排序方式: 共有8条查询结果,搜索用时 234 毫秒
1
1.
设备的一种计划维修策略 总被引:1,自引:0,他引:1
本文根据设备在全寿命内有事后修理、计划修理和最后报废的实际情况,以全寿命内单位时间的更新维修期望费用最少为目标函数,建立一种数学模型,寻求设备在全寿命内最佳计划修理次数N和最佳的一组计划维修时间间隔集T。 相似文献
2.
3.
对两类主要影响因素分别建立了相应的数学模型.依据约化理论,建立了维修费用的VAR模型.同时,根据统计资料分析了实际舰载主要设备的故障规律,指出了传统定时维修方式的理论基础的不完整性. 相似文献
4.
Edward G. Keating 《Defence and Peace Economics》2013,24(2):191-223
This paper models and simulates a government‐contractor principal‐agent weapon system repair model. Insights are derived as to how government repair contracts should be constructed so as to induce optimal contractor behavior. The paper's general conclusion is that the best contracting approach combines a lump‐sum payment that does not vary with the number of units repaired, expensive item cost‐sharing, and a contractor‐provided availability guarantee. Provided there is intercontractor competition, this type of contract performs well even if the government is poorly informed about weapon system break patterns or repair costs. 相似文献
5.
6.
分析了海军装备目前的维修现状以及存在的问题,论述了实行视情维修的重要性和必要性,提出了建立以视情维修为主的预防性维修大纲的原则. 相似文献
7.
8.
1