首页 | 本学科首页   官方微博 | 高级检索  
   检索      


Multiproduct lot-size scheduling with proportional product demands
Authors:F H Murphy  A L Soyster
Abstract:In this paper we consider the multiproduct, multiperiod production-scheduling model of Manne under the assumption that, across products, demands are interrelated over time. When demand requirements are proportional we show that the solution has a specific structure determined by the ratio of setup to production-run time of each product. This structure holds for any length horizon and may permit a substantial (time) savings for column generation solution procedures.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号