首页 | 本学科首页   官方微博 | 高级检索  
   检索      


Alternate methods of project scheduling with limited resources
Authors:James H Patterson
Abstract:The applicability of critical path scheduling is limited by the inability of the algorithm to cope with conflicting resource demands. This paper is an assessment of the effectiveness of many of the heuristic extensions to the critical path method which resolve the conflicts that develop between the resources demanded by an activity and those available. These heuristic rules are evaluated on their ability to solve a large multiproject scheduling problem.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号