首页 | 本学科首页   官方微博 | 高级检索  
   检索      


Multiproduct batching and scheduling with buffered rework: The case of a car paint shop
Authors:Florian Jaehn  Sergey Kovalev  Mikhail Y Kovalyov  Erwin Pesch
Institution:1. Institute of Sustainable Operations and Logistics at the University of Augsburg, Universitaetsstr. 16, , D‐86159 Augsburg, Germany;2. INSEEC Business School ECE Lyon, , 69001 Lyon, France;3. United Institute of Informatics Problems, National Academy of Sciences of Belarus, , 220012 Minsk, Belarus;4. Institute of Information Systems at the University of Siegen, Hoelderlinstra?e 3, , D‐57076 Siegen, Germany
Abstract:We study a problem of scheduling products on the same facility, which is motivated by a car paint shop. Items of the same product are identical. Operations on the items are performed sequentially in batches, where each batch is a set of operations on the same product. Some of the produced items are of the required good quality and some items can be defective. Defectiveness of an item is determined by a given simulated function of its product, its preceding product, and the position of its operation in the batch. Defective items are kept in a buffer of a limited capacity, and they are then remanufactured at the same facility. A minimum waiting time exists for any defective item before its remanufacturing can commence. Each product has a sequence independent setup time which precedes its first operation or its operation following an operation of another product. A due date is given for each product such that all items of the same product have the same due date and the objective is to find a schedule which minimizes maximum lateness of product completion times with respect to their due dates. The problem is proved NP‐hard in the strong sense, and a heuristic Group Technology (GT) solution approach is suggested and analyzed. The results justify application of the GT approach to scheduling real car paint shops with buffered rework. © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 458–471, 2014
Keywords:production  scheduling  batching  rework  group technology  car painting
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号