首页 | 本学科首页   官方微博 | 高级检索  
     


A heuristic method for facility planning in telecommunications networks with multiple alternate routes
Authors:İ  lker Baybars,Richard H. Edahl
Abstract:
Given point-to-point demand forecasts of transmission facilities for services such as voice or data transmission in each period of a finite planning horizon, a decision has to be made as to which types of transmission facilities—together with the amounts of transmission circuits—are to be installed, if any, on each link of the telecommunications network, in each period of the planning horizon. The availability of alternative transmission systems with significantly different costs and circuit capacities necessitates the determination of a minimum (discounted) cost facility installation scheme. This combinatoric choice problem is complicated by the availability of switching equipments enabling the transmission of some of the traffic through intermediary points. This possibility of alternately routing the traffic or the facility requirements of certain point pairs further complicates the problem while creating the opportunity to benefit from economies of scale. We present here a heuristic method for finding a good solution for the general problem; namely, we consider multiple transmission systems and multiple alternate routes. Numerical examples are given and computational experience is reported.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号