Abstract: | ![]() In this article we consider a cumulative damage shock model under a periodic preventive maintenance (PM) policy. The PM is imperfect in the sense that each PM reduces the damage level by 100(1 – b)%, 0 < b < 1. A system suffers damage due to shocks and fails when the damage level exceeds some threshold. We derive a sufficient condition for the time to failure to have an IFR distribution. We also discuss the associated problem of finding the number of PM's that minimizes the expected cost rate. |