 共查询到20条相似文献,搜索用时 296 毫秒
1.
This paper considers the two different flow shop scheduling problems that arise when, in a two machine problem, one machine is characterized by sequence dependent setup times. The objective is to determine a schedule that minimizes makespan. After establishing the optimally of permutation schedules for both of these problems, an efficient dynamic programming formulation is developed for each of them. Each of these formulations is shown to be comparable, from a computational standpoint, to the corresponding formulation of the traveling salesman problem. Then, the relative merits of the dynamic programming and branch and bound approaches to these two scheduling problems are discussed.  相似文献   

2.
We derive sufficient conditions which, when satisfied, guarantee that an optimal solution for a single‐machine scheduling problem is also optimal for the corresponding proportionate flow shop scheduling problem. We then utilize these sufficient conditions to show the solvability in polynomial time of numerous proportionate flow shop scheduling problems with fixed job processing times, position‐dependent job processing times, controllable job processing times, and also problems with job rejection. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 595–603, 2015  相似文献   

3.
It is well known that a minimal makespan permutation sequence exists for the n × 3 flow shop problem and for the n × m flow shop problem with no inprocess waiting when processing times for both types of problems are positive. It is shown in this paper that when the assumption of positive processing times is relaxed to include nonnegative processing times, optimality of permutation schedules cannot be guaranteed.  相似文献   

4.
This paper examines scheduling problems in which the setup phase of each operation needs to be attended by a single server, common for all jobs and different from the processing machines. The objective in each situation is to minimize the makespan. For the processing system consisting of two parallel dedicated machines we prove that the problem of finding an optimal schedule is N P‐hard in the strong sense even if all setup times are equal or if all processing times are equal. For the case of m parallel dedicated machines, a simple greedy algorithm is shown to create a schedule with the makespan that is at most twice the optimum value. For the two machine case, an improved heuristic guarantees a tight worst‐case ratio of 3/2. We also describe several polynomially solvable cases of the later problem. The two‐machine flow shop and the open shop problems with a single server are also shown to be N P‐hard in the strong sense. However, we reduce the two‐machine flow shop no‐wait problem with a single server to the Gilmore—Gomory traveling salesman problem and solve it in polynomial time. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 304–328, 2000  相似文献   

5.
We schedule a set of illuminators (homing devices) to strike a set of targets using surface-to-air missiles in a naval battle. The task is viewed as a production floor shop scheduling problem of minimizing the total weighted flow time, subject to time-window job availability and machine downtime side constraints. A simple algorithm based on solving assignment problems is developed for the case when all the job processing times are equal and the data are all integer. For the general case of scheduling jobs with unequal processing times, we develop two alternate formulations and analyze their relative strengths by comparing their respective linear programming relaxations. We select the better formulation in this comparison and exploit its special structures to develop several effective heuristic algorithms that provide good-quality solutions in real time; this is an essential element for use by the Navy. © 1995 John Wiley & Sons, Inc.  相似文献   

6.
We discuss the problem of scheduling several jobs on a single machine with the objective of minimizing the weighted mean absolute deviation of flow times around the weighted mean flow time. We first show that the optimal schedule is W-shaped. For the unweighted case, we show that all optimal schedules are V-shaped. This characterization enables us to show that the problem is NP-hard. We then provide a pseudopolynomial algorithm for the unweighted problem. Finally, we consider three heuristic algorithms for the unweighted problem and report computational experience with these algorithms. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 297–311, 1998  相似文献   

7.
This paper treats the problem of sequencing n jobs on two machines in a “flow shop.” (That is, each job in the shop is required to flow through the same sequence of the machines.) The processing time of a given job on a given machine is assumed to be distributed exponentially, with a known mean. The objective is to minimize the expected job completion time. This paper proves an optimal ordering rule, previously conjectured by Talwar [10]. A formula is also derived through Markov Chain analysis, which evaluates the expected job completion time for any given sequence of the jobs. In addition, the performance of a heuristic rule is discussed in the light of the optimal solution.  相似文献   

8.
The flow-shop scheduling problem with sequence-dependent additive setup times is considered as a special case of the general problem, and a polynomially bounded approximate method is developed to find a minimum makespan permutation schedule. The approximate algorithm is shown to yield optimal results for the two-machine case. A version of Sule's model is defined that produces the first approximation of the optimal solution for this problem. Computational experience along with numerical examples are provided to test the effectiveness of the method.  相似文献   

9.
讨论作业具有线性加工时间,作业间具有链约束的两台处理机流水作业排序问题,目标函数为极小化完工时间。在作业加工时间简单线性恶化下,提出作业的非负开始和停止延迟恶化率,构造了满足约束条件的复合作业。在此基础上,给出作业间具有平行链约束的两台处理机流水作业排序问题的最优多项式算法。  相似文献   

10.
This paper presents a deterministic approach to schedule patients in an ambulatory surgical center (ASC) such that the number of postanesthesia care unit nurses at the center is minimized. We formulate the patient scheduling problem as new variants of the no‐wait, two‐stage process shop scheduling problem and present computational complexity results for the new scheduling models. Also, we develop a tabu search‐based heuristic algorithm to solve the patient scheduling problem. Our algorithm is shown to be very effective in finding near optimal schedules on a set of real data from a university hospital's ASC. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2003  相似文献   

11.
In many practical situations of production scheduling, it is either necessary or recommended to group a large number of jobs into a relatively small number of batches. A decision needs to be made regarding both the batching (i.e., determining the number and the size of the batches) and the sequencing (of batches and of jobs within batches). A setup cost is incurred whenever a batch begins processing on a given machine. This paper focuses on batch scheduling of identical processing‐time jobs, and machine‐ and sequence‐independent setup times on an m‐machine flow‐shop. The objective is to find an allocation to batches and their schedule in order to minimize flow‐time. We introduce a surprising and nonintuitive solution for the problem. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   

12.
The paper considers the open shop scheduling problem to minimize the make-span, provided that one of the machines has to process the jobs according to a given sequence. We show that in the preemptive case the problem is polynomially solvable for an arbitrary number of machines. If preemption is not allowed, the problem is NP-hard in the strong sense if the number of machines is variable, and is NP-hard in the ordinary sense in the case of two machines. For the latter case we give a heuristic algorithm that runs in linear time and produces a schedule with the makespan that is at most 5/4 times the optimal value. We also show that the two-machine problem in the nonpreemptive case is solvable in pseudopolynomial time by a dynamic programming algorithm, and that the algorithm can be converted into a fully polynomial approximation scheme. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 705–731, 1998  相似文献   

13.
We consider open‐shop scheduling problems where operation‐processing times are a convex decreasing function of a common limited nonrenewable resource. The scheduler's objective is to determine the optimal job sequence on each machine and the optimal resource allocation for each operation in order to minimize the makespan. We prove that this problem is NP‐hard, but for the special case of the two‐machine problem we provide an efficient optimization algorithm. We also provide a fully polynomial approximation scheme for solving the preemptive case. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

14.
Previous research on the scheduling of multimachine systems has generally focused on the optimization of individual performance measures. This article considers the sequencing of jobs through a multimachine flow shop, where the quality of the resulting schedule is evaluated according to the associated levels of two scheduling criteria, schedule makespan (Cmax) and maximum job tardiness (Tmax). We present constructive procedures that quantify the trade-off between Cmax and Tmax. The significance of this trade-off is that the optimal solution for any preference function involving only Cmax and Tmax must be contained among the set of efficient schedules that comprise the trade-off curve. For the special case of two-machine flow shops, we present an algorithm that identifies the exact set of efficient schedules. Heruistic procedures for approximating the efficient set are also provided for problems involving many jobs or larger flow shops. Computational results are reported for the procedures which indicate that both the number of efficient schedules and the error incurred by heuristically approximating the efficient set are quite small.  相似文献   

15.
We consider a single machine scheduling problem in which the objective is to minimize the mean absolute deviation of job completion times about a common due date. We present an algorithm for determining multiple optimal schedules under restrictive assumptions about the due date, and an implicit enumeration procedure when the assumptions do not hold. We also establish the similarity of this problem to the two parallel machines mean flow time problem.  相似文献   

16.
This article studies a special case of stochastic three-machine, permutation flowshop scheduling. It is proved that a sequence where processing times on the first and third machines are in a monotone nondecreasing and nonincreasing order of the likelihood ratio, respectively, and on the second machine are equally distributed, minimizes distribution of schedule length.  相似文献   

17.
This article considers the problem of scheduling parallel processors to minimize the makespan. The article makes two key contributions: (1) It develops a new lower bound on the makespan for an optimal schedule, and (2) it proposes an efficient two-step algorithm to find schedules of any desired accuracy, or percent above optimal. In addition, a posterior bound on LPT (longest processing time) sequencing is developed in the article. It is proved that this bound dominates the previously reported bounds on LPT sequencing.  相似文献   

18.
考虑随机回放的卫星数传调度问题的一种求解方法   总被引:2,自引:0,他引:2       下载免费PDF全文
针对考虑随机回放的卫星数传调度问题,从置换空间到调度解空间的映射方法和置换空间的搜索算法两方面进行了研究.提出了一种时间窗优先的置换序列映射算法,并证明该映射算法可以将置换序列映射到调度解空间上的最优解.提出了一种遗传随机搜索算法,基于有记忆功能的随机邻域搜索,在置换空间上搜索产生优化调度的置换序列.仿真计算表明,遗传随机搜索算法可以增强遗传算法的局部搜索能力,在搜索结果上平均获得了2.72%的改进.  相似文献   

19.
The ability to cope with uncertainty in dynamic scheduling environments is becoming an increasingly important issue. In such environments, any disruption in the production schedule will translate into a disturbance of the plans for several external activities as well. Hence, from a practical point of view, deviations between the planned and realized schedules are to be avoided as much as possible. The term stability refers to this concern. We propose a proactive approach to generate efficient and stable schedules for a job shop subject to processing time variability and random machine breakdowns. In our approach, efficiency is measured by the makespan, and the stability measure is the sum of the variances of the realized completion times. Because the calculation of the original measure is mathematically intractable, we develop a surrogate stability measure. The version of the problem with the surrogate stability measure is proven to be NP‐hard, even without machine breakdowns; a branch‐and‐bound algorithm is developed for this problem variant. A tabu search algorithm is proposed to handle larger instances of the problem with machine breakdowns. The results of extensive computational experiments indicate that the proposed algorithms are quite promising in performance. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

20.
This article considers the efficient scheduling of a fleet of ships engaged in pickup and delivery of bulk cargoes. Our optimization system begins by generating a menu of candidate schedules for each ship. This menu can contain all feasible solutions, which guarantees we will find an optimal solution or can be heuristically limited to contain only those schedules likely to be in an optimal solution. The problem of choosing from this menu an optimal schedule for the fleet is formulated as a set-packing problem and solved with a dual algorithm. Computational experience is presented based on real data obtained from the Military Sealift Command of the U. S. Navy. Run times for this data were reasonable and solutions were generated with the potential of saving up to about $30 million per year over the manual system currently in place. We also describe a color-graphics interface developed to facilitate interaction with the optimization system.  相似文献   