首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   180篇
  免费   72篇
  国内免费   6篇
  2023年   2篇
  2022年   2篇
  2021年   4篇
  2020年   9篇
  2019年   3篇
  2018年   4篇
  2017年   9篇
  2016年   12篇
  2015年   12篇
  2014年   14篇
  2013年   12篇
  2012年   15篇
  2011年   19篇
  2010年   6篇
  2009年   14篇
  2008年   10篇
  2007年   9篇
  2006年   18篇
  2005年   18篇
  2004年   14篇
  2003年   7篇
  2002年   6篇
  2001年   6篇
  2000年   12篇
  1999年   7篇
  1998年   10篇
  1997年   1篇
  1995年   1篇
  1994年   1篇
  1991年   1篇
排序方式: 共有258条查询结果,搜索用时 15 毫秒
101.
A single server is faced with a collection of jobs of varying duration and urgency. Each job has a random lifetime during which it is available for nonpreemptive service. Should a job's lifetime expire before its service begins then it is lost from the system unserved. The goal is to schedule the jobs for service to maximize the expected number served to completion. Two heuristics have been proposed in the literature. One (labeled πS) operates a static priority among the job classes and works well in a “no premature job loss” limit, whereas the second (πM) is a myopic heuristic which works well when lifetimes are short. Both can exhibit poor performance for problems at some distance from the regimes for which they were designed. We develop a robustly good heuristic by an approximative approach to the application of a policy improvement step to the asymptotically optimal heuristic πS, in which we use a fluid model to obtain an approximation for the value function of πS. The performance of the proposed heuristic is investigated in an extensive numerical study. © 2010 Wiley Periodicals, Inc. Naval Research Logistics 2010  相似文献   
102.
We consider the problem of assigning a set of jobs to different parallel machines of the same processing speed, where each job is compatible to only a subset of those machines. The machines can be linearly ordered such that a higher‐indexed machine can process all those jobs that a lower‐indexed machine can process. The objective is to minimize the makespan of the schedule. This problem is motivated by industrial applications such as cargo handling by cranes with nonidentical weight capacities, computer processor scheduling with memory constraints, and grades of service provision by parallel servers. We develop an efficient algorithm for this problem with a worst‐case performance ratio of + ε, where ε is a positive constant which may be set arbitrarily close to zero. We also present a polynomial time approximation scheme for this problem, which answers an open question in the literature. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   
103.
装备维修管理系统是一种新型维修管理模式,为解决现代装备协同维修过程中资源优化调度和分配的各类问题,从装备维修保障系统的需求分析入手,讨论了基于改进遗传算法的维修资源配置算法,并采用建模与仿真技术,设计实现了装备维修管理系统。  相似文献   
104.
Lot splitting refers to breaking a production lot into smaller sublots during production. Coordinating lot splitting decisions across multiple stages of a production process is a challenging task. Traditional lot splitting and lot streaming models implicitly assume that the entire system is operated and owned by the same firm, or there exists a coordinator who controls the operation of all machines in the system. In this paper, we consider the situation where the machines in a multiple‐stage production process are owned and managed by different companies. Every item in a given production lot has to go through the processing by the supplier's machine, followed by the manufacturer's machine, and so on. We develop and analyze coordination mechanisms that enable different parties in the supply chain to coordinate their lot splitting decisions so as to achieve a systemwide optimum. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   
105.
We study linear programming models that contain transportation constraints in their formulation. Typically, these models have a multistage nature and the transportation constraints together with the associated flow variables are used to achieve consistency between consecutive stages. We describe how to reformulate these models by projecting out the flow variables. The reformulation can be more desirable since it has fewer variables and can be solved faster. We apply these ideas to reformulate two well‐known workforce staffing and scheduling problems: the shift scheduling problem and the tour scheduling problem. We also present computational results. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   
106.
针对灵巧成像卫星对地面目标观测摆角的计算问题,考虑地球自转和卫星在轨运动等约束,利用空间坐标变换建立了基于椭球体的空间运动学模型.在此模型的基础上,给出了任意时刻卫星对目标观测摆角的计算方法.仿真结果验证了方法的正确性.任意时刻观测摆角的获取为灵巧成像卫星任务调度提供支持.  相似文献   
107.
One of the major problems in modeling production systems is how to treat the job arrival process. Restrictive assumptions such as Markovian arrivals do not represent real world systems, especially if the arrival process is generated by job departures from upstream workstations. Under these circumstances, cost‐effective policies that are robust with respect to the nature of the arrival process become of interest. In this paper, we focus on minimizing the expected total holding and setup costs in a two‐stage produce‐to‐order production system operated by a cross‐trained worker. We will show that if setup times are insignificant in comparison with processing times, then near‐optimal policies can be generated with very robust performances with respect to the arrival process. We also present conditions under which these near‐optimal policies can be obtained by using only the arrival and service rates. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   
108.
电磁探测卫星对区域目标的覆盖搜索在反恐及海上搜救等领域发挥着重要作用.针对电磁探测卫星区域搜索任务中存在的空域频域不确定性,构建了电磁探测卫星区域搜索问题(EDSASP)中不确定因素的量化描述模型及决策要素模型,提出了基于贝叶斯决策的电磁卫星任务规划方法,并以信息探测收益和前端截获收益为优化目标,建立了空域频域不确定条...  相似文献   
109.
分析了目前嵌入式操作系统调度策略的现状,指出了传统调度方法的不足之处,给出了多策略调度模型,该模型根据进程的属性参数决定采用哪种调度算法。多策略调度模型采用两级调度方案,即在原传统调度方法的基础上增加一级调度。一级调度确定多个调度算法的优先顺序;二级调度确定同一种调度算法中,的进程优先顺序。该模型使进程调度更加灵活和高效,应用范围更广。  相似文献   
110.
We consider open‐shop scheduling problems where operation‐processing times are a convex decreasing function of a common limited nonrenewable resource. The scheduler's objective is to determine the optimal job sequence on each machine and the optimal resource allocation for each operation in order to minimize the makespan. We prove that this problem is NP‐hard, but for the special case of the two‐machine problem we provide an efficient optimization algorithm. We also provide a fully polynomial approximation scheme for solving the preemptive case. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号