首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   29篇
  免费   3篇
  2020年   1篇
  2019年   1篇
  2017年   3篇
  2016年   2篇
  2015年   1篇
  2013年   6篇
  2012年   2篇
  2011年   1篇
  2010年   1篇
  2009年   2篇
  2008年   1篇
  2007年   1篇
  2004年   6篇
  2003年   1篇
  2002年   1篇
  2001年   1篇
  1999年   1篇
排序方式: 共有32条查询结果,搜索用时 15 毫秒
1.
In this article, we consider the concurrent open shop scheduling problem to minimize the total weighted completion time. When the number of machines is arbitrary, the problem has been shown to be inapproximable within a factor of 4/3 ‐ ε for any ε > 0 if the unique games conjecture is true in the literature. We propose a polynomial time approximation scheme for the problem under the restriction that the number of machines is fixed. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   
2.
In this article, we discuss the optimal allocation problem in a multiple stress levels life‐testing experiment when an extreme value regression model is used for statistical analysis. We derive the maximum likelihood estimators, the Fisher information, and the asymptotic variance–covariance matrix of the maximum likelihood estimators. Three optimality criteria are defined and the optimal allocation of units for two‐ and k‐stress level situations are determined. We demonstrate the efficiency of the optimal allocation of units in a multiple stress levels life‐testing experiment by using real experimental situations discussed earlier by McCool and Nelson and Meeker. Monte Carlo simulations are used to show that the optimality results hold for small sample sizes as well. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   
3.
We state a balancing problem for mixed model assembly lines with a paced moving conveyor as: Given the daily assembling sequence of the models, the tasks of each model, the precedence relations among the tasks, and the operations parameters of the assembly line, assign the tasks of the models to the workstations so as to minimize the total overload time. Several characteristics of the problem are investigated. A line‐balancing heuristic is proposed based on a lower bound of the total overload time. A practical procedure is provided for estimating the deviation of any given line‐balance solution from the theoretical optimum. Numerical examples are given to illustrate the methodology. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   
4.
Extending Sastry's result on the uncapacitated two‐commodity network design problem, we completely characterize the optimal solution of the uncapacitated K‐commodity network design problem with zero flow costs for the case when K = 3. By solving a set of shortest‐path problems on related graphs, we show that the optimal solutions can be found in O(n3) time when K = 3, where n is the number of nodes in the network. The algorithm depends on identifying a list of “basic patterns”; the number of basic patterns grows exponentially with K. We also show that the uncapacitated K‐commodity network design problem can be solved in O(n3) time for general K if K is fixed; otherwise, the time for solving the problem is exponential. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   
5.
In this paper we study higher‐order Markov chain models for analyzing categorical data sequences. We propose an efficient estimation method for the model parameters. Data sequences such as DNA and sales demand are used to illustrate the predicting power of our proposed models. In particular, we apply the developed higher‐order Markov chain model to the server logs data. The objective here is to model the users' behavior in accessing information and to predict their behavior in the future. Our tests are based on a realistic web log and our model shows an improvement in prediction. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   
6.
7.
For computing an optimal (Q, R) or kindred inventory policy, the current literature provides mixed signals on whether or when it is safe to approximate a nonnormal lead‐time‐demand (“LTD”) distribution by a normal distribution. The first part of this paper examines this literature critically to justify why the issue warrants further investigations, while the second part presents reliable evidence showing that the system‐cost penalty for using the normal approximation can be quite serious even when the LTD‐distribution's coefficient of variation is quite low—contrary to the prevalent view of the literature. We also identify situations that will most likely lead to large system‐cost penalty. Our results indicate that, given today's technology, it is worthwhile to estimate an LTD‐distribution's shape more accurately and to compute optimal inventory policies using statistical distributions that more accurately reflect the LTD‐distributions' actual shapes. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2003  相似文献   
8.
By running life tests at higher stress levels than normal operating conditions, accelerated life testing (ALT) quickly yields information on the lifetime distribution of a test unit. The lifetime at the design stress is then estimated through extrapolation using a regression model. In constant‐stress testing, a unit is tested at a fixed stress level until failure or the termination time point of test, whereas step‐stress testing allows the experimenter to gradually increase the stress levels at some prefixed time points during the test. In this work, the optimal k‐level constant‐stress and step‐stress ALTs are compared for the exponential failure data under complete sampling and Type‐I censoring. The objective is to quantify the advantage of using the step‐stress testing relative to the constant‐stress one. Assuming a log‐linear life–stress relationship with the cumulative exposure model for the effect of changing stress in step‐stress testing, the optimal design points are determined under C/D/A‐optimality criteria. The efficiency of step‐stress testing to constant‐stress one is then discussed in terms of the ratio of optimal objective functions based on the information matrix. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 00: 000–000, 2013  相似文献   
9.
We study a deterministic two‐machine flowshop scheduling problem with an assumption that one of the two machines is not available in a specified time period. This period can be due to a breakdown, preventive maintenance, or processing unfinished jobs from a previous planning horizon. The problem is known to be NP‐hard. Pseudopolynomial dynamic programming algorithms and heuristics with worst case error bounds are given in the literature to solve the problem. They are different for the cases when the unavailability interval is for the first or second machine. The existence of a fully polynomial time approximation scheme (FPTAS) was formulated as an open conjecture in the literature. In this paper, we show that the two cases of the problem under study are equivalent to similar partition type problems. Then we derive a generic FPTAS for the latter problems with O(n54) time complexity. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   
10.
We consider a container terminal discharging containers from a ship and locating them in the terminal yard. Each container has a number of potential locations in the yard where it can be stored. Containers are moved from the ship to the yard using a fleet of vehicles, each of which can carry one container at a time. The problem is to assign each container to a yard location and dispatch vehicles to the containers so as to minimize the time it takes to download all the containers from the ship. We show that the problem is NP‐hard and develop a heuristic algorithm based on formulating the problem as an assignment problem. The effectiveness of the heuristic is analyzed from both worst‐case and computational points of view. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 363–385, 2001  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号