出一种采用单片机及光电编码技术对火炮加工中的膛线加工机床进行数字化控制的方案,使膛线加工精度、质量和效益均可得到提高,是实现各种复杂膛线加工的一种实用、可行的方法。  相似文献   

9.
基于CPLD与单片机的多路高精度数据采集系统设计   总被引:4,自引:0,他引:4  
结合CPLD与单片机设计了一种多路高精度数据采集系统,最高可达24位转换精度。所采集数据具备良好的实时性,可采集通道数目多,同时系统具备较强的抗外界干扰能力,结构简单,可靠性好。该系统具有较强的可移植性,能够广泛应用于多路、高精度、低频数据采集的场合。  相似文献   

10.
We consider the scheduling of large‐scale projects to maximize the project net present value given temporal and resource constraints. The net present value objective emphasizes the financial aspects of project management. Temporal constraints between the start times of activities make it possible to handle practical problem assumptions. Scarce resources are an expression of rising cost. Since optimization techniques are not expedient to solve such problems and most heuristic methods known from literature cannot deal with general temporal constraints, we propose a new bidirectional priority‐rule based method. Scheduling activities with positive cash flows as early and activities with negative cash flows as late as possible results in a method which is completed by unscheduling techniques to cope with scarce resources. In a computational experiment, we compare the well‐known serial generation scheme where all activities are scheduled as early as possible with the proposed bidirectional approach. On the basis of a comprehensive data set known from literature containing instances with up to 1002 activities, the efficiency of the new approach is demonstrated. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2003  相似文献   

11.
The primary objective of this work is to introduce and perform a detailed study of a class of multistate reliability structures in which no ordering in the levels of components' performances is necessary. In particular, the present paper develops the basic theory (exact reliability formulae, reliability bounds, asymptotic results) that will make it feasible to investigate systems whose components are allowed to experience m ≥ 2 kinds of failure (failure modes), and their breakdown is described by different families of cut sets in each mode. For illustration purposes, two classical (binary) systems are extended to analogous multiple failure mode structures, and their reliability performance (bounds and asymptotic behavior) is investigated by numerical experimentation. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 167–185, 2002; DOI 10.1002/nav.10007  相似文献   

12.
In many practical manufacturing environments, jobs to be processed can be divided into different families such that a setup is required whenever there is a switch from processing a job of one family to another job of a different family. The time for setup could be sequence independent or sequence dependent. We consider two particular scheduling problems relevant to such situations. In both problems, we are given a set of jobs to be processed on a set of identical parallel machines. The objective of the first problem is to minimize total weighted completion time of jobs, and that of the second problem is to minimize weighted number of tardy jobs. We propose column generation based branch and bound exact solution algorithms for the problems. Computational experiments show that the algorithms are capable of solving both problems of medium size to optimality within reasonable computational time. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 823–840, 2003.  相似文献   

13.
In this article, we consider the concurrent open shop scheduling problem to minimize the total weighted completion time. When the number of machines is arbitrary, the problem has been shown to be inapproximable within a factor of 4/3 ‐ ε for any ε > 0 if the unique games conjecture is true in the literature. We propose a polynomial time approximation scheme for the problem under the restriction that the number of machines is fixed. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

14.
利用振动原理,研究、设计、制造微型电磁振动给料机(筛).设计了激磁铁芯、半波可控硅整流及控制电路.在对振动机械的隔振分析及优化设计理论的基础上,设计了整部机器的结构图纸,并制造了一部样机,给出了振动利用的一个范例.所研究制造的微型电磁振动机集机电为一体,在焊接、制药等诸多行业中具有广泛的应用价值.  相似文献   

15.
The opportunistic maintenance of a k‐out‐of‐n:G system with imperfect preventive maintenance (PM) is studied in this paper, where partial failure is allowed. In many applications, the optimal maintenance actions for one component often depend on the states of the other components and system reliability requirements. Two new (τ, T) opportunistic maintenance models with the consideration of reliability requirements are proposed. In these two models, only minimal repairs are performed on failed components before time τ and the corrective maintenance (CM) of all failed components are combined with PM of all functioning but deteriorated components after τ; if the system survives to time T without perfect maintenance, it will be subject to PM at time T. Considering maintenance time, asymptotic system cost rate and availability are derived. The results obtained generalize and unify some previous research in this area. Application to aircraft engine maintenance is presented. © 2000 John Wiley & Sons;, Inc. Naval Research Logistics 47: 223–239, 2000  相似文献   

16.
采用相对体制雷达测量系的地空导弹武器系统的引导精度,已经过多年研究和努力,它是起伏误差和动态误差的综合产物.采用目标信号分离与滤波可进一步提高制导精度.首先可大大减小目标的起伏误差(约减小1/2).在大大减小目标起伏误差的新条件下,重新综合起伏误差和动态误差,可大大提高引导精度.  相似文献   

17.
某轮式装甲车辆悬架系统缓和、衰减冲击效果不佳,影响车辆战术性能发挥。提出了简单有效的改进方案,并应用AMESim软件对悬架原系统与改进系统进行了建模仿真。通过仿真结果分析,验证了改进方案的可行性。为装备的技术改造提供了一个简单有效的可选方案。  相似文献   

18.
某加农炮身管内膛烧蚀磨损对内弹道性能的影响   总被引:3,自引:0,他引:3  
通过对某加农炮的身管烧蚀磨损特征数据进行分析整理,确定了身管烧蚀磨损特征面,采用了多特征面来表述火炮内弹道性能变化。将该研究方法具体用于某加农炮身管特性的研究,建立了该加农炮的内弹道性能与其身管内膛烧蚀磨损特征量之间的关系模型。  相似文献   

19.
舰空导弹综合试验与鉴定方法   总被引:3,自引:0,他引:3  
从综合试验与鉴定的思路出发 ,针对舰空导弹的战术技术特点 ,建立了鉴定指标体系 ,论述了各种性能的综合试验与鉴定方法 ,并提出了需要研究的关键技术。  相似文献   

20.
针对“战斧”(DeepFire)巡航导弹武器系统弱点提出对抗和干扰欺骗措施 ,指出了GPS导航系统的弱点 ,设计了GPS干扰 /欺骗机 (GPSSpoofor)的原理模型 ,提出应用同温层气球作为GPS干扰 /欺骗机载体 ,并作了可行性分析、系统生存能力分析、系统对抗效能分析。详细介绍了同温层气球平台的地面、空中保障系统。  相似文献   