首页 | 本学科首页   官方微博 | 高级检索  
   检索      


Economic design of a two-stage control chart based on both performance and surrogate variables
Authors:Jooho Lee  Woo-Joo Kwon
Abstract:The traditional approach to economic design of control charts is based on the assumption that a process is monitored using only a performance variable. If, however, the performance variable is costly to measure and a less expensive surrogate variable is available, the process may be more efficiently controlled by using both performance and surrogate variables. In this article we propose a model for economic design of a two-stage control chart which uses a highly correlated surrogate variable together with a performance variable. The process is assumed to be monitored by the surrogate variable until it signals out-of-control behavior, then by the performance variable until it signals out-of-control behavior or maintains in-control signals for a prespecified amount of time, and the two variables are used in alternating fashion. An algorithm based on the direct search method of Hooke and Jeeves 6] is used to find the optimum values of design parameters. The proposed model is applied to the end-closure welding process for nuclear fuel to compute the amount of reduction in cost compared with the current control procedure. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 958–977, 1999
Keywords:economic design  two-stage control chart  performance variable  surrogate variable
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号