Multidirectional scheduling scheme in resource‐constrained project schedulingproblem
Authors:Hamid R. Yoosefzadeh  Hamed R. Tareghian  Mohammad H. Farahi
Affiliation:1. Faculty of Mathematical Sciences, Ferdowsi University of Mashhad, Mashhad, Iran;2. Department of Mathematical Sciences, Payam Noor University, Tehran, Iran
Abstract:In 2000, Klein showed that bidirectional scheduling schemes (bidss) outperform single‐directional scheduling schemes (e.g., forward or backward schemes). In 2010, Yoosefzadeh, et al. [J Math Model Algor 9 (2010), 357–373] showed that depending on the nature of the problems and also the type of priority rules used, schedules produced by a so‐called tridirectional scheduling scheme (trdss) yields shorter makespans when compared to forward, backward, and even bidss. Since the justification technique is applied in many of the state‐of‐the‐art algorithms nowadays, we show that the tuned version of the trdss outperforms the double justification technique. Moreover, we investigate the circumstances under which the trdss is more probable to generate schedules with shorter makespans. To this end, we introduce a new measure of resource requirements and their distributions, namely total amount of overflows. Our analytical as well as empirical investigations show that when the new measure is increased, it is more probable to obtain schedules with shorter makespans using the trdss. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 61: 44–55, 2014
Keywords:scheduling schemes  resource complexity measures  double justification technique  tridirectional scheduling scheme
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号