首页 | 本学科首页   官方微博 | 高级检索  
   检索      


Cyclical schedules for the joint replenishment problem with dynamic demands
Authors:Ian R Webb  Bruce R Buzby  Gerard M Campbell
Abstract:The Joint Replenishment Problem (JRP) involves production planning for a family of items. The items have a coordinated cost structure whereby a major setup cost is incurred whenever any item in the family is produced, and an item-specific minor setup cost is incurred whenever that item is produced. This paper investigates the performance of two types of cyclical production schedules for the JRP with dynamic demands over a finite planning horizon. The cyclical schedules considered are: (1) general cyclical schedules—schedules where the number of periods between successive production runs for any item is constant over the planning horizon—and (2) power-of-two schedules—a subset of cyclical schedules for which the number of periods between successive setups must be a power of 2. The paper evaluates the additional cost incurred by requiring schedules to be cyclical, and identifies problem characteristics that have a significant effect on this additional cost. © 1997 John Wiley & Sons, Inc. Naval Research Logistics 44: 577–589, 1997.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号