In this paper the problem of finding an optimal schedule for the n-job, M-machine flowshop scheduling problem is considered when there is no intermediate space to hold partially completed jobs and the objective function is to minimize the weighted sum of idle times on all machines. By assuming that jobs are processed as early as possible, the problem is modeled as a traveling salesman problem and solved by known solution techniques for the traveling salesman problem. A sample problem is solved and a special case, one involving only two machines, is discussed.  相似文献   

2.
A method previously devised for the solution of the p-center problem on a network has now been extended to solve the analogous minimax location-allocation problem in continuous space. The essence of the method is that we choose a subset of the n points to be served and consider the circles based on one, two, or three points. Using a set-covering algorithm we find a set of p such circles which cover the points in the relaxed problem (the one with m < n points). If this is possible, we check whether the n original points are covered by the solution; if so, we have a feasible solution to the problem. We now delete the largest circle with radius rp (which is currently an upper limit to the optimal solution) and try to find a better feasible solution. If we have a feasible solution to the relaxed problem which is not feasible to the original, we augment the relaxed problem by adding a point, preferably the one which is farthest from its nearest center. If we have a feasible solution to the original problem and we delete the largest circle and find that the relaxed problem cannot be covered by p circles, we conclude that the latest feasible solution to the original problem is optimal. An example of the solution of a problem with ten demand points and two and three service points is given in some detail. Computational data for problems of 30 demand points and 1–30 service points, and 100, 200, and 300 demand points and 1–3 service points are reported.  相似文献   

3.
A procurement problem, as formulated by Murty [10], is that of determining how many pieces of equipment units of each of m types are to be purchased and how this equipment is to be distributed among n stations so as to maximize profit, subject to a budget constraint. We have considered a generalization of Murty's procurement problem and developed an approach using duality to exploit the special structure of this problem. By using our dual approach on Murty's original problem, we have been able to solve large problems (1840 integer variables) with very modest computational effort. The main feature of our approach is the idea of using the current evaluation of the dual problem to produce a good feasible solution to the primal problem. In turn, the availability of good feasible solutions to the primal makes it possible to use a very simple subgradient algorithm to solve the dual effectively.  相似文献   

4.
Given a positive integer R and a weight for each vertex in a graph, the maximum-weight connected graph (MCG) problem is to find a connected subgraph with R vertices that maximizes the sum of the weights. The MCG problem is strongly NP-complete, and we study a special case of it: the constrained MCG (CMCG) problem, which is the MCG problem with a constraint of having a predetermined vertex included in the solution. We first show that the Steiner tree problem is a special case of the CMCG problem. Then we present three optimization algorithms for the CMCG problem. The first two algorithms deal with special graphs (tree and layered graphs) and employ different dynamic programming techniques, solving the CMCG problem in polynomial times. The third one deals with a general graph and uses a variant of the Balas additive method with an imbedded connectivity test and a pruning method. We also present a heuristic algorithm for the CMCG problem with a general graph and its bound analysis. We combine the two algorithms, heuristic and optimization, and present a practical solution method to the CMCG problem. Computational results are reported and future research issues are discussed. © 1996 John Wiley & Sons, Inc.  相似文献   

5.
The problem considered in this article is a generalization of the familiar makespan problem, in which n jobs are allocated among m parallel processors, so as to minimize the maximum time (or cost) on any processor. Our problem is more general, in that we allow the processors to have (a) different initial costs, (b) different utilization levels before new costs are incurred, and (c) different rates of cost increase. A heuristic adapted from the bin-packing problem is shown to provide solutions which are close to optimal as the number of iterations is allowed to increase. Computational testing, over a large number of randomly generated problem instances, suggests that heuristic errors are, on average, very small.  相似文献   

6.
The dynamic transportation problem is a transportation problem over time. That is, a problem of selecting at each instant of time t, the optimal flow of commodities from various sources to various sinks in a given network so as to minimize the total cost of transportation subject to some supply and demand constraints. While the earliest formulation of the problem dates back to 1958 as a problem of finding the maximal flow through a dynamic network in a given time, the problem has received wider attention only in the last ten years. During these years, the problem has been tackled by network techniques, linear programming, dynamic programming, combinational methods, nonlinear programming and finally, the optimal control theory. This paper is an up-to-date survey of the various analyses of the problem along with a critical discussion, comparison, and extensions of various formulations and techniques used. The survey concludes with a number of important suggestions for future work.  相似文献   

7.
We consider a single-product, discrete-time production/inventory-control problem with nonstationary concave nondecreasing costs. Given a forecast horizon K, the problem is to find a decision horizon. We specialize to piecewise linear costs a general approach whereby a problem with horizon K + 1 and arbitrary final demand is parametrically solved. The resulting algorithm is polynomial in the input size.  相似文献   

8.
Recent efforts to improve lower bounds in implicit enumeration algorithms for the general (n/m/G/Fmax) sequencing problem have been directed to the solution of an auxiliary single machine problem that results from the relaxation of some of the interference constraints. We develop an algorithm that obtains optimal and near optimal solutions for this relaxed problem with relatively little computational effort. We report on computational results achieved when this method is used to obtain lower bounds for the general problem. Finally, we show the equivalence of this problem to a single machine sequencing problem with earliest start and due date constraints where the objective is to minimize the maximum lateness.  相似文献   

9.
The 0-1 multiple-knapsack problem is an extension of the well-known 0-1 knapsack problem. It is a problem of assigning m objects, each having a value and a weight, to n knapsacks in such a way that the total weight in each knapsack is less than its capacity limit and the total value in the knapsacks is maximized. A branch-and-bound algorithm for solving the problem is developed and tested. Branching rules that avoid the search of redundant partial solutions are used in the algorithm. Various bounding techniques, including Lagrangean and surrogate relaxations, are investigated and compared.  相似文献   

10.
In this paper, we consider a variant of the classical transportation problem as well as of the bottleneck transportation problem, which we call the minimax transportation problem. The problem considered is to determine a feasible flow xij from a set of origins I to a set of destinations J for which max(i,j)εIxJ{cijxij} is minimum. In this paper, we develop a parametric algorithm and a primal-dual algorithm to solve this problem. The parametric algorithm solves a transportation problem with parametric upper bounds and the primal-dual algorithm solves a sequence of related maximum flow problems. The primal-dual algorithm is shown to be polynomially bounded. Numerical investigations with both the algorithms are described in detail. The primal-dual algorithm is found to be computationally superior to the parametric algorithm and it can solve problems up to 1000 origins, 1000 destinations and 10,000 arcs in less than 1 minute on a DEC 10 computer system. The optimum solution of the minimax transportation problem may be noninteger. We also suggest a polynomial algorithm to convert this solution into an integer optimum solution.  相似文献   

11.
We consider the parallel replacement problem in which machine investment costs exhibit economy of scale which is modeled through associating both fixed and variable costs with machine investment costs. Both finite- and infinite-horizon cases are investigated. Under the three assumptions made in the literature on the problem parameters, we show that the finite-horizon problem with time-varying parameters is equivalent to a shortest path problem and hence can be solved very efficiently, and give a very simple and fast algorithm for the infinite-horizon problem with time-invariant parameters. For the general finite-horizon problem without any assumption on the problem parameters, we formulate it as a zero-one integer program and propose an algorithm for solving it exactly based on Benders' decomposition. Computational results show that this solution algorithm is efficient, i.e., it is capable of solving large scale problems within a reasonable cpu time, and robust, i.e., the number of iterations needed to solve a problem does not increase quickly with the problem size. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 279–295, 1998  相似文献   

12.
This article concerns the scheduling of n jobs around a common due date, so as to minimize the average total earliness plus total lateness of the jobs. Optimality conditions for the problem are developed, based on its equivalence to an easy scheduling problem. It seems that this problem inherently has a huge number of optimal solutions and an algorithm is developed to find many of them. The model is extended to allow for the availability of multiple parallel processors and an efficient algorithm is developed for that problem. In this more general case also, the algorithm permits great flexibility in finding an optimal schedule.  相似文献   

13.
The loading problem involves the optimal allocation of n objects, each having a specified weight and value, to m boxes, each of specified capacity. While special cases of these problems can be solved with relative ease, the general problem having variable item weights and box sizes can become very difficult to solve. This paper presents a heuristic procedure for solving large loading problems of the more general type. The procedure uses a surrogate procedure for reducing the original problem to a simpler knapsack problem, the solution of which is then employed in searching for feasible solutions to the original problem. The procedure is easy to apply, and is capable of identifying optimal solutions if they are found.  相似文献   

14.
This paper does not present a new result, rather it is meant to illustrate the choice of modelling procedures available to an analyst in a typical inventory control problem. The same “average cost per unit time” expression is developed by three quite different procedures. This variety of approaches, as well as the recounting of the author's chronological efforts to solve the problem, should be of interest to the reader. The specific inventory problem studied is one where the controller of an item is faced with random opportunities for replenishment at a reduced setup cost; the problem is an integral component of the broader problem of inventory control of a group of items whose replenishments are coordinated to reduce the costs of production, procurement, and/or transportation.  相似文献   

15.
The general solution process of the Hitchcock transportation problem resulting from the application of the method of reduced matrices may give solutions with some negative xij values. This paper is devoted to a review of the reduced matrices method, an examination of suitable interpretation of sets of xij which include some negative values, and ways of interpreting these values in useful modifications of the Hitchcock problem. Such modifications include a) the reshipment problem, b) the overshipment problem, and c) the transshipment problem. Techniques are developed for determining and eliminating cij which are not optimal. These techniques and results are useful in solving the problems indicated above. The natural applicability of the simple and general method of reduced matrices is emphasized.  相似文献   

16.
Suppose we are given a network G=(V,E) with arc distances and a linear cost function for lengthening arcs. In this note, we consider a network-interdiction problem in which the shortest path from source node s to sink node t is to be increased to at least τ units via a least-cost investment strategy. This problem is shown to reduce to a simple minimum-cost-flow problem. Applications and generalizations are discussed, including the multiple-destination case.  相似文献   

17.
We investigate the solvability of two single‐machine scheduling problems when the objective is to identify among all job subsets with cardinality k,1≤kn, the one that has the minimum objective function value. For the single‐machine minimum maximum lateness problem, we conclude that the problem is solvable in O(n2) time using the proposed REMOVE algorithm. This algorithm can also be used as an alternative to Moore's algorithm to solve the minimum number of tardy jobs problem by actually solving the hierarchical problem in which the objective is to minimize the maximum lateness subject to the minimum number of tardy jobs. We then show that the REMOVE algorithm cannot be used to solve the general case of the single‐machine total‐weighted completion time problem; we derive sufficient conditions among the job parameters so that the total weighted completion time problem becomes solvable in O(n2) time. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 60: 449–453, 2013  相似文献   

18.
We consider a pricing problem in directed, uncapacitated networks. Tariffs must be defined by an operator, the leader, for a subset of m arcs, the tariff arcs. Costs of all other arcs in the network are assumed to be given. There are n clients, the followers, and after the tariffs have been determined, the clients route their demands independent of each other on paths with minimal total cost. The problem is to find tariffs that maximize the operator's revenue. Motivated by applications in telecommunication networks, we consider a restricted version of this problem, assuming that each client utilizes at most one of the operator's tariff arcs. The problem is equivalent to pricing bridges that clients can use in order to cross a river. We prove that this problem is APX‐hard. Moreover, we analyze the effect of uniform pricing, proving that it yields both an m approximation and a (1 + lnD)‐approximation. Here, D is upper bounded by the total demand of all clients. In addition, we consider the problem under the additional restriction that the operator must not reject any of the clients. We prove that this problem does not admit approximation algorithms with any reasonable performance guarantee, unless P = NP, and we prove the existence of an n‐approximation algorithm. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

19.
One way of achieving the increased levels of system reliability and availability demanded by critical computer-based control systems is through the use of fault-tolerant distributed computer systems. This article addresses the problem of allocating a set of m tasks among a set of n processors in a manner that will satisfy various task assignment, system capacity, and task scheduling constraints while balancing the workload across processors. We discuss problem background, problem formulation, and a known heuristic procedure for the problem. A new solution-improving heuristic procedure is introduced, and computational experience with the heuristics is presented. With only a modest increase in the amount of computational effort, the new procedure is demonstrated to improve dramatically solution quality as well as obtain near-optimal solutions to the test problems.  相似文献   

20.
This paper considers a problem of locating new facilities in the plane with respect to existing facilities, the locations of which are known. The problem consists of finding locations of new facilities which will minimize a total cost function which consists of a sum of costs directly proportional to the Euclidian distances among the new facilities, and costs directly proportional to the Euclidian distances between new and existing facilities. It is established that the total cost function has a minimum; necessary conditions for a mimumum are obtained; necessary and sufficient conditions are obtained for the function to be strictly convex (it is always convex); when the problem is “well structured,” it is established that for a minimum cost solution the locations of the new facilities will lie in the convex hull of the locations of the existing facilities. Also, a dual to the problem is obtained and interpreted; necessary and sufficient conditions for optimum solutions to the problem, and to its dual, are developed, as well as complementary slackness conditions. Many of the properties to be presented are motivated by, based on, and extend the results of Kuhn's study of the location problem known as the General Fermat Problem.  相似文献   