共查询到20条相似文献,搜索用时 9 毫秒
1.
This study addresses the design of a three‐stage production/distribution system where the first stage includes the set of established retailers and the second and third stages include the sets of potential distribution centers (DCs) and potential capacitated suppliers, respectively. In this problem, in addition to the fixed location/operating costs associated with locating DCs and suppliers, we consider the coordinated inventory replenishment decisions at the located DCs and retailers along with the appropriate inventory costs explicitly. In particular, we account for the replenishment and holding costs at the retailers and selected DCs, and the fixed plus distance‐based transportation costs between the selected plants and their assigned DCs, and between the selected DCs and their respective retailers, explicitly. The resulting formulation is a challenging mixed‐integer nonlinear programming model for which we propose efficient heuristic solution approaches. Our computational results demonstrate the performance of the heuristic approaches as well as the value of integrated decision‐making by verifying that significant cost savings are realizable when the inventory decisions and costs are incorporated in the production distribution system design. © 2012 Wiley Periodicals, Inc. Naval Research Logistics 59: 172–195, 2012 相似文献
2.
Standard approaches to classical inventory control problems treat satisfying a predefined demand level as a constraint. In many practical contexts, however, total demand is comprised of separate demands from different markets or customers. It is not always clear that constraining a producer to satisfy all markets is an optimal approach. Since the inventory‐related cost of an item depends on total demand volume, no clear method exists for determining a market's profitability a priori, based simply on per unit revenue and cost. Moreover, capacity constraints often limit a producer's ability to meet all demands. This paper presents models to address economic ordering decisions when a producer can choose whether to satisfy multiple markets. These models result in a set of nonlinear binary integer programming problems that, in the uncapacitated case, lend themselves to efficient solution due to their special structure. The capacitated versions can be cast as nonlinear knapsack problems, for which we propose a heuristic solution approach that is asymptotically optimal in the number of markets. The models generalize the classical EOQ and EPQ problems and lead to interesting optimization problems with intuitively appealing solution properties and interesting implications for inventory and pricing management. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2004. 相似文献
3.
装备再制造是实现装备性能恢复的重要手段,对老旧装备进行再制造升级,可以快速将老旧装备性能提升到新的水平,满足基于信息系统的体系作战能力要求。明确了装备再制造升级的概念及作用,分析了国内外装备再制造升级的发展应用,构建了装备再制造升级的工艺与技术体系,提出了我军装备再制造升级的几点思考。 相似文献
4.
虚拟再制造研究的体系框架 总被引:10,自引:0,他引:10
再制造工程是人类社会可持续发展战略的重要保证,虚拟再制造是提高再制造工程效益的重要内容。为了进一步开展广泛而深入地研究,首先需要明确其主要基础理论及重要研究内容。现根据虚拟再制造的显著特点,参考虚拟制造的研究内容,探讨建立了虚拟再制造研究的体系框架。 相似文献
5.
This paper presents several models for the location of facilities subject to congestion. Motivated by applications to locating servers in communication networks and automatic teller machines in bank systems, these models are developed for situations in which immobile service facilities are congested by stochastic demand originating from nearby customer locations. We consider this problem from three different perspectives, that of (i) the service provider (wishing to limit costs of setup and operating servers), (ii) the customers (wishing to limit costs of accessing and waiting for service), and (iii) both the service provider and the customers combined. In all cases, a minimum level of service quality is ensured by imposing an upper bound on the server utilization rate at a service facility. The latter two perspectives also incorporate queueing delay costs as part of the objective. Some cases are amenable to an optimal solution. For those cases that are more challenging, we either propose heuristic procedures to find good solutions or establish equivalence to other well‐studied facility location problems. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2004. 相似文献
6.
Optimizing the selection of resources to accomplish a set of tasks involves evaluating the tradeoffs between the cost of maintaining the resources necessary to accomplish the tasks and the penalty cost associated with unfinished tasks. We consider the case where resources are categorized into types, and limits (capacity) are imposed on the number of each type that can be selected. The objective is to minimize the sum of penalty costs and resource costs. This problem has several practical applications including production planning, new product design, menu selection and inventory management. We develop a branch‐and‐bound algorithm to find exact solutions to the problem. To generate bounds, we utilize a dual ascent procedure which exploits the special structure of the problem. Information from the dual and recovered primal solutions are used to select branching variables. We generate strong valid inequalities and use them to fix other variables at each branching step. Results of tests performed on reasonably sized problems are presented. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 19–37, 1999 相似文献
7.
A fundamental difficulty in developing effective production planning models has been accurately reflecting the nonlinear dependency between workload and lead times. We develop a mathematical programming model for production planning in multiproduct, single stage systems that captures the nonlinear dependency between workload and lead times. We then use outer linearization of this nonlinear model to obtain a linear programming formulation and extend it to multistage systems. Extensive computational experiments validate the approach and compare its results to conventional models that assume workload‐independent planning lead times. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2009 相似文献
8.
In this work, we examine port crane scheduling with spatial and separation constraints. Although common to most port operations, these constraints have not been previously studied. We assume that cranes cannot cross, there is a minimum distance between cranes and jobs cannot be done simultaneously. The objective is to find a crane‐to‐job matching which maximizes throughput under these constraints. We provide dynamic programming algorithms, a probabilistic tabu search, and a squeaky wheel optimization heuristic for solution. Experiments show the heuristics perform well compared with optimal solutions obtained by CPLEX for small scale instances where a squeaky wheel optimization with local search approach gives good results within short times. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004. 相似文献
9.
The Selection Allocation Problem (SAP) is a single period decision problem which involves selecting profit‐maximizing (or cost‐minimizing) activities from various distinct groups, and determining the volume of those activities. The activities in each group are selected subject to the availability of that group's resource, which is provided by either pooling or blending raw inputs from several potential sources. Imbedded in the decision process is the additional task of determining how much raw input is to be allocated to each group to form the resource for that group. Instances of this problem can be found in many different areas, such as in tool selection for flexible manufacturing systems, facility location, and funding for social services. Our goal in this paper is to identify and exploit special structures in the (SAP) and use those structures to develop an efficient solution procedure. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 707–725, 1999 相似文献
10.
装备再制造性工程是再制造工程的重要内容和分支,其主要研究如何在装备设计及使用中能够保证装备末端实现资源的最大化再制造。装备再制造性工程的内容涵盖了装备全寿命周期的各个阶段,较全面地分析了再制造性工程的内涵,初步构建了装备再制造性工程的内容框架,提出了再制造性工程的发展建议,为装备再制造性工程的研究和发展提供了参考。 相似文献
11.
We consider a class of facility location problems with a time dimension, which requires assigning every customer to a supply facility in each of a finite number of periods. Each facility must meet all assigned customer demand in every period at a minimum cost via its production and inventory decisions. We provide exact branch‐and‐price algorithms for this class of problems and several important variants. The corresponding pricing problem takes the form of an interesting class of production planning and order selection problems. This problem class requires selecting a set of orders that maximizes profit, defined as the revenue from selected orders minus production‐planning‐related costs incurred in fulfilling the selected orders. We provide polynomial‐time dynamic programming algorithms for this class of pricing problems, as well as for generalizations thereof. Computational testing indicates the advantage of our branch‐and‐price algorithm over various approaches that use commercial software packages. These tests also highlight the significant cost savings possible from integrating location with production and inventory decisions and demonstrate that the problem is rather insensitive to forecast errors associated with the demand streams. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011 相似文献
12.
This paper finds the optimal integrated production schedule and preventive maintenance plan for a single machine exposed under a cumulative damage process, and investigates how the optimal preventive maintenance plan interacts with the optimal production schedule. The goal is to minimize the total tardiness. The optimal policy possesses the following properties: Under arbitrary maintenance plan when jobs have common processing time, and different due dates, the optimal production schedule is to order the jobs by earliest due date first rule; and when jobs have common due date and different processing times, the optimal production schedule is shortest processing time first. The optimal maintenance plan is of control limit type under any arbitrary production schedule when machine is exposed under a cumulative damage failure process. Numerical studies on the optimal maintenance control limit of the maintenance plan indicate that as the number of jobs to be scheduled increases, the effect of jobs due dates on the optimal maintenance control limit diminishes. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007 相似文献
13.
再制造研究应用现状及发展策略 总被引:2,自引:0,他引:2
以国家“发展循环经济、建设节约型社会”的重大战略为背景,介绍了再制造的内涵和国内外装备再制造研究、应用现状以及策略方法。在此基础上,结合我国现状和特点,分析了我国推动再制造产业发展的需求和潜力,并初步提出我国发展再制造工程存在的问题和应采取的有效措施。 相似文献
14.
We study the problem of recovering a production plan after a disruption, where the disruption may be caused by incidents such as power failure, market change, machine breakdown, supply shortage, worker no‐show, and others. The new recovery plan we seek after has to not only suit the changed environment brought about by the disruption, but also be close to the initial plan so as not to cause too much customer unsatisfaction or inconvenience for current‐stage and downstream operations. For the general‐cost case, we propose a dynamic programming method for the problem. For the convex‐cost case, a general problem which involves both cost and demand disruptions can be solved by considering the cost disruption first and then the demand disruption. We find that a pure demand disruption is easy to handle; and for a pure cost disruption, we propose a greedy method which is provably efficient. Our computational studies also reveal insights that will be helpful to managing disruptions in production planning. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005. 相似文献
15.
Resource-constrained project scheduling problems with cash flows (RCPSPCF) are complex, combinatorial optimization problems. Many heuristics have been reported in the literature that produce reasonable schedules in limited project environments. However, the lack of a heuristic that dominates under differing project conditions can lead to a suboptimal choice of an appropriate heuristic for scheduling any given project. This may result in poor schedules and monetary losses. This paper reports on the application of the tabu search metaheuristic procedure for the RCPSPCF. Strategies for neighborhood generation and candidate selection that exploit the special features of the problem are combined with a simple multiheuristic start procedure. Extensive experimentation, with multiple data sets and comparison with an upper bound, indicates a significant improvement, both in project Net Present Value (NPV) as well as the number of projects, where the metaheuristic outperforms the best known heuristics in the literature. More specifically, this procedure produces the best schedules in over 85% of the projects tested, in contrast to the best single-pass heuristics which have been shown to dominate in at most 20% of the same cases. This iterative, general purpose heuristic is able to adapt significantly better to the complex interactions of the many critical parameters of the RCPSPCF than single-pass heuristics that use more specific information about each project environment. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 912–927, 1999 相似文献
16.
发展装备再制造,提升军用装备保障力和战斗力 总被引:1,自引:0,他引:1
徐滨士 《装甲兵工程学院学报》2006,20(3):1-5
装备再制造是指废旧装备高技术修复、改造的产业化。大力发展装备再制造,可促进高技术在武器装备中的应用,推动武器装备维修保障方式的改变,是节省军费、提高装备性能的重要举措。装备再制造学科的建设是装甲兵工程学院学科建设新的增长点。通过加强宣传、组织试点、合力攻关、培养人才等综合措施,全力推进全军及学院装备再制造的发展。 相似文献
17.
We present a computationally efficient procedure to determine control policies for an infinite horizon Markov Decision process with restricted observations. The optimal policy for the system with restricted observations is a function of the observation process and not the unobservable states of the system. Thus, the policy is stationary with respect to the partitioned state space. The algorithm we propose addresses the undiscounted average cost case. The algorithm combines a local search with a modified version of Howard's (Dynamic programming and Markov processes, MIT Press, Cambridge, MA, 1960) policy iteration method. We demonstrate empirically that the algorithm finds the optimal deterministic policy for over 96% of the problem instances generated. For large scale problem instances, we demonstrate that the average cost associated with the local optimal policy is lower than the average cost associated with an integer rounded policy produced by the algorithm of Serin and Kulkarni Math Methods Oper Res 61 (2005) 311–328. © 2008 Wiley Periodicals, Inc. Naval Research Logistics 2009 相似文献
18.
Philip Cho Vivek Farias John Kessler Retsef Levi Thomas Magnanti Eric Zarybnisky 《海军后勤学研究》2015,62(1):60-80
In this article, we focus on relatively new maintenance and operational scheduling challenges that are faced by the United States Air Force concerning low‐observable (LO) or stealth aircraft. The LO capabilities of an aircraft degrade stochastically as it flies, making it difficult to make maintenance scheduling decisions. Maintainers can address these damages, but must decide, which aircraft should be put into maintenance, and for how long. Using data obtained from an active duty Air Force F‐22 wing and interviews with Air Force maintainers and program specialists, we model this problem as a generalization of the well‐known restless multiarmed bandit superprocess. Specifically, we use an extension of the traditional model to allow for actions that require varying lengths of time, and generate two separate index policies from a single model; one for maintenance actions and one for the flying action. These index policies allow maintenance schedulers to intuitively, quickly, and effectively rank a fleet of aircraft based on each aircraft's LO status and decide, which aircraft should enter into LO maintenance and for how long, and which aircraft should be used to satisfy daily sortie requirements. Finally, we present extensive data‐driven, detailed simulation results, where we compare the performance of the index policies against policies currently used by the Air Force, as well as some other possible more naive heuristics. The results indicate that the index policies significantly outperform existing policies in terms of fully mission capable (FMC) rates. In particular, the experiments highlight the importance of coordinated maintenance and flying decisions. © 2015 Wiley Periodicals, Inc. 62:60–80, 2015 相似文献
19.
We study a multi‐item capacitated lot‐sizing problem with setup times and pricing (CLSTP) over a finite and discrete planning horizon. In this class of problems, the demand for each independent item in each time period is affected by pricing decisions. The corresponding demands are then satisfied through production in a single capacitated facility or from inventory, and the goal is to set prices and determine a production plan that maximizes total profit. In contrast with many traditional lot‐sizing problems with fixed demands, we cannot, without loss of generality, restrict ourselves to instances without initial inventories, which greatly complicates the analysis of the CLSTP. We develop two alternative Dantzig–Wolfe decomposition formulations of the problem, and propose to solve their relaxations using column generation and the overall problem using branch‐and‐price. The associated pricing problem is studied under both dynamic and static pricing strategies. Through a computational study, we analyze both the efficacy of our algorithms and the benefits of allowing item prices to vary over time. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2010 相似文献
20.
在装备再制造周期及再制造费用基本概念的基础上,给出了再制造费用参数的相关内容,并阐述了工程估算法、专家判断估算法、参数估算法、类比估算法等4种装备再制造费用分析及预测估算的方法,构建了基于工程估算法的再制造费用分解结构,并对再制造费用分析流程进行了详细描述,可为形成正确的再制造设计方案提供费用决策依据。 相似文献
