首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   5篇
  免费   0篇
  2013年   2篇
  1975年   2篇
  1974年   1篇
排序方式: 共有5条查询结果,搜索用时 31 毫秒
1
1.
2.
In this paper, we consider the problem of minimizing the mean flow time of jobs to be processed on two machines. The jobs have a predetermined order, perhaps reflecting the order of arrival, and each job has a known processing time. We wish to assign the jobs to machines so as to minimize the mean flow time, with the constraint that the original order must be preserved within the subset of jobs assigned to each machine. An efficient algorithm based on dynamic programming is developed.  相似文献   
3.
The problem of sequencing n jobs on one machine is considered, under the multiple objective of minimizing mean flow time with the minimum number of tardy jobs. A simple procedure is first proposed to schedule for minimum flow time with a specified subset of jobs on time. This is used in conjunction with Moore's Algorithm in a simple heuristic producing good and often optimal schedules. A branch-bound algorithm is presented to produce the optimal schedule efficiently with the help of several theorems which eliminate much branching.  相似文献   
4.
5.
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号