排序方式: 共有64条查询结果,搜索用时 359 毫秒
11.
12.
13.
By running life tests at higher stress levels than normal operating conditions, accelerated life testing (ALT) quickly yields information on the lifetime distribution of a test unit. The lifetime at the design stress is then estimated through extrapolation using a regression model. In constant‐stress testing, a unit is tested at a fixed stress level until failure or the termination time point of test, whereas step‐stress testing allows the experimenter to gradually increase the stress levels at some prefixed time points during the test. In this work, the optimal k‐level constant‐stress and step‐stress ALTs are compared for the exponential failure data under complete sampling and Type‐I censoring. The objective is to quantify the advantage of using the step‐stress testing relative to the constant‐stress one. Assuming a log‐linear life–stress relationship with the cumulative exposure model for the effect of changing stress in step‐stress testing, the optimal design points are determined under C/D/A‐optimality criteria. The efficiency of step‐stress testing to constant‐stress one is then discussed in terms of the ratio of optimal objective functions based on the information matrix. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 00: 000–000, 2013 相似文献
14.
装备研制方案评估的群决策方法研究 总被引:5,自引:3,他引:2
针对装备研制方案的群决策问题,分析了常规决策方法的不足之处,并指出在某些情况下,按照常规的处理思路,可能会将合理的方案当成劣解而无意中排除。提出采用改进的优序法来解决装备研制方案的群决策问题,从而达到提高决策质量的目的,给出了计算实例。 相似文献
15.
The use of a single vendor for each inventoried item is usually assumed in most of the inventory models. However, there are situations where the use of more than one vendor should be considered, especially when lead times are stochastic. This research presents a theoretical investigation of the effect of cost structures on the relative performance of sole-sourcing versus dual-sourcing inventory control policies. We show that except for cases where the ordering cost is high, the lead-time variability is low, or the customer service level is low, dual sourcing performs better than sole sourcing under the normally distributed demand and shifted-exponential lead times. Moreover, the computational results indicate the dual sourcing provides a better service level than sole sourcing at the optimal solutions, and that dual sourcing results in larger order quantities than sole sourcing, which suggests that attractive quantity discounts may not be in jeopardy when dual sourcing is employed. Finally, because it is generally known that multiple sourcing can enhance the competition among suppliers, material managers should consider splitting purchase orders when two equally qualified suppliers are available. © 1994 John Wiley & Sons, Inc. 相似文献
16.
关于研究生“三助”工作的设想 总被引:1,自引:0,他引:1
魏赤 《兵团教育学院学报》2008,18(3):48-49
本文旨在阐述研究生“三助”工作在高校教育管理工作中的拓展空间,探讨做好研究生“三助”工作以及与学业奖学金互补的可行办法。 相似文献
17.
用仿真模型研究了仓库物资的发放过程,定量解决了如何科学合理地分配一条作业线中作业机械的使用问题。根据这一结果,研究了在给定作业量的情况下如何确定作业机械数量的方法。 相似文献
18.
Since a system and its components usually deteriorate with age, preventive maintenance (PM) is often performed to restore or keep the function of a system in a good state. Furthermore, PM is capable of improving the health condition of the system and thus prolongs its effective age. There has been a vast amount of research to find optimal PM policies for deteriorating repairable systems. However, such decisions involve numerous uncertainties and the analyses are typically difficult to perform because of the scarcity of data. It is therefore important to make use of all information in an efficient way. In this article, a Bayesian decision model is developed to determine the optimal number of PM actions for systems which are maintained according to a periodic PM policy. A non‐homogeneous Poisson process with a power law failure intensity is used to describe the deteriorating behavior of the repairable system. It is assumed that the status of the system after a PM is somewhere between as good as new for a perfect repair and as good as old for a minimal repair, and for failures between two preventive maintenances, the system undergoes minimal repairs. Finally, a numerical example is given and the results of the proposed approach are discussed after performing sensitivity analysis. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2008 相似文献
19.
We study a deterministic two‐machine flowshop scheduling problem with an assumption that one of the two machines is not available in a specified time period. This period can be due to a breakdown, preventive maintenance, or processing unfinished jobs from a previous planning horizon. The problem is known to be NP‐hard. Pseudopolynomial dynamic programming algorithms and heuristics with worst case error bounds are given in the literature to solve the problem. They are different for the cases when the unavailability interval is for the first or second machine. The existence of a fully polynomial time approximation scheme (FPTAS) was formulated as an open conjecture in the literature. In this paper, we show that the two cases of the problem under study are equivalent to similar partition type problems. Then we derive a generic FPTAS for the latter problems with O(n5/ε4) time complexity. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2004. 相似文献
20.