首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   2篇
  免费   0篇
  1997年   1篇
  1992年   1篇
排序方式: 共有2条查询结果,搜索用时 0 毫秒
1
1.
This article considers the problem of equipment replacement in which the replacement decision at a particular time must take into account (i) the state of the existing machine in use, (ii) the available replacement alternatives at the time, (iii) the future advances in the relevant technologies with regard to the equipment under consideration, and (iv) costs of switching between different technologies. A methodology that attains minimal forecast horizons for the problem is developed. A numerical example illustrates the methodology.  相似文献   
2.
This article considers optimization problems in a discrete capacitated lot sizing model for a single product with limited backlogging. The demand as well as the holding and backlogging costs are assumed to be periodical in time. Nothing is assumed about types of the cost functions. It is shown that there exists an optimal infinite inverse policy and a strong turnpike policy. A forward algorithm for computing optimal policies relative to the class of batch ordering type policies is derived. Some backward procedure is adopted to determine a strong turnpike policy. The algorithm is simple, and it terminates after the a number of steps equal to the turnpike horizon. Some remarks on the existence of rolling horizontal plans and forecast horizons are also given. © 1997 John Wiley & Sons, Inc. Naval Research Logistics 44: 775–790, 1997  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号