首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   3篇
  免费   0篇
  2013年   1篇
  2000年   1篇
  1992年   1篇
排序方式: 共有3条查询结果,搜索用时 62 毫秒
1
1.
In this short note we study a two‐machine flowshop scheduling problem with the additional no‐idle feasibility constraint and the total completion time criterion function. We show that one of the few papers which deal with this special problem contains incorrect claims and suggest a way how these claims can be rectified. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47:353–358, 2000  相似文献   
2.
We show that the deterministic nonpreemptive scheduling problem with earliness and tardiness penalties can be solved in polynomial time for certain forms of an objective function provided that a certain optimization problem can be solved. We give instances where this problem has a solution and show that this generalizes several results from the literature. These results do not require symmetric penalization and the penalty functions need only be lower semicontinuous.  相似文献   
3.
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号