首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   2篇
  免费   0篇
  2005年   1篇
  1984年   1篇
排序方式: 共有2条查询结果,搜索用时 140 毫秒
1
1.
The war against terrorism has brought Somalia, a country located in a key strategic region, back onto the radar of US and Western security concerns. Following a vicious civil war, a failed peace support operation and several attempts to start a peace process, lawless Somalia, a country without government, has gained the potential to be exploited as a terrorist base. Although this country in the Horn of Africa does not represent a direct and immediate threat to the US or its Western allies, its potential to destabilize the region is extremely high. This article offers an analysis of Somalia's potential to become a ground for terrorist activities and suggests a two-track approach. On the one hand, US foreign and security policy in Somalia needs to be more assertive; on the other, the only way to prevent Somalia from becoming a fertile ground for international terrorist groups is to help stabilize the country. In order to achieve this objective, it is crucial to adopt any initiative aimed at strengthening Somalia's civil society.  相似文献   
2.
An inferential procedure is presented which provides confidence intervals for a future reliability parameter when reliability growth testing is only partially completed. Hypothesis tests based on this method are uniformly most powerful unbiased. These results are applicable if (1) the system failure rate can be modeled as the intensity function of a Weibull process and (2) efforts to improve reliability are assumed to continue at a steady rate throughout the intervening period of testing. The usefulness of this methodology is illustrated by evaluating the risk of not reaching some future reliability milestone. If such risk is unacceptably high, program management may have time to identify problem areas and take corrective action before testing has ended. As a consequence, a more reliable system may be developed without incurring overruns in the scheduling or cost of the development program.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号