首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   2篇
  免费   0篇
  2013年   1篇
  2002年   1篇
排序方式: 共有2条查询结果,搜索用时 37 毫秒
1
1.
Full‐system testing for large‐scale systems is often infeasible or very costly. Thus, when estimating system reliability, it is desirable to use a method that uses subsystem tests, which are often less expensive and more feasible. This article presents a method for bounding full‐system reliabilities based on subsystem tests and, if available, full‐system tests. The method does not require that subsystems be independent. It accounts for dependencies through the use of certain probability inequalities. The inequalities provide the basis for valid reliability calculations while not requiring independent subsystems or full‐system tests. The inequalities allow for test information on pairwise subsystem failure modes to be incorporated, thereby improving the bound on system reliability. We illustrate some of the properties of the estimates via an example application. © 2013 Wiley Periodicals, Inc. Naval Research Logistics, 2013  相似文献   
2.
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号