Scheduling to minimize the weighted sum of completion times with secondary criteria |
| |
Authors: | Richard N. Burns |
| |
Abstract: | A result of Smith previously published in this journal [3], on the use of secondary criteria in scheduling problems, is shown to be incorrect and a counter example is presented. Heck and Roberts [2] suggested that their paper would be extended in the same way Smith's algorithm was. A new algorithm is given that converges to a local optimum for both problems. |
| |
Keywords: | |
|
|