首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 0 毫秒
1.
2.
3.
The greedy and balanced algorithms for the optimal assembly of arbitrary structure functions (not necessarily binary) are discussed. Conditions under which these algorithms yield optimal configurations are deduced. © 1992 John Wiley & Sons, Inc.  相似文献   

4.
Proposed is a Heuristic Network (HN) Procedure for balancing assembly lines. The procedure uses simple heuristic rules to generate a network which is then traversed using a shortest route algorithm to obtain a heuristic solution. The advantages of the HN Procedure are: a) it generally yields better solutions than those obtained by application of the heuristics, and b) sensitivity analysis with different values of cycle time is possible without having to regenerate the network. The rationale for its effectiveness and its application to problems with paralleling are presented. Computational experience with the procedure on up to 50 task test problems is provided.  相似文献   

5.
Suppose one object is hidden in the k-th of n boxes with probability p(k). The boxes are to be searched sequentially. Associated with the j-th search of box k is a cost c(j,k) and a conditional probability q(j,k) that the first j - 1 searches of box k are unsuccessful while the j-th search is successful given that the object is hidden in box k. The problem is to maximize the probability that we find the object if we are not allowed to offer more than L for the search. We prove the existence of an optimal allocation of the search effort L and state an algorithm for the construction of an optimal allocation. Finally, we discuss some problems concerning the complexity of our problem.  相似文献   

6.
We consider an exponential repair model with s machines and one repairman. The machines' failure rates are equal but the repair rate may change from machine to machine. The repairman repairs the failed machines one at a time and in the course of his work he may even interrupt repairing one machine and start another. We compare repair policies and prove an optimality result by means of stochastic order. The proof is based on representing the compared models simultaneously in a special way and comparing then the sample paths of the interesting stochastic processes.  相似文献   

7.
This paper characterizes the structure of optimal strategies for a replacement problem for two special cases of observation quality. It is shown that when the state of the system is either completely observed or completely unobserved at every decision epoch by the controller, reasonable assumptions are sufficient for the existence of optimal replacement strategies composed of policies having a generalized, control-limit form. These structural results are of particular interest since the optimal cost functions for the two special cases represent bounds on the optimal cost function for the general partially observed case, significant computational simplification can result for the two special cases due to their optimal strategy structure, and optimal strategies possessing a control-limit structure do not necessarily exist for the general partially observed case.  相似文献   

8.
针对具有固定物品总和、多最优解特征的组合优化问题,以固定总和实数子集问题和购买鸡翅问题为例,给出了这类多最优解组合优化问题的形式化表示。在分析枚举等经典算法基础上,提出了基于整数状态表示和实数状态表示的0-1决策递归搜索多最优解动态规划算法。针对该算法在最优解数量较大时,时间复杂度趋向O(mn)的问题,提出了基于相同决策路径合并和基于0-x决策的两种改进算法。实验中两种改进算法的计算时间基本符合与O(nb+nm)的正比关系,表明对于这类多最优解组合优化问题具有良好的求解性能。  相似文献   

9.
Scheduling a set of n jobs on a single machine so as to minimize the completion time variance is a well‐known NP‐hard problem. In this paper, we propose a sequence, which can be constructed in O(n log n) time, as a solution for the problem. Our primary concern is to establish the asymptotical optimality of the sequence within the framework of probabilistic analysis. Our main result is that, when the processing times are randomly and independently drawn from the same uniform distribution, the sequence is asymptotically optimal in the sense that its relative error converges to zero in probability as n increases. Other theoretical results are also derived, including: (i) When the processing times follow a symmetric structure, the problem has 2⌊(n−1)/2⌋ optimal sequences, which include our proposed sequence and other heuristic sequences suggested in the literature; and (ii) when these 2⌊(n−1)/2⌋ sequences are used as approximate solutions for a general problem, our proposed sequence yields the best approximation (in an average sense) while another sequence, which is commonly believed to be a good approximation in the literature, is interestingly the worst. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 373–398, 1999  相似文献   

10.
T identical exponential lifetime components out of which G are initially functioning (and B are not) are to be allocated to N subsystems, which are connected either in parallel or in series. Subsystem i, i = 1,…, N, functions when at least Ki of its components function and the whole system is maintained by a single repairman. Component repair times are identical independent exponentials and repaired components are as good as new. The problem of the determination of the assembly plan that will maximize the system reliability at any (arbitrary) time instant t is solved when the component failure rate is sufficiently small. For the parallel configuration, the optimal assembly plan allocates as many components as possible to the subsystem with the smallest Ki and allocates functioning components to subsystems in increasing order of the Ki's. For the series configuration, the optimal assembly plan allocates both the surplus and the functioning components equally to all subsystems whenever possible, and when not possible it favors subsystems in decreasing order of the Ki's. The solution is interpreted in the context of the optimal allocation of processors and an initial number of jobs in a problem of routing time consuming jobs to parallel multiprocessor queues. © John Wiley & Sons, Inc. Naval Research Logistics 48: 732–746, 2001  相似文献   

11.
We state a balancing problem for mixed model assembly lines with a paced moving conveyor as: Given the daily assembling sequence of the models, the tasks of each model, the precedence relations among the tasks, and the operations parameters of the assembly line, assign the tasks of the models to the workstations so as to minimize the total overload time. Several characteristics of the problem are investigated. A line‐balancing heuristic is proposed based on a lower bound of the total overload time. A practical procedure is provided for estimating the deviation of any given line‐balance solution from the theoretical optimum. Numerical examples are given to illustrate the methodology. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   

12.
We consider in this paper the coordinated replenishment dynamic lot‐sizing problem when quantity discounts are offered. In addition to the coordination required due to the presence of major and minor setup costs, a separate element of coordination made possible by the offer of quantity discounts needs to be considered as well. The mathematical programming formulation for the incremental discount version of the extended problem and a tighter reformulation of the problem based on variable redefinition are provided. These then serve as the basis for the development of a primal‐dual based approach that yields a strong lower bound for our problem. This lower bound is then used in a branch and bound scheme to find an optimal solution to the problem. Computational results for this optimal solution procedure are reported in the paper. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 686–695, 2000  相似文献   

13.
The dynamics of the environment in which supply chains evolve requires that companies frequently redesign their logistics distribution networks. In this paper we address a multiperiod single‐sourcing problem that can be used as a strategic tool for evaluating the costs of logistics network designs in a dynamic environment. The distribution networks that we consider consist of a set of production and storage facilities, and a set of customers who do not hold inventories. The facilities face production capacities, and each customer's demand needs to be delivered by a single facility in each period. We deal with the assignment of customers to facilities, as well as the location, timing, and size of inventories. In addition, to mitigate start and end‐of‐study effects, we view the planning period as a typical future one, which will repeat itself. This leads to a cyclic model, in which starting and ending inventories are equal. Based on an assignment formulation of the problem, we propose a greedy heuristic, and prove that this greedy heuristic is asymptotically feasible and optimal in a probabilistic sense. We illustrate the behavior of the greedy heuristic, as well as some improvements where the greedy heuristic is used as the starting point of a local interchange procedure, on a set of randomly generated test problems. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 412–437, 2003  相似文献   

14.
Independent samples are taken from C multivariate populations with continuous but unknown cumulative distribution function c.d.f.). The problem is to test the hypothesis that the C population c.d.f's are identical to a specified c.d.f. We approach this problem by first transforming the data so that the hypothesis being tested is that the common distribution is uniform over a unit hypercube. We then construct some Bayes tests and investigate their asymptotic properties. These tests are based on the asymptotic normality of the number of observations falling in the “asymptotically sufficient groupings”.  相似文献   

15.
In this paper, we consider the economic production quantity problem in the presence of imperfect processes. In the literature, the time to shift from the in-control state to the out-of-control state is assumed to be exponentially distributed. In this study, we consider general time to shift distributions and provide distribution-based and distribution-free bounds on the optimal cost. For the exponential case, we compare the optimal solutions to approximate solutions proposed in the literature. A numerical example is used to illustrate the analysis presented and to conduct a sensitivity analysis in order to see the effect of the input parameters on the various solutions to the problem. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 423–433, 1998  相似文献   

16.
Customers served by an M/M/1 queueing system each receive a reward R but pay a holding cost of C per unit time (including service time) spent in the system. The decision of whether or not a customer joins the queue can be made on an individual basis or a social basis. The effect of increasing the arrival rate on the optimal policy parameters is examined. Some limiting results are also derived.  相似文献   

17.
This paper develops an algorithm for a “shortest route” network problem in which it is desired to find the path which yields the shortest expected distance through the network. It is assumed that if a particular arc is chosen, then there is a finite probability that an adjacent arc will be traversed instead. Backward induction is used and appropriate recursion formulae are developed. A numerical example is provided.  相似文献   

18.
The subject of this note is the validity of the algorithm described by Aneja and Nair to solve the constrained shortest-path problem.  相似文献   

19.
计算机辅助装配公差分析的探讨   总被引:1,自引:0,他引:1  
探讨了将公差分析纳入到设计过程中,并对设计过程中公差取值进行指导的可行性,在用Pro/E在计算机上进行产品预装配的过程中利用公差分析中的最坏情况分析法、统计分析法、敏感分析法、百分比贡献分析法以及Pro/E软件中的CE/TOL(公差分析)模块对所设计的零件和零件装配的全过程进行公差分析与综合,确定零件的公差在装配过程中影响关键尺寸公差的约束及其敏感度,通过改变个别零件的关键尺寸的公差约束来降低制造成本,减少发生干涉和精度超标的概率,提高装配精度。  相似文献   

20.
The problem of minimizing mean flow time of two parallel processors is discussed. Prior results are briefly reviewed. A dynamic programming algorithm is presented which minimizes mean flow time for a set of n preordered jobs on two nonequivalent parallel processors. The algorithm is illustrated with an example problem. The computational experience is presented which illustrates the efficiency of the algorithm.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号