首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   253篇
  免费   92篇
  国内免费   13篇
  2023年   4篇
  2022年   5篇
  2021年   6篇
  2020年   10篇
  2019年   7篇
  2018年   4篇
  2017年   14篇
  2016年   21篇
  2015年   19篇
  2014年   21篇
  2013年   15篇
  2012年   25篇
  2011年   27篇
  2010年   12篇
  2009年   23篇
  2008年   14篇
  2007年   13篇
  2006年   24篇
  2005年   20篇
  2004年   17篇
  2003年   8篇
  2002年   6篇
  2001年   8篇
  2000年   13篇
  1999年   7篇
  1998年   10篇
  1997年   2篇
  1995年   1篇
  1994年   1篇
  1991年   1篇
排序方式: 共有358条查询结果,搜索用时 15 毫秒
61.
This study addresses cyclic scheduling in robotic flowshops with bounded work‐in‐process (WIP) levels. The objective is to minimize the cycle time or, equivalently, to maximize the throughput, under the condition that the WIP level is bounded from above by a given integer number. We present several strongly polynomial algorithms for the 2‐cyclic robotic flowshop scheduling problems for various WIP levels. © 2010 Wiley Periodicals, Inc. Naval Research Logistics 58: 1–16, 2011  相似文献   
62.
科学工作流技术研究综述   总被引:5,自引:2,他引:3       下载免费PDF全文
科学工作流管理系统(Scientific Workflow Management Systems,SWfMS)为科学家提供一个管理大规模复杂科学计算的有效平台,通过管理复杂应用程序对海量科学数据进行管理、分析、仿真和可视化以帮助科学家进行科学发现.本文首先对科学工作流(Scientific Workflow,SWF)...  相似文献   
63.
对地观测卫星(EOS)的应用任务建模是任务规划与调度的重要组成部分.从对地观测卫星系统的组成、应用任务特点以及建模基本要素等3个方面,对应用任务进行了详细的分析,其中特点包括任务周期性、严格的时间限制性、实体属性的复杂性以及任务的突发性等,建模基本要素主要包括约束条件和活动.在此基础上,使用规划领域定义语言(PDDL)...  相似文献   
64.
针对效用网格下基于优先级因子的工作流时间-费用优化问题,基于工作流的同步完成特征对任务进行分层并提出三种实时调度算法:基于逆向分层的sufferage(BLSuff)、基于逆向分层的min-min(BLMin)及基于逆向分层的min-max(BLMax)。算法设计基于优先级因子的衡量标准对时间与费用同时进行优化,并为任务设置期望完成时间以达到充分利用费用优化空间进行费用优化的目标。实验结果表明这三种算法在各种优先级因子下都能对工作流的执行时间与执行费用进行较好的优化。  相似文献   
65.
提出了一种基于Multi-Agent的虚拟维修训练系统(VMTS)结构框架,整个系统分别由主控Agent、仿真Agent、和接口Agent3个具有交互作用的Agent组成,从而将虚拟维修训练系统的开发转化为一个多Agent系统的设计与开发.基于多Agent的框架结构可实现受训者的智能模型及虚拟训练场景中虚拟物体的行为模型,从而可以提高VMTS的健壮性和可重用性.基于Agent的概念模型实现了Agent之间的交互和协作,并介绍了主控Agent和仿真Agent的具体实现方法.  相似文献   
66.
This paper presents a new methodology to solve the cyclic preference scheduling problem for hourly workers. The focus is on nurse rostering but is applicable to any organization in which the midterm scheduling decision must take into account a complex of legal, institutional, and preferential constraints. The objective is to strike a balance between satisfying individual preferences and minimizing personnel costs. The common practice is to consider each planning period independently and to generate new rosters at the beginning of each. To reduce some of the instability in the process, there is a growing trend toward cyclic schedules, which are easier to manage and are generally perceived to be more equitable. To address this problem, a new integer programming model is presented that combines the elements of both cyclic and preference scheduling. To find solutions, a branch‐and‐price algorithm is developed that makes use of several branching rules and an extremely effective rounding heuristic. A unique feature of the formulation is that the master problem contains integer rather than binary variables. Computational results are reported for problem instances with up to 200 nurses. Most were solved within 10 minutes and many within 3 minutes when a double aggregation approach was applicable. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007.  相似文献   
67.
In the classical multiprocessor scheduling problem independent jobs must be assigned to parallel, identical machines with the objective of minimizing the makespan. This article explores the effect of assignment restrictions on the jobs for multiprocessor scheduling problems. This means that each job can only be processed on a specific subset of the machines. Particular attention is given to the case of processing times restricted to one of two values, 1 and λ, differing by at most 2. A matching based polynomial time ε‐approximation algorithm is developed that has a performance ratio tending to . This algorithm is shown to have the best possible performance, tending to 3/2, for processing times 1 and 2. For the special case of nested processing sets, i.e., when the sets of machines upon which individual jobs may be assigned are non‐overlapping, the behavior of list scheduling algorithms is explored. Finally, for assignment restrictions determined by just one characteristic of the machines, such as disc storage or memory constraint in the case of high performance computing, we contribute an algorithm that provides a 3/2 worst case bound and runs in time linear in the number of jobs. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   
68.
卫星数传调度模型研究   总被引:4,自引:2,他引:2       下载免费PDF全文
卫星数传调度问题是一个具有多时间窗口、多资源约束的优化问题。针对该问题,建立了卫星数传需求模型、任务模型和调度模型。在建模过程中,采用了框架模型形式,把问题中的主要约束封闭于每个数传任务中,这在降低调度模型复杂度的同时,也降低了调度算法设计难度。还提出了调度算法设计思想,并设计了一基于灵活度的调度算法。仿真表明,所建立的模型及算法对解决卫星数传调度问题是可行的。  相似文献   
69.
In this paper, we investigate multiclass feedback queues with gated disciplines. The server selects the stations by a nonpreemptive priority scheduling algorithm and serves customers in the selected station by either a gated FCFS discipline or a gated priority discipline. We take a rather systematic approach to their mean sojourn times. We define conditional expected sojourn times for all customers and derive their expressions from an analysis of busy periods. Since they are shown to be linear in some components of the system states, their steady state mean values can be derived from simple limiting procedures. These mean values can be obtained from a set of linear equations. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 719–741, 2003.  相似文献   
70.
We consider scheduling problems involving two agents (agents A and B), each having a set of jobs that compete for the use of a common machine to process their respective jobs. The due dates of the A‐jobs are decision variables, which are determined by using the common (CON) or slack (SLK) due date assignment methods. Each agent wants to minimize a certain performance criterion depending on the completion times of its jobs only. Under each due date assignment method, the criterion of agent A is always the same, namely an integrated criterion consisting of the due date assignment cost and the weighted number of tardy jobs. Several different criteria are considered for agent B, including the maxima of regular functions (associated with each job), the total (weighted) completion time, and the weighted number of tardy jobs. The overall objective is to minimize the performance criterion of agent A, while keeping the objective value of agent B no greater than a given limit. We analyze the computational complexity, and devise polynomial or pseudo‐polynomial dynamic programming algorithms for the considered problems. We also convert, if viable, any of the devised pseudopolynomial dynamic programming algorithms into a fully polynomial‐time approximation scheme. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 416–429, 2016  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号