The development and evaluation of a cost-based composite scheduling rule
Authors:Sumer C Aggarwal  Bruce A McCarl
Abstract:A cost-based composite scheduling rule is developed and evaluated in comparison with three other well-researched scheduling rules—SPT, S/OPN, and SST. This cost rule permits the optimization of more than one performance measure at a time. The priority number that is used for scheduling operations through each machine group is based on four separate performance measures—(1) In-process Inventory, (2) Facilities Utilization, (3) Lateness, and (4) Mean Setup Time. The factorial experimental design involved three factor levels of loads, three factor levels of cost, and three factor levels of mean time. Analysis of variance was performed on each of the five output measures to study the effects of each of the three factors on each individual rule. Rank-order comparisons between rules were also made; and, finally, general conclusions with regard to the effectiveness and flexibility of the Cost Rule were drawn.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号