首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
Motivated by some practical applications, we study a new integrated loading and transportation scheduling problem. Given a set of jobs, a single crane is available to load jobs, one by one, onto semitrailers with a given capacity. Loaded semitrailers are assigned to tractors for transportation tasks. Subject to limited resources (crane, semitrailers, and tractors), the problem is to determine (1) an assignment of jobs to semitrailers for loading tasks, (2) a sequence for the crane to load jobs onto semitrailers, (3) an assignment of loaded semitrailers to tractors for transportation tasks, and (4) a transportation schedule of assigned tractors such that the completion time of the last transportation task is minimized. We first formulate the problem as a mixed integer linear programming model (MILPM) and prove that the problem is strongly NP‐hard. Then, optimality properties are provided which are useful in establishing an improved MILPM and designing solution algorithms. We develop a constructive heuristic, two LP‐based heuristics, and a recovering beam search heuristic to solve this problem. An improved procedure for solutions by heuristics is also presented. Furthermore, two branch‐and‐bound (B&B) algorithms with two different lower bounds are developed to solve the problem to optimality. Finally, computational experiments using both real data and randomly generated data demonstrate that our heuristics are highly efficient and effective. In terms of computational time and the number of instances solved to optimality in a time limit, the B&B algorithms are better than solving the MILPM. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 416–433, 2015  相似文献   

2.
We study a multi‐item capacitated lot‐sizing problem with setup times and pricing (CLSTP) over a finite and discrete planning horizon. In this class of problems, the demand for each independent item in each time period is affected by pricing decisions. The corresponding demands are then satisfied through production in a single capacitated facility or from inventory, and the goal is to set prices and determine a production plan that maximizes total profit. In contrast with many traditional lot‐sizing problems with fixed demands, we cannot, without loss of generality, restrict ourselves to instances without initial inventories, which greatly complicates the analysis of the CLSTP. We develop two alternative Dantzig–Wolfe decomposition formulations of the problem, and propose to solve their relaxations using column generation and the overall problem using branch‐and‐price. The associated pricing problem is studied under both dynamic and static pricing strategies. Through a computational study, we analyze both the efficacy of our algorithms and the benefits of allowing item prices to vary over time. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

3.
We consider the infinite horizon serial inventory system with both average cost and discounted cost criteria. The optimal echelon base‐stock levels are obtained in terms of only probability distributions of leadtime demands. This analysis yields a novel approach for developing bounds and heuristics for optimal inventory control polices. In addition to deriving the known bounds in literature, we develop several new upper bounds for both average cost and discounted cost models. Numerical studies show that the bounds and heuristic are very close to optimal.© 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

4.
We present the green telecommunication network planning problem with switchable base stations, where the location and configuration of the base stations are optimized, while taking into account uncertainty and variability of demand. The problem is formulated as a two‐stage stochastic program under demand uncertainty with integers in both stages. Since solving the presented problem is computationally challenging, we develop the corresponding Dantzig‐Wolfe reformulation and propose a solution approach based on column generation. Comprehensive computational results are provided for instances of varying characteristics. The results show that the joint location and dynamic switching of base stations leads to significant savings in terms of energy cost. Up to 30% reduction in power consumption cost is achieved while still serving all users. In certain cases, allowing dynamic configurations leads to more installed base stations and higher user coverage, while having lower total energy consumption. The Dantzig‐Wolfe reformulation provides solutions with a tight LP‐gap eliminating the need for a full branch‐and‐price scheme. Furthermore, the proposed column generation solution approach is computationally efficient and outperforms CPLEX on the majority of the tested instances. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 351–366, 2016  相似文献   

5.
The scheduling problem addressed in this paper concerns a manufacturer who produces a variety of product types and operates in a make‐to‐order environment. Each customer order consists of known quantities of the different product types, and must be delivered as a single shipment. Periodically the manufacturer schedules the accumulated and unscheduled customer orders. Instances of this problem occur across industries in manufacturing as well as in service environments. In this paper we show that the problem of minimizing the weighted sum of customer order delivery times is unary NP‐hard. We characterize the optimal schedule, solve several special cases of the problem, derive tight lower bounds, and propose several heuristic solutions. We report the results of a set of computational experiments to evaluate the lower bounding procedures and the heuristics, and to determine optimal solutions. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

6.
We are concerned with the problem of scheduling m items, facing constant demand rates, on a single facility to minimize the long-run average holding, backorder, and setup costs. The inventory holding and backlogging costs are charged at a linear time weighted rate. We develop a lower bound on the cost of all feasible schedules and extend recent developments in the economic lot scheduling problem, via time-varying lot sizes, to find optimal or near-optimal cyclic schedules. The resulting schedules are used elsewhere as target schedules when demands are random. © 1992 John Wiley & Sons, Inc.  相似文献   

7.
Products with short life cycles are becoming increasingly common in many industries, such as the personal computer (PC) and mobile phone industries. Traditional forecasting methods and inventory policies can be inappropriate for forecasting demand and managing inventory for a product with a short life cycle because they usually do not take into account the characteristics of the product life cycle. This can result in inaccurate forecasts, high inventory cost, and low service levels. Besides, many forecasting methods require a significant demand history, which is available only after the product has been sold for some time. In this paper, we present an adaptive forecasting algorithm with two characteristics. First, it uses structural knowledge on the product life cycle to model the demand. Second, it combines knowledge on the demand that is available prior to the launch of the product with actual demand data that become available after the introduction of the product to generate and update demand forecasts. Based on the forecasting algorithm, we develop an optimal inventory policy. Since the optimal inventory policy is computationally expensive, we propose three heuristics and show in a numerical study that one of the heuristics generates near‐optimal solutions. The evaluation of our approach is based on demand data from a leading PC manufacturer in the United States, where the forecasting algorithm has been implemented. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   

8.
We study an infinite‐horizon, N‐stage, serial production/inventory system with two transportation modes between stages: regular shipping and expedited shipping. The optimal inventory policy for this system is a top–down echelon base‐stock policy, which can be computed through minimizing 2N nested convex functions recursively (Lawson and Porteus, Oper Res 48 (2000), 878–893). In this article, we first present some structural properties and comparative statics for the parameters of the optimal inventory policies, we then derive simple, newsvendor‐type lower and upper bounds for the optimal control parameters. These results are used to develop near optimal heuristic solutions for the echelon base‐stock policies. Numerical studies show that the heuristic performs well. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

9.
We present an algorithm called the exact ceiling point algorithm (XCPA) for solving the pure, general integer linear programming problem (P). A recent report by the authors demonstrates that, if the set of feasible integer solutions for (P) is nonempty and bounded, all optimal solutions for (P) are “feasible 1-ceiling points,” roughly, feasible integer solutions lying on or near the boundary of the feasible region for the LP-relaxation associated with (P). Consequently, the XCPA solves (P) by implicitly enumerating only feasible 1-ceiling points, making use of conditional bounds and “double backtracking.” We discuss the results of computational testing on a set of 48 problems taken from the literature.  相似文献   

10.
In this article, we define a scheduling/packing problem called the Job Splitting Problem, motivated by the practices in the printing industry. There are n types of items to be produced on an m‐slot machine. A particular assignment of the types to the slots is called a “run” configuration and requires a setup cost. Once a run begins, the production continues according to that configuration and the “length” of the run represents the quantity produced in each slot during that run. For each unit of production in excess of demand, there is a waste cost. Our goal is to construct a production plan, i.e., a set of runs, such that the total setup and waste cost is minimized. We show that the problem is strongly NP‐hard and propose two integer programming formulations, several preprocessing steps, and two heuristics. We also provide a worst‐case bound for one of the heuristics. Extensive tests on real‐world and randomly generated instances show that the heuristics are both fast and effective, finding near‐optimal solutions. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

11.
A classical and important problem in stochastic inventory theory is to determine the order quantity (Q) and the reorder level (r) to minimize inventory holding and backorder costs subject to a service constraint that the fill rate, i.e., the fraction of demand satisfied by inventory in stock, is at least equal to a desired value. This problem is often hard to solve because the fill rate constraint is not convex in (Q, r) unless additional assumptions are made about the distribution of demand during the lead‐time. As a consequence, there are no known algorithms, other than exhaustive search, that are available for solving this problem in its full generality. Our paper derives the first known bounds to the fill‐rate constrained (Q, r) inventory problem. We derive upper and lower bounds for the optimal values of the order quantity and the reorder level for this problem that are independent of the distribution of demand during the lead time and its variance. We show that the classical economic order quantity is a lower bound on the optimal ordering quantity. We present an efficient solution procedure that exploits these bounds and has a guaranteed bound on the error. When the Lagrangian of the fill rate constraint is convex or when the fill rate constraint does not exist, our bounds can be used to enhance the efficiency of existing algorithms. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 635–656, 2000  相似文献   

12.
We consider the problem of scheduling N jobs on M parallel machines so as to minimize the maximum earliness or tardiness cost incurred for each of the jobs. Earliness and tardiness costs are given by general (but job-independent) functions of the amount of time a job is completed prior to or after a common due date. We show that in problems with a nonrestrictive due date, the problem decomposes into two parts. Each of the M longest jobs is assigned to a different machine, and all other jobs are assigned to the machines so as to minimize their makespan. With these assignments, the individual scheduling problems for each of the machines are simple to solve. We demonstrate that several simple heuristics of low complexity, based on this characterization, are asymptotically optimal under mild probabilistic conditions. We develop attractive worst-case bounds for them. We also develop a simple closed-form lower bound for the minimum cost value. The bound is asymptotically accurate under the same probabilistic conditions. In the case where the due date is restrictive, the problem is more complex only in the sense that the set of initial jobs on the machines is not easily characterized. However, we extend our heuristics and lower bounds to this general case as well. Numerical studies exhibit that these heuristics perform excellently even for small- or moderate-size problems both in the restrictive and nonrestrictive due-date case. © 1997 John Wiley & Sons, Inc.  相似文献   

13.
We address the capacitated lot‐sizing and scheduling problem with setup times, setup carry‐over, back‐orders, and parallel machines as it appears in a semiconductor assembly facility. The problem can be formulated as an extension of the capacitated lot‐sizing problem with linked lot‐sizes (CLSPL). We present a mixed integer (MIP) formulation of the problem and a new solution procedure. The solution procedure is based on a novel “aggregate model,” which uses integer instead of binary variables. The model is embedded in a period‐by‐period heuristic and is solved to optimality or near‐optimality in each iteration using standard procedures (CPLEX). A subsequent scheduling routine loads and sequences the products on the parallel machines. Six variants of the heuristic are presented and tested in an extensive computational study. © 2009 Wiley Periodicals, Inc. Naval Research Logistics 2009  相似文献   

14.
We study a stochastic outpatient appointment scheduling problem (SOASP) in which we need to design a schedule and an adaptive rescheduling (i.e., resequencing or declining) policy for a set of patients. Each patient has a known type and associated probability distributions of random service duration and random arrival time. Finding a provably optimal solution to this problem requires solving a multistage stochastic mixed‐integer program (MSMIP) with a schedule optimization problem solved at each stage, determining the optimal rescheduling policy over the various random service durations and arrival times. In recognition that this MSMIP is intractable, we first consider a two‐stage model (TSM) that relaxes the nonanticipativity constraints of MSMIP and so yields a lower bound. Second, we derive a set of valid inequalities to strengthen and improve the solvability of the TSM formulation. Third, we obtain an upper bound for the MSMIP by solving the TSM under the feasible (and easily implementable) appointment order (AO) policy, which requires that patients are served in the order of their scheduled appointments, independent of their actual arrival times. Fourth, we propose a Monte Carlo approach to evaluate the relative gap between the MSMIP upper and lower bounds. Finally, in a series of numerical experiments, we show that these two bounds are very close in a wide range of SOASP instances, demonstrating the near‐optimality of the AO policy. We also identify parameter settings that result in a large gap in between these two bounds. Accordingly, we propose an alternative policy based on neighbor‐swapping. We demonstrate that this alternative policy leads to a much tighter upper bound and significantly shrinks the gap.  相似文献   

15.
Chemotherapy appointment scheduling is a challenging problem due to the uncertainty in premedication and infusion durations. In this paper, we formulate a two‐stage stochastic mixed integer programming model for the chemotherapy appointment scheduling problem under limited availability of nurses and infusion chairs. The objective is to minimize the expected weighted sum of nurse overtime, chair idle time, and patient waiting time. The computational burden to solve real‐life instances of this problem to optimality is significantly high, even in the deterministic case. To overcome this burden, we incorporate valid bounds and symmetry breaking constraints. Progressive hedging algorithm is implemented in order to solve the improved formulation heuristically. We enhance the algorithm through a penalty update method, cycle detection and variable fixing mechanisms, and a linear approximation of the objective function. Using numerical experiments based on real data from a major oncology hospital, we compare our solution approach with several scheduling heuristics from the relevant literature, generate managerial insights related to the impact of the number of nurses and chairs on appointment schedules, and estimate the value of stochastic solution to assess the significance of considering uncertainty.  相似文献   

16.
In this paper we propose some non‐greedy heuristics and develop an Augmented‐Neural‐Network (AugNN) formulation for solving the classical open‐shop scheduling problem (OSSP). AugNN is a neural network based meta‐heuristic approach that allows integration of domain‐specific knowledge. The OSSP is framed as a neural network with multiple layers of jobs and machines. Input, output and activation functions are designed to enforce the problem constraints and embed known heuristics to generate a good feasible solution fast. Suitable learning strategies are applied to obtain better neighborhood solutions iteratively. The new heuristics and the AugNN formulation are tested on several benchmark problem instances in the literature and on some new problem instances generated in this study. The results are very competitive with other meta‐heuristic approaches, both in terms of solution quality and computational times. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

17.
The well‐known generalized assignment problem (GAP) involves the identification of a minimum‐cost assignment of tasks to agents when each agent is constrained by a resource in limited supply. The multi‐resource generalized assignment problem (MRGAP) is the generalization of the GAP in which there are a number of different potentially constraining resources associated with each agent. This paper explores heuristic procedures for the MRGAP. We first define a three‐phase heuristic which seeks to construct a feasible solution to MRGAP and then systematically attempts to improve the solution. We then propose a modification of the heuristic for the MRGAP defined previously by Gavish and Pirkul. The third procedure is a hybrid heuristic that combines the first two heuristics, thus capturing their relative strengths. We discuss extensive computational experience with the heuristics. The hybrid procedure is seen to be extremely effective in solving MRGAPs, generating feasible solutions to more than 99% of the test problems and consistently producing near‐optimal solutions. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 468–483, 2001  相似文献   

18.
We consider a two‐level system in which a warehouse manages the inventories of multiple retailers. Each retailer employs an order‐up‐to level inventory policy over T periods and faces an external demand which is dynamic and known. A retailer's inventory should be raised to its maximum limit when replenished. The problem is to jointly decide on replenishment times and quantities of warehouse and retailers so as to minimize the total costs in the system. Unlike the case in the single level lot‐sizing problem, we cannot assume that the initial inventory will be zero without loss of generality. We propose a strong mixed integer program formulation for the problem with zero and nonzero initial inventories at the warehouse. The strong formulation for the zero initial inventory case has only T binary variables and represents the convex hull of the feasible region of the problem when there is only one retailer. Computational results with a state‐of‐the art solver reveal that our formulations are very effective in solving large‐size instances to optimality. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

19.
We consider the optimal control of a production inventory‐system with a single product and two customer classes where items are produced one unit at a time. Upon arrival, customer orders can be fulfilled from existing inventory, if there is any, backordered, or rejected. The two classes are differentiated by their backorder and lost sales costs. At each decision epoch, we must determine whether or not to produce an item and if so, whether to use this item to increase inventory or to reduce backlog. At each decision epoch, we must also determine whether or not to satisfy demand from a particular class (should one arise), backorder it, or reject it. In doing so, we must balance inventory holding costs against the costs of backordering and lost sales. We formulate the problem as a Markov decision process and use it to characterize the structure of the optimal policy. We show that the optimal policy can be described by three state‐dependent thresholds: a production base‐stock level and two order‐admission levels, one for each class. The production base‐stock level determines when production takes place and how to allocate items that are produced. This base‐stock level also determines when orders from the class with the lower shortage costs (Class 2) are backordered and not fulfilled from inventory. The order‐admission levels determine when orders should be rejected. We show that the threshold levels are monotonic (either nonincreasing or nondecreasing) in the backorder level of Class 2. We also characterize analytically the sensitivity of these thresholds to the various cost parameters. Using numerical results, we compare the performance of the optimal policy against several heuristics and show that those that do not allow for the possibility of both backordering and rejecting orders can perform poorly.© 2010 Wiley Periodicals, Inc. Naval Research Logistics 2010  相似文献   

20.
We consider a two‐stage supply chain, in which multi‐items are shipped from a manufacturing facility or a central warehouse to a downstream retailer that faces deterministic external demand for each of the items over a finite planning horizon. The items are shipped through identical capacitated vehicles, each incurring a fixed cost per trip. In addition, there exist item‐dependent variable shipping costs and inventory holding costs at the retailer for items stored at the end of the period; these costs are constant over time. The sum of all costs must be minimized while satisfying the external demand without backlogging. In this paper we develop a search algorithm to solve the problem optimally. Our search algorithm, although exponential in the worst case, is very efficient empirically due to new properties of the optimal solution that we found, which allow us to restrict the number of solutions examined. Second, we perform a computational study that compares the empirical running time of our search methods to other available exact solution methods to the problem. Finally, we characterize the conditions under which each of the solution methods is likely to be faster than the others and suggest efficient heuristic solutions that we recommend using when the problem is large in all dimensions. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号