首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 203 毫秒
1.
We consider a one-machine scheduling problem with earliness and tardiness penalties. All jobs are assigned a common due date and the objective is to minimize the total penalty due to job earliness and tardiness. We are interested in finding the optimal combination of the common due-date value and the job sequence. Despite the fact that this problem in general is very hard to solve, we prove that there exists at least a common property for all optimal solutions: The first job in an optimal sequence is one of the longest jobs. We also prove that this property holds for a general class of unimodal penalty functions.  相似文献   

2.
Location models commonly represent demand as discrete points rather than as continuously spread over an area. This modeling technique introduces inaccuracies to the objective function and consequently to the optimal location solution. In this article this inaccuracy is investigated by the study of a particular competitive facility location problem. First, the location problem is formulated over a continuous demand area. The optimal location for a new facility that optimizes the objective function is obtained. This optimal location solution is then compared with the optimal location obtained for a discrete set of demand points. Second, a simple approximation approach to the continuous demand formulation is proposed. The location problem can be solved by using the discrete demand algorithm while significantly reducing the inaccuracies. This way the simplicity of the discrete approach is combined with the approximated accuracy of the continuous-demand location solution. Extensive analysis and computations of the test problem are reported. It is recommended that this approximation approach be considered for implementation in other location models. © 1997 John Wiley & Sons, Inc.  相似文献   

3.
We discuss the problem of scheduling several jobs on a single machine with the objective of minimizing the weighted mean absolute deviation of flow times around the weighted mean flow time. We first show that the optimal schedule is W-shaped. For the unweighted case, we show that all optimal schedules are V-shaped. This characterization enables us to show that the problem is NP-hard. We then provide a pseudopolynomial algorithm for the unweighted problem. Finally, we consider three heuristic algorithms for the unweighted problem and report computational experience with these algorithms. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 297–311, 1998  相似文献   

4.
We consider open‐shop scheduling problems where operation‐processing times are a convex decreasing function of a common limited nonrenewable resource. The scheduler's objective is to determine the optimal job sequence on each machine and the optimal resource allocation for each operation in order to minimize the makespan. We prove that this problem is NP‐hard, but for the special case of the two‐machine problem we provide an efficient optimization algorithm. We also provide a fully polynomial approximation scheme for solving the preemptive case. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

5.
Recent efforts to improve lower bounds in implicit enumeration algorithms for the general (n/m/G/Fmax) sequencing problem have been directed to the solution of an auxiliary single machine problem that results from the relaxation of some of the interference constraints. We develop an algorithm that obtains optimal and near optimal solutions for this relaxed problem with relatively little computational effort. We report on computational results achieved when this method is used to obtain lower bounds for the general problem. Finally, we show the equivalence of this problem to a single machine sequencing problem with earliest start and due date constraints where the objective is to minimize the maximum lateness.  相似文献   

6.
This article considers the single-machine dynamic scheduling problem where the jobs have different arrival times and the objective is to minimize the sum of completion times. This problem is known to be strongly NP-hard. We develop decomposition results for this problem such that a large problem can be solved by combining optimal solutions for several smaller problems. The decomposition results can be used with any implicit enumeration method to develop an optimal algorithm. Our computational experiment indicates that the computational efficiency of the currently best available branch-and-bound algorithm can be improved with the use of our decomposition results. © 1996 John Wiley & Sons, Inc.  相似文献   

7.
We consider a single machine scheduling problem in which the objective is to minimize the mean absolute deviation of job completion times about a common due date. We present an algorithm for determining multiple optimal schedules under restrictive assumptions about the due date, and an implicit enumeration procedure when the assumptions do not hold. We also establish the similarity of this problem to the two parallel machines mean flow time problem.  相似文献   

8.
We consider the nonpermutation flow shop problem with release dates, with the objective of minimizing the sum of the weighted completion times on the final machine. Since the problem is NP‐hard, we focus on the analysis of the performance of several approximation algorithms, all of which are related to the classical Weighted Shortest Processing Time Among Available Jobs heuristic. In particular, we perform a probabilistic analysis and prove that two online heuristics and one offline heuristic are asymptotically optimal. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

9.
In due‐window assignment problems, jobs completed within a designated time interval are regarded as being on time, whereas early and tardy jobs are penalized. The objective is to determine the location and size of the due‐window, as well as the job schedule. We address a common due‐window assignment problem on parallel identical machines with unit processing time jobs. We show that the number of candidate values for the optimal due‐window starting time and for the optimal due‐window completion time are bounded by 2. We also prove that the starting time of the first job on each of the machines is either 0 or 1, thus introducing a fairly simple, constant‐time solution for the problem. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   

10.
We consider a single-machine scheduling problem with the objective of minimizing the mean (or equivalently, total) tardiness and earliness when due dates may differ among jobs. Some properties of the optimal solution are discussed, and these properties are used to develop both optimal and heuristic algorithms. Results of computational tests indicate that optimal solutions can be found for problems with up to 20 jobs, and that two of the heuristic procedures provide optimal or very near optimal solutions in many instances. © 1994 John Wiley & Sons, Inc.  相似文献   

11.
We study a deterministic lot-size problem, in which the demand rate is a (piecewise) continuous function of time and shortages are backordered. The problem is to find the order points and order quantities to minimize the total costs over a finite planning horizon. We show that the optimal order points have an interleaving property, and when the orders are optimally placed, the objective function is convex in the number of orders. By exploiting these properties, an algorithm is developed which solves the problem efficiently. For problems with increasing (decreasing) demand rates and decreasing (increasing) cost rates, monotonicity properties of the optimal order quantities and order intervals are derived.  相似文献   

12.
We consider a routing problem where the objective is to maximize the sum of the rewards collected at the nodes visited. Node rewards are decreasing linear functions of time. Time is spent when traveling between pairs of nodes, and while visiting the nodes. We propose a penalty-based greedy (heuristic) algorithm and a branch-and-bound (optimal) algorithm for this problem. The heuristic is very effective in obtaining good solutions. We can solve problems with up to 20 nodes optimally on a microcomputer using the branch-and-bound algorithm. We report our computational experience with this problem. © 1996 John Wiley & Sons, Inc.  相似文献   

13.
We consider the problem of scheduling customer orders in a flow shop with the objective of minimizing the sum of tardiness, earliness (finished goods inventory holding), and intermediate (work‐in‐process) inventory holding costs. We formulate this problem as an integer program, and based on approximate solutions to two different, but closely related, Dantzig‐Wolfe reformulations, we develop heuristics to minimize the total cost. We exploit the duality between Dantzig‐Wolfe reformulation and Lagrangian relaxation to enhance our heuristics. This combined approach enables us to develop two different lower bounds on the optimal integer solution, together with intuitive approaches for obtaining near‐optimal feasible integer solutions. To the best of our knowledge, this is the first paper that applies column generation to a scheduling problem with different types of strongly ????‐hard pricing problems which are solved heuristically. The computational study demonstrates that our algorithms have a significant speed advantage over alternate methods, yield good lower bounds, and generate near‐optimal feasible integer solutions for problem instances with many machines and a realistically large number of jobs. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   

14.
We study a class of replacement models for systems subject to deterioration. The objective is to determine an optimal replacement policy that minimizes the average operating costs of the system. We use a parametric analysis to establish sufficient conditions for the optimality of control limit policies. This work generalizes several existing results for optimal replacement models in the literature. © 1992 John Wiley & Sons, Inc.  相似文献   

15.
We consider a problem of optimal division of stock between a logistic depot and several geographically dispersed bases, in a two‐echelon supply chain. The objective is to minimize the total cost of inventory shipment, taking into account direct shipments between the depot and the bases, and lateral transshipments between bases. We prove the convexity of the objective function and suggest a procedure for identifying the optimal solution. Small‐dimensional cases, as well as a limit case in which the number of bases tends to infinity, are solved analytically for arbitrary distributions of demand. For a general case, an approximation is suggested. We show that, in many practical cases, partial pooling is the best strategy, and large proportions of the inventory should be kept at the bases rather than at the depot. The analytical and numerical examples show that complete pooling is obtained only as a limit case in which the transshipment cost tends to infinity. © 2017 Wiley Periodicals, Inc. Naval Research Logistics, 64: 3–18, 2017  相似文献   

16.
We study a multi‐stage dynamic assignment interdiction (DAI) game in which two agents, a user and an attacker, compete in the underlying bipartite assignment graph. The user wishes to assign a set of tasks at the minimum cost, and the attacker seeks to interdict a subset of arcs to maximize the user's objective. The user assigns exactly one task per stage, and the assignment costs and interdiction impacts vary across stages. Before any stage commences in the game, the attacker can interdict arcs subject to a cardinality constraint. An interdicted arc can still be used by the user, but at an increased assignment cost. The goal is to find an optimal sequence of assignments, coupled with the attacker's optimal interdiction strategy. We prove that this problem is strongly NP‐hard, even when the attacker can interdict only one arc. We propose an exact exponential‐state dynamic‐programming algorithm for this problem as well as lower and upper bounds on the optimal objective function value. Our bounds are based on classical interdiction and robust optimization models, and on variations of the DAI game. We examine the efficiency of our algorithms and the quality of our bounds on a set of randomly generated instances. © 2017 Wiley Periodicals, Inc. Naval Research Logistics 64: 373–387, 2017  相似文献   

17.
We perform a sensitivity analysis of the Euclidean, single-facility minisum problem, which is also known as the Weber problem. We find the sensitivity of the optimal site of the new facility to changes in the locations and weights of the demand points. We apply these results to get the optimal site if some of the parameters in the problem are changed. We also get approximate formulas for the set of all possible optimal sites if demand points are restricted to given areas, and weights must be within given ranges, which is a location problem under conditions of uncertainty.  相似文献   

18.
The problem of developing good schedules for Navy C-Schools has been modeled as a combinatorial optimization problem. The only complicating feature of the problem is that classes must be grouped together into sequences known as pipelines. An ideal schedule will have all classes in a pipeline scheduled in consecutive weeks. The objective is to eliminate the nonproductive time spent by sailors at C-Schools who are waiting for the next class in a pipeline. In this investigation an implicit enumeration procedure for this problem was developed. The key component of our algorithm is a specialized greedy algorithm which is used to obtain a good initial incumbent. Often this initial incumbent is either an optimal schedule or a near optimal schedule. In an empirical analysis with the only other competing software system, our greedy heuristic found equivalent or better solutions in substantially less computer time. This greedy heuristic was extended and modified for the A-School scheduling problem and was found to be superior to its only competitor. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 533–551, 1998  相似文献   

19.
We consider the problem of scheduling n independent and simultaneously available jobs without preemption on a single machine, where the machine has a fixed maintenance activity. The objective is to find the optimal job sequence to minimize the total amount of late work, where the late work of a job is the amount of processing of the job that is performed after its due date. We first discuss the approximability of the problem. We then develop two pseudo‐polynomial dynamic programming algorithms and a fully polynomial‐time approximation scheme for the problem. Finally, we conduct extensive numerical studies to evaluate the performance of the proposed algorithms. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 172–183, 2016  相似文献   

20.
We present a new deterministic linear program for the network revenue management problem with customer choice behavior. The novel aspect of our linear program is that it naturally generates bid prices that depend on how much time is left until the time of departure. Similar to the earlier linear program used by van Ryzin and Liu (2004), the optimal objective value of our linear program provides an upper bound on the optimal total expected revenue over the planning horizon. In addition, the percent gap between the optimal objective value of our linear program and the optimal total expected revenue diminishes in an asymptotic regime where the leg capacities and the number of time periods in the planning horizon increase linearly with the same rate. Computational experiments indicate that when compared with the linear program that appears in the existing literature, our linear program can provide tighter upper bounds, and the control policies that are based on our linear program can obtain higher total expected revenues. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号