首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 500 毫秒
1.
This article deals with an inventory problem where the supply is available only during an interval of (random) length X. The unavailability of supply lasts for a random duration Y. Using concepts from renewal theory, we construct an objective function (average cost/time) in terms of the order-quantity decision variable Q. We develop the individual cost components as order, holding, and shortage costs after introducing two important random variables. Due to the complexity of the objective function when X and Y are general random variables, we discuss two special cases and provide numerical examples with sensitivity analysis on the cost and noncost parameters. The article concludes with a discussion of the comparison of the current model with random yield and random lead-time models. Suggestions for further research are also provided.  相似文献   

2.
This article examines a problem faced by a firm procuring a material input or good from a set of suppliers. The cost to procure the material from any given supplier is concave in the amount ordered from the supplier, up to a supplier‐specific capacity limit. This NP‐hard problem is further complicated by the observation that capacities are often uncertain in practice, due for instance to production shortages at the suppliers, or competition from other firms. We accommodate this uncertainty in a worst‐case (robust) fashion by modeling an adversarial entity (which we call the “follower”) with a limited procurement budget. The follower reduces supplier capacity to maximize the minimum cost required for our firm to procure its required goods. To guard against uncertainty, the firm can “protect” any supplier at a cost (e.g., by signing a contract with the supplier that guarantees supply availability, or investing in machine upgrades that guarantee the supplier's ability to produce goods at a desired level), ensuring that the anticipated capacity of that supplier will indeed be available. The problem we consider is thus a three‐stage game in which the firm first chooses which suppliers' capacities to protect, the follower acts next to reduce capacity from unprotected suppliers, and the firm then satisfies its demand using the remaining capacity. We formulate a three‐stage mixed‐integer program that is well‐suited to decomposition techniques and develop an effective cutting‐plane algorithm for its solution. The corresponding algorithmic approach solves a sequence of scaled and relaxed problem instances, which enables solving problems having much larger data values when compared to standard techniques. © 2013 Wiley Periodicals, Inc. Naval Research Logistics, 2013  相似文献   

3.
Purchased materials often account for more than 50% of a manufacturer's product nonconformance cost. A common strategy for reducing such costs is to allocate periodic quality improvement targets to suppliers of such materials. Improvement target allocations are often accomplished via ad hoc methods such as prescribing a fixed, across‐the‐board percentage improvement for all suppliers, which, however, may not be the most effective or efficient approach for allocating improvement targets. We propose a formal modeling and optimization approach for assessing quality improvement targets for suppliers, based on process variance reduction. In our models, a manufacturer has multiple product performance measures that are linear functions of a common set of design variables (factors), each of which is an output from an independent supplier's process. We assume that a manufacturer's quality improvement is a result of reductions in supplier process variances, obtained through learning and experience, which require appropriate investments by both the manufacturer and suppliers. Three learning investment (cost) models for achieving a given learning rate are used to determine the allocations that minimize expected costs for both the supplier and manufacturer and to assess the sensitivity of investment in learning on the allocation of quality improvement targets. Solutions for determining optimal learning rates, and concomitant quality improvement targets are derived for each learning investment function. We also account for the risk that a supplier may not achieve a targeted learning rate for quality improvements. An extensive computational study is conducted to investigate the differences between optimal variance allocations and a fixed percentage allocation. These differences are examined with respect to (i) variance improvement targets and (ii) total expected cost. For certain types of learning investment models, the results suggest that orders of magnitude differences in variance allocations and expected total costs occur between optimal allocations and those arrived at via the commonly used rule of fixed percentage allocations. However, for learning investments characterized by a quadratic function, there is surprisingly close agreement with an “across‐the‐board” allocation of 20% quality improvement targets. © John Wiley & Sons, Inc. Naval Research Logistics 48: 684–709, 2001  相似文献   

4.
This article considers the Economic Lot Scheduling Problem where setup times and costs can be reduced by an initial investment that is amortized over time. The objective is to determine a multiple-item single facility cyclic schedule to minimize the long run average holding and setup costs plus the amortized investment. We develop a lower bound on the long run average inventory carrying and setup costs as a function of the setup times, and show that this lower bound is increasing concave on the setup times when the out-of-pocket setup costs are zero or proportional to the setup times. We then develop a model that may be helpful in deciding the magnitude and the distribution of a one-time investment in reducing the setup times when the investment is amortized over time. Numerical results based on randomly generated problems, and on Bomberger's ten item problem indicate that significant overall savings are possible for highly utilized facilities. Most of the savings are due to a significant reduction in the long run average holding cost. © 1995 John Wiley & Sons, Inc.  相似文献   

5.
One of the important features of any software system is its operational profile. This is simply the set of all operations that a software is designed to perform and the occurence probabilities of these operations. We present a new model on optimal software testing such that testing is done sequentially using a set of test cases. There may be failures due to the operations in each of these cases. The model parameters, consisting of testing costs and failure rates, all depend on the cases used and the operations performed. Our aim is to find the optimal testing durations in all of the cases in order to minimize the total expected cost. This problem leads to interesting decision models involving nonlinear programming formulations that possess explicit analytical solutions under reasonable assumptions. © 2000 John Wiley & Sons, Inc., Naval Research Logistics 47: 620–634, 2000  相似文献   

6.
A machine or production system is subject to random failure. Upon failure the system is replaced by a new one, and the process repeats. A cost is associated with each replacement, and an additional cost is incurred at each failure in service. Thus, there is an incentive for a controller to attempt to replace before failure occurs. The problem is to find an optimal control strategy that balances the cost of replacement with the cost of failure and results in a minimum total long-run average cost per unit time. We attack this problem under the cumulative damage model for system failure. In this failure model, shocks occur to the system in accordance with a Poisson process. Each shock causes a random amount of damage or wear and these damages accumulate additively. At any given shock, the system fails with a known probability that depends on the total damage accumulated to date. We assume that the cumulative damage is observable by the controller and that his decisions may be based on its current value. Supposing that the shock failure probability is an increasing function of the cumulative damage, we show that an optimal policy is to replace either upon failure or when this damage first exceeds a critical control level, and we give an equation which implicitly defines the optimal control level in terms of the cost and other system parameters. Also treated are some more general models that allow for income lost during repair time and other extensions.  相似文献   

7.
Unpredictable disruptive events significantly increase the difficulty of the management of automobile supply chains. In this paper, we propose an automobile production planning problem with component chips substitution in a finite planning horizon. The shortage of one chip can be compensated by another chip of the same type with a higher-end feature at an additional cost. Therefore, the automobile manufacturer can divert the on-hand inventory of chips to product lines that are more profitable in the event of shortages caused by supply chain disruptions. To cope with this, we propose a max-min robust optimization model that captures the uncertain supplies of chips. We show that the robust model has a mixed-integer programming equivalence that can be solved by a commercial IP solver directly. We compare the max-min robust model with the corresponding deterministic and two-stage stochastic models for the same problem through extensive numerical experiments. The computational results show that the max-min robust model outperforms the other two models in terms of the average and worst-case profits.  相似文献   

8.
We investigate the problem of determining lot sizes for multiple items when the expected percentage of acceptable output increases with the duration of the production run, usually due to adjustments made during the early part of the production run. Such problems arise in metal stamping, textile finishing processes, and a variety of other industries. The goal is to minimize the total cost of production, inventory holding costs, and setup costs (where applicable). We develop a heuristic procedure based on a Lagrangian relaxation that differs from relaxations used in earlier studies. We use various properties of the objective function to guide the adjustment of the initial solution from the relaxation toward feasibility. Computational results indicate that, on the average, the heuristic produces solutions within 4.9% of the lower bound obtained from the Lagrangian relaxation. © 1996 John Wiley & Sons, Inc.  相似文献   

9.
We present a group testing model for items characterized by marker random variables. An item is defined to be good (defective) if its marker is below (above) a given threshold. The items can be tested in groups; the goal is to obtain a prespecified number of good items by testing them in optimally sized groups. Besides this group size, the controller has to select a threshold value for the group marker sums, and the target number of groups which by the tests are classified to consist only of good items. These decision variables have to be chosen so as to minimize a cost function, which is a linear combination of the expected number of group tests and an expected penalty for missing the desired number of good items, subject to constraints on the probabilities of misclassifications. We treat two models of this kind: the first one is based on an infinite population size, whereas the second one deals with the case of a finite number of available items. All performance measures are derived in closed form; approximations are also given. Furthermore, we prove monotonicity properties of the components of the objective function and of the constraints. In several examples, we study (i) the dependence of the cost function on the decision variables and (ii) the dependence of the optimal values of the decision variables (group size, group marker threshold, and stopping rule for groups classified as clean) and of the target functionals (optimal expected number of tests, optimal expected penalty, and minimal expected cost) on the system parameters.© 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

10.
Although there has been considerable research directed toward developing Bayesian acceptance sampling plans, little consideration has been given to incorporating a decision-maker's risk attitude or treating such problems in terms of multiple-type defects and multiple criteria. We review our own work which is focused on the above issues. A model incorporating risk preference is shown to yield substantial differences in the characteristics of an optimal sampling plan relative to a typical Bayesian linear cost (risk neutral) model. Bayesian models and optimization schemes for a variety of multiple-type defect plans are reviewed. A bicriterion acceptance model, employing average outgoing quality and average inspection cost is also formulated. Traditional versus interactive optimization procedures are compared empirically in terms of ease of use, satisfaction with solutions, and insight gained into the problem.  相似文献   

11.
We consider the infinite horizon serial inventory system with both average cost and discounted cost criteria. The optimal echelon base‐stock levels are obtained in terms of only probability distributions of leadtime demands. This analysis yields a novel approach for developing bounds and heuristics for optimal inventory control polices. In addition to deriving the known bounds in literature, we develop several new upper bounds for both average cost and discounted cost models. Numerical studies show that the bounds and heuristic are very close to optimal.© 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

12.
The use of a single vendor for each inventoried item is usually assumed in most of the inventory models. However, there are situations where the use of more than one vendor should be considered, especially when lead times are stochastic. This research presents a theoretical investigation of the effect of cost structures on the relative performance of sole-sourcing versus dual-sourcing inventory control policies. We show that except for cases where the ordering cost is high, the lead-time variability is low, or the customer service level is low, dual sourcing performs better than sole sourcing under the normally distributed demand and shifted-exponential lead times. Moreover, the computational results indicate the dual sourcing provides a better service level than sole sourcing at the optimal solutions, and that dual sourcing results in larger order quantities than sole sourcing, which suggests that attractive quantity discounts may not be in jeopardy when dual sourcing is employed. Finally, because it is generally known that multiple sourcing can enhance the competition among suppliers, material managers should consider splitting purchase orders when two equally qualified suppliers are available. © 1994 John Wiley & Sons, Inc.  相似文献   

13.
Mixed censoring is useful extension of Type I and Type II censoring and combines some advantages of both types of censoring. This paper proposes a general Bayesian framework for designing a variable acceptance sampling scheme with mixed censoring. A general loss function which includes the sampling cost, the time‐consuming cost, the salvage value, and the decision loss is employed to determine the Bayes risk and the corresponding optimal sampling plan. An explicit expression of the Bayes risk is derived. The new model can easily be adapted to create life testing models for different distributions. Specifically, two commonly used distributions including the exponential distribution and the Weibull distribution are considered with a special decision loss function. We demonstrate that the proposed model is superior to models with Type I or Type II censoring. Numerical examples are reported to illustrate the effectiveness of the method proposed. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   

14.
Inventory systems with returns are systems in which there are units returned in a repairable state, as well as demands for units in a serviceable state, where the return and demand processes are independent. We begin by examining the control of a single item at a single location in which the stationary return rate is less than the stationary demand rate. This necessitates an occasional procurement of units from an outside source. We present a cost model of this system, which we assume is managed under a continuous review procurement policy, and develop a solution method for finding the policy parameter values. The key to the analysis is the use of a normally distributed random variable to approximate the steady-state distribution of net inventory. Next, we study a single item, two echelon system in which a warehouse (the upper echelon) supports N(N ? 1) retailers (the lower echelon). In this case, customers return units in a repairable state as well as demand units in a serviceable state at the retailer level only. We assume the constant system return rate is less than the constant system demand rate so that a procurement is required at certain times from an outside supplier. We develop a cost model of this two echelon system assuming that each location follows a continuous review procurement policy. We also present an algorithm for finding the policy parameter values at each location that is based on the method used to solve the single location problem.  相似文献   

15.
The warehouse problem with deterministic production cost, selling prices, and demand was introduced in the 1950s and there is a renewed interest recently due to its applications in energy storage and arbitrage. In this paper, we consider two extensions of the warehouse problem and develop efficient computational algorithms for finding their optimal solutions. First, we consider a model where the firm can invest in capacity expansion projects for the warehouse while simultaneously making production and sales decisions in each period. We show that this problem can be solved with a computational complexity that is linear in the product of the length of the planning horizon and the number of capacity expansion projects. We then consider a problem in which the firm can invest to improve production cost efficiency while simultaneously making production and sales decisions in each period. The resulting optimization problem is non‐convex with integer decision variables. We show that, under some mild conditions on the cost data, the problem can be solved in linear computational time. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 367–373, 2016  相似文献   

16.
Currently, sophisticated multiechelon models compute stockage quantities for spares and repair parts that will minimize total inventory investment while achieving a target level of weapon system operational availability. The maintenance policies to be followed are input to the stockage models. The Optimum Allocation of Test Equipment/Manpower Evaluated Against Logistics (OATMEAL) model will determine optimum maintenance as well as stockage policies for a weapon system. Specifically, it will determine at which echelon each maintenance function should be performed, including an option for component or module throwaway. Test equipment requirements to handle work load at each echelon are simultaneously optimized. Mixed-integer programming (MIP) combined with a Lagrangian approach are used to do the constrained cost minimization, that is, to minimize all costs dependent on maintenance and stockage policies while achieving a target weapons system operational availability. Real-life test cases are included.  相似文献   

17.
In this paper we study the impact of cancellations of customer orders on an inventory system. We develop a periodic review (s, S) inventory model with Poisson demands, deterministic demand leadtimes and supply leadtimes. When no set up cost is present for replenishment, the behavior of the system cost can be studied analytically. For the case with a fixed set up cost, we derive the operating characteristics of the model via an embedded Markov chain analysis. Based on this, we formulate the total cost function and suggest a two‐phase approach to optimization. Our model can be used to compute cancellation fees and to evaluate the impacts of various conditions of cancellation. We find that cancellations, as major sources of inventory information distortion, increase total system costs, and the magnitude of the cost impact depends on the probability of cancellation and the expected cancellation time. Other relevant lessons and insights are also discussed. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 213–231, 1999  相似文献   

18.
This article examines a version of the machine repair problem where failures may be irreparable. Since the number of machines in the system keeps decreasing, we impose a fixed state-dependent ordering policy of the type often encountered in inventory models. Although the system is Markovian, the number of states becomes very large. The emphasis of the article, therefore, is on deriving computationally tractable formulas for the steady-state probabilities, the long-run average cost per unit time, and the vector of expected discounted costs. When the state space is so large that exact computations may be infeasible, we propose approximations which are relatively quick and simple to compute and which yield very accurate results for the test problems examined.  相似文献   

19.
We consider a version of the famous bin-packing problem where the cost of a bin is a concave function of the number of items in the bin. We analyze the problem from an average-case point of view and develop techniques to determine the asymptotic optimal solution value for a variety of functions. We also describe heuristic techniques that are asymptotically optimal. © 1997 John Wiley & Sons, Inc. Naval Research Logistics 44: 673–686, 1997  相似文献   

20.
维修保障费用是影响装甲装备使用可用度的重要因素之一。要在有限的保障经费下实现高可用度要求,就必须建立装甲装备的使用可用度与维修保障费用的优化模型。根据装甲装备实际维修特点,在分析装甲装备预防性维修过程中故障类型多样的基础上,构建了装甲装备在给定维修周期内的使用可用度模型和维修保障费用模型,进而建立了使用可用度与维修保障费用的优化模型,提出了模型的解法和模型的改进建议。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号