首页 | 本学科首页   官方微博 | 高级检索  
   检索      


Scheduling and due‐date quotation in a make‐to‐order supply chain
Authors:Philip Kaminsky  Onur Kaya
Institution:1. Department of Industrial Engineering and Operations Research, University of California, Berkeley, California 94720;2. Department of Industrial Engineering, Koc University, Istanbul, Turkey
Abstract:We consider a manufacturer, served by a single supplier, who has to quote due dates to arriving customers in a make‐to‐order production environment. The manufacturer is penalized for long lead times and for missing due dates. To meet due dates, the manufacturer has to obtain components from a supplier. We model this manufacturer and supplier as a two‐machine flow shop, consider several variations of this problem, and design effective due‐date quotation and scheduling algorithms for centralized and decentralized versions of the model. We perform extensive computational testing to assess the effectiveness of our algorithms and to compare the centralized and decentralized models to quantify the value of centralized control in a make‐to‐order supply chain. Since complete information exchange and centralized control is not always practical or cost‐effective, we explore the value of partial information exchange for this system. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008
Keywords:scheduling  due‐date quotation  supply chain management
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号