排序方式: 共有90条查询结果,搜索用时 0 毫秒
81.
This article studies the problem of designing Bayesian sampling plans (BSP) with interval censored samples. First, an algorithm for deriving the conventional BSP is proposed. The BSP is shown to possess some monotonicity. Based on the BSP and using the property of monotonicity, a new sampling plan modified by the curtailment procedure is proposed. The resulting curtailed Bayesian sampling plan (CBSP) can reduce the duration time of life test experiment, and it is optimal in the sense that its associated Bayes risk is smaller than the Bayes risk of the BSP if the cost of the duration time of life test experiment is considered. A numerical example to compute the Bayes risks of BSP and CBSP and related quantities is given. Also, a Monte Carlo simulation study is performed to illustrate the performance of the CBSP compared with the BSP. The simulation results demonstrate that our proposed CBSP has better performance because it has smaller risk. The CBSP is recommended. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 604–616, 2015 相似文献
82.
83.
邱鉴发 《军械工程学院学报》1991,(1)
本文针对现行紧固件原材料进厂抽样复验方法的不足,套改《ISO2859计数抽查程序和图表》,提出动态抽样方案,并对新旧方案实际应用进行了比较。以比较科学的决策,取得提高效益、降低消耗的结果. 相似文献
84.
应急物资保障计划辅助决策模型 总被引:2,自引:0,他引:2
提出了一个制定应急物资保障计划的流程,构建了制定应急物资保障计划的数学模型,并应用运筹学的方法对其进行了优化.该模型为制定应急物资保障计划提供了有效的途径. 相似文献
85.
86.
Accelerated life testing (ALT) is commonly used to obtain reliability information about a product in a timely manner. Several stress loading designs have been proposed and recent research interests have emerged concerning the development of equivalent ALT plans. Step‐stress ALT (SSALT) is one of the most commonly used stress loadings because it usually shortens the test duration and reduces the number of required test units. This article considers two fundamental questions when designing a SSALT and provides formal proofs in answer to each. Namely: (1) can a simple SSALT be designed so that it is equivalent to other stress loading designs? (2) when optimizing a multilevel SSALT, does it degenerate to a simple SSALT plan? The answers to both queries, under certain reasonable model assumptions, are shown to be a qualified YES. In addition, we provide an argument to support the rationale of a common practice in designing a SSALT, that is, setting the higher stress level as high as possible in a SSALT plan. © 2012 Wiley Periodicals, Inc. Naval Research Logistics, 2013 相似文献
87.
88.
采用UML对装备保障计划从静态和动态两个框架进行建模,直观形象地描述了装备保障计划的内容,为装备保障计划的自动生成提供了理论基础,并且以陆军师弹药保障计划为例进行说明。 相似文献
89.
90.
汶川地震灾后重建住房规划环境制约因素及对策 总被引:1,自引:0,他引:1
汶川特大地震发生,四川省共有153个县(市、区)不同程度受灾,全省灾区需完成城乡住房重建49131.22万m^2(445.4万套),重建城乡住房规划受到资源、环境的制约。通过对其制约因素分析,提出了对环境保护、资源保护有针对性的措施和对策,并对住房选址和建设生态人居环境提出了建议,有利于灾后重建城乡住房规划向建设生态人居环境方向发展。 相似文献