首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
This paper considers a new class of scheduling problems arising in logistics systems in which two different transportation modes are available at the stage of product delivery. The mode with the shorter transportation time charges a higher cost. Each job ordered by the customer is first processed in the manufacturing facility and then transported to the customer. There is a due date for each job to arrive to the customer. Our approach integrates the machine scheduling problem in the manufacturing stage with the transportation mode selection problem in the delivery stage to achieve the global maximum benefit. In addition to studying the NP‐hard special case in which no tardy job is allowed, we consider in detail the problem when minimizing the sum of the total transportation cost and the total weighted tardiness cost is the objective. We provide a branch and bound algorithm with two different lower bounds. The effectiveness of the two lower bounds is discussed and compared. We also provide a mathematical model that is solvable by CPLEX. Computational results show that our branch and bound algorithm is more efficient than CPLEX. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

2.
《防务技术》2020,16(1):242-250
In decades, the battlefield environment is becoming more and more complex with plenty of electronic equipments. Thus, in order to improve the survivability of radar sensors and satisfy the requirement of maneuvering target tracking with a low probability of intercept, a non-myopic scheduling is proposed to minimize the radiation cost with tracking accuracy constraint. At first, the scheduling problem is formulated as a partially observable Markov decision process (POMDP). Then the tracking accuracy and radiation cost over the future finite time horizon are predicted by the posterior carmér-rao lower bound (PCRLB) and the hidden Markov model filter, respectively. Finally, the proposed scheduling is implemented efficiently by utilizing the branch and bound (B&B) pruning algorithm. Simulation results show that the performance of maneuvering target tracking was improved by the improved interacting multiple model (IMM), and the scheduler time and maximum memory consumption were significant reduced by the present B&B pruning algorithm without losing the optimal solution.  相似文献   

3.
In this article, we propose a branch‐and‐price‐and‐cut (BPC) algorithm to exactly solve the manpower routing problem with synchronization constraints (MRPSC). Compared with the classical vehicle routing problems (VRPs), the defining characteristic of the MRPSC is that multiple workers are required to work together and start at the same time to carry out a job, that is, the routes of the scheduling subjects are dependent. The incorporation of the synchronization constraints increases the difficulty of the MRPSC significantly and makes the existing VRP exact algorithm inapplicable. Although there are many types of valid inequalities for the VRP or its variants, so far we can only adapt the infeasible path elimination inequality and the weak clique inequality to handle the synchronization constraints in our BPC algorithm. The experimental results at the root node of the branch‐and‐bound tree show that the employed inequalities can effectively improve the lower bound of the problem. Compared with ILOG CPLEX, our BPC algorithm managed to find optimal solutions for more test instances within 1 hour. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 138–171, 2016  相似文献   

4.
We formulate and solve a discrete‐time path‐optimization problem where a single searcher, operating in a discretized three‐dimensional airspace, looks for a moving target in a finite set of cells. The searcher is constrained by maximum limits on the consumption of one or more resources such as time, fuel, and risk along any path. We develop a specialized branch‐and‐bound algorithm for this problem that uses several network reduction procedures as well as a new bounding technique based on Lagrangian relaxation and network expansion. The resulting algorithm outperforms a state‐of‐the‐art algorithm for solving time‐constrained problems and also is the first algorithm to solve multi‐constrained problems. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

5.
We introduce a formulation and an exact solution method for a nonpreemptive resource constrained project scheduling problem in which the duration/cost of an activity is determined by the mode selection and the duration reduction (crashing) within the mode. This problem is a natural combination of the time/cost tradeoff problem and the resource constrained project scheduling problem. It involves the determination, for each activity, of its resource requirements, the extent of crashing, and its start time so that the total project cost is minimized. We present a branch and bound procedure and report computational results with a set of 160 problems. Computational results demonstrate the effectiveness of our procedure. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 107–127, 2001  相似文献   

6.
在分布式环境下,运用移动Agent技术实现大型复杂系统研究中经常使用的特定数值算法求解,可显著提高计算效率。以分支定界法为例,介绍了其设计思想和实践步骤,并对算法的时间复杂度进行了分析。  相似文献   

7.
This paper presents a branch and bound algorithm for computing optimal replacement policies in a discrete‐time, infinite‐horizon, dynamic programming model of a binary coherent system with n statistically independent components, and then specializes the algorithm to consecutive k‐out‐of‐n systems. The objective is to minimize the long‐run expected average undiscounted cost per period. (Costs arise when the system fails and when failed components are replaced.) An earlier paper established the optimality of following a critical component policy (CCP), i.e., a policy specified by a critical component set and the rule: Replace a component if and only if it is failed and in the critical component set. Computing an optimal CCP is a optimization problem with n binary variables and a nonlinear objective function. Our branch and bound algorithm for solving this problem has memory storage requirement O(n) for consecutive k‐out‐of‐n systems. Extensive computational experiments on such systems involving over 350,000 test problems with n ranging from 10 to 150 find this algorithm to be effective when n ≤ 40 or k is near n. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 288–302, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10017  相似文献   

8.
针对BSC信道,提出了一种线性分组码的最大似然译码差错概率下界的计算方法.根据最大似然译码算法原理,首先将译码差错概率转化为差错事件的联合概率,基于改进的Dawson-Sankoff界的优化准则,推导出BSC信道下线性分组码差错冗余事件的判决准则,最后得到差错概率下界的计算表达式.该下界只依赖于码字的Hamming重量...  相似文献   

9.
The minimum storage‐time sequencing problem generalizes many well‐known problems in combinatorial optimization, such as the directed linear arrangement and the problem of minimizing the weighted sum of completion times, subject to precedence constraints on a single processor. In this paper we propose a new lower bound, based on a Lagrangian relaxation, which can be computed very efficiently. To improve upon this lower bound, we employ a bundle optimization algorithm. We also show that the best bound obtainable by this approach equals the one obtainable from the linear relaxation computed on a formulation whose first Chvàtal closure equals the convex hull of all the integer solutions of the problem. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 313–331, 2001  相似文献   

10.
The purpose of this article is to present an algorithm for globally maximizing the ratio of two convex functions f and g over a convex set X. To our knowledge, this is the first algorithm to be proposed for globally solving this problem. The algorithm uses a branch and bound search to guarantee that a global optimal solution is found. While it does not require the functions f and g to be differentiable, it does require that subgradients of g can be calculated efficiently. The main computational effort of the algorithm involves solving a sequence of subproblems that can be solved by convex programming methods. When X is polyhedral, these subproblems can be solved by linear programming procedures. Because of these properties, the algorithm offers a potentially attractive means for globally maximizing ratios of convex functions over convex sets. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

11.
A naval task group (TG) is a collection of naval combatants and auxiliaries that are grouped together for the accomplishment of one or more missions. Ships forming a TG are located in predefined sectors. We define determination of ship sector locations to provide a robust air defense formation as the sector allocation problem (SAP). A robust formation is one that is very effective against a variety of attack scenarios but not necessarily the most effective against any scenario. We propose a 0‐1 integer linear programming formulation for SAP. The model takes the size and the direction of threat into account as well as the defensive weapons of the naval TG. We develop tight lower and upper bounds by incorporating some valid inequalities and use a branch and bound algorithm to exactly solve SAP. We report computational results that demonstrate the effectiveness of the proposed solution approach. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

12.
利用LFM信号频谱的熵随着调频率减小而降低的性质,提出了一种基于频谱熵最小化的LFM信号调频率的估计SEM方法。建立参数待估的相位补偿因子,通过搜索得到使得补偿后信号频谱熵全局最小的调频率估值。在搜索过程中,采用两级搜索策略,并引入牛顿迭代算法,有效降低了算法复杂度。理论推导和仿真结果证明,该算法为有偏算法,估计偏差量与初始频率相关,理论估计方差比较CR下界低12d B。对雷达实测回波信号进行验证,与离散多项式变换算法相比发现,提出算法估计的鲁棒性更好,并具有较高的测速精度,具有一定的应用价值。  相似文献   

13.
This article is a sequel to a recent article that appeared in this journal, “An extensible modeling framework for dynamic reassignment and rerouting in cooperative airborne operations” [ 17 ], in which an integer programming formulation to the problem of rescheduling in‐flight assets due to changes in battlespace conditions was presented. The purpose of this article is to present an improved branch‐and‐bound procedure to solve the dynamic resource management problem in a timely fashion, as in‐flight assets must be quickly re‐tasked to respond to the changing environment. To facilitate the rapid generation of attractive updated mission plans, this procedure uses a technique for reducing the solution space, supports branching on multiple decision variables simultaneously, incorporates additional valid cuts to strengthen the minimal network constraints of the original mathematical model, and includes improved objective function bounds. An extensive numerical analysis indicates that the proposed approach significantly outperforms traditional branch‐and‐bound methodologies and is capable of providing improved feasible solutions in a limited time. Although inspired by the dynamic resource management problem in particular, this approach promises to be an effective tool for solving other general types of vehicle routing problems. © 2013 Wiley Periodicals, Inc. Naval Research Logistics, 2013  相似文献   

14.
We consider a generalization of the well‐known generalized assignment problem (GAP) over discrete time periods encompassed within a finite planning horizon. The resulting model, MultiGAP, addresses the assignment of tasks to agents within each time period, with the attendant single‐period assignment costs and agent‐capacity constraint requirements, in conjunction with transition costs arising between any two consecutive periods in which a task is reassigned to a different agent. As is the case for its single‐period antecedent, MultiGAP offers a robust tool for modeling a wide range of capacity planning problems occurring within supply chain management. We provide two formulations for MultiGAP and establish that the second (alternative) formulation provides a tighter bound. We define a Lagrangian relaxation‐based heuristic as well as a branch‐and‐bound algorithm for MultiGAP. Computational experience with the heuristic and branch‐and‐bound algorithm on over 2500 test problems is reported. The Lagrangian heuristic consistently generates high‐quality and in many cases near‐optimal solutions. The branch‐and‐bound algorithm is also seen to constitute an effective means for solving to optimality MultiGAP problems of reasonable size. © 2012 Wiley Periodicals, Inc. Naval Research Logistics, 2012  相似文献   

15.
In this paper, a single‐machine scheduling problem with weighted earliness and tardiness penalties is considered. Idle time between two adjacent jobs is permitted and due dates of jobs could be unequal. The dominance rules are utilized to develop a relationship matrix, which allows a branch‐and‐bound algorithm to eliminate a high percentage of infeasible solutions. After combining this matrix with a branching strategy, a procedure to solve the problem is proposed. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 760–780, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10039  相似文献   

16.
Capacity improvement and conditional penalties are two computational aides for fathoming subproblems in a branch‐and‐bound procedure. In this paper, we apply these techniques to the fixed charge transportation problem (FCTP) and show how relaxations of the FCTP subproblems can be posed as concave minimization problems (rather than LP relaxations). Using the concave relaxations, we propose a new conditional penalty and three new types of capacity improvement techniques for the FCTP. Based on computational experiments using a standard set of FCTP test problems, the new capacity improvement and penalty techniques are responsible for a three‐fold reduction in the CPU time for the branch‐and‐bound algorithm and nearly a tenfold reduction in the number of subproblems that need to be evaluated in the branch‐and‐bound enumeration tree. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 341–355, 1999  相似文献   

17.
The location-allocation problem for existing facilities uniformly distributed over rectangular regions is treated for the case where the rectilinear norm is used. The new facilities are to be located such that the expected total weighted distance is minimized. Properties of the problem are discussed. A branch and bound algorithm is developed for the exact solution of the problem. Computational results are given for different sized problems.  相似文献   

18.
Motivated by some practical applications, we study a new integrated loading and transportation scheduling problem. Given a set of jobs, a single crane is available to load jobs, one by one, onto semitrailers with a given capacity. Loaded semitrailers are assigned to tractors for transportation tasks. Subject to limited resources (crane, semitrailers, and tractors), the problem is to determine (1) an assignment of jobs to semitrailers for loading tasks, (2) a sequence for the crane to load jobs onto semitrailers, (3) an assignment of loaded semitrailers to tractors for transportation tasks, and (4) a transportation schedule of assigned tractors such that the completion time of the last transportation task is minimized. We first formulate the problem as a mixed integer linear programming model (MILPM) and prove that the problem is strongly NP‐hard. Then, optimality properties are provided which are useful in establishing an improved MILPM and designing solution algorithms. We develop a constructive heuristic, two LP‐based heuristics, and a recovering beam search heuristic to solve this problem. An improved procedure for solutions by heuristics is also presented. Furthermore, two branch‐and‐bound (B&B) algorithms with two different lower bounds are developed to solve the problem to optimality. Finally, computational experiments using both real data and randomly generated data demonstrate that our heuristics are highly efficient and effective. In terms of computational time and the number of instances solved to optimality in a time limit, the B&B algorithms are better than solving the MILPM. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 416–433, 2015  相似文献   

19.
This paper introduces an efficient heuristic procedure for a special class of mixed integer programming problems called the uncapacitated warehouse (plant) location problem. This procedure is derived from the branching decision rules proposed for the branch and bound algorithm by the author in an earlier paper. It can be viewed as tracing a single path of the branch and bound tree (from the initial node to the terminal node), the path being determined by the particular branching decision rule used. Unlike branch and bound the computational efficiency of this procedure is substantially less than linearly related to the number of potential warehouse locations (integer variables) in the problem. Its computational efficiency is tested on problems found in the literature.  相似文献   

20.
Three methods are used to solve the following problem: For P, a positive constant, maximize (P. Reliability-cost) of a system with standby redundancy. The results show that a method which rounds a noninteger solution to the nearest integer solution can lead to tremendous mistakes. However, neither a well known dynamic programming algorithm nor a previously developed branch and bound technique are able to solve large size problems. The solution of problems of large dimension thus requires the use of the noninteger solution of the first method to limit the number of possible solutions when using either the dynamic programming algorithm or a modified branch and bound technique. With this assistance, the branch and bound technique is able to solve large problems in a short amount of computational time.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号