1.
We study the problem of minimizing the makespan in no‐wait two‐machine open shops producing multiple products using lot streaming. In no‐wait open shop scheduling, sublot sizes are necessarily consistent; i.e., they remain the same over all machines. This intractable problem requires finding sublot sizes, a product sequence for each machine, and a machine sequence for each product. We develop a dynamic programming algorithm to generate all the dominant schedule profiles for each product that are required to formulate the open shop problem as a generalized traveling salesman problem. This problem is equivalent to a classical traveling salesman problem with a pseudopolynomial number of cities. We develop and test a computationally efficient heuristic for the open shop problem. Our results indicate that solutions can quickly be found for two machine open shops with up to 50 products. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

2.
We consider two‐stage and three‐stage flexible flow shops with parallel machines in each stage and the minimum makespan objective. We develop linear time algorithms for these problems with absolute worst‐case bounds either sharper or no worse than the currently available ones and we accomplish this with lower complexity algorithms. We also demonstrate the asymptotic optimality of a class of algorithms for multistage flexible flow shop problems (which includes the proposed algorithms) under certain probabilistic assumptions on the job processing times. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 259–268, 2000  相似文献   

3.
We develop polynomial algorithms for several cases of the NP-hard open shop scheduling problem of minimizing the number of late jobs by utilizing some recent results for the open shop makespan problem. For the two machine common due date problem, we assume that either the machines or the jobs are ordered. For the m machine common due date problem, we assume that one machine is maximal and impose a restriction on its load. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 525–532, 1998  相似文献   

4.
This paper examines scheduling problems in which the setup phase of each operation needs to be attended by a single server, common for all jobs and different from the processing machines. The objective in each situation is to minimize the makespan. For the processing system consisting of two parallel dedicated machines we prove that the problem of finding an optimal schedule is N P‐hard in the strong sense even if all setup times are equal or if all processing times are equal. For the case of m parallel dedicated machines, a simple greedy algorithm is shown to create a schedule with the makespan that is at most twice the optimum value. For the two machine case, an improved heuristic guarantees a tight worst‐case ratio of 3/2. We also describe several polynomially solvable cases of the later problem. The two‐machine flow shop and the open shop problems with a single server are also shown to be N P‐hard in the strong sense. However, we reduce the two‐machine flow shop no‐wait problem with a single server to the Gilmore—Gomory traveling salesman problem and solve it in polynomial time. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 304–328, 2000  相似文献   

5.
The paper considers the open shop scheduling problem to minimize the make-span, provided that one of the machines has to process the jobs according to a given sequence. We show that in the preemptive case the problem is polynomially solvable for an arbitrary number of machines. If preemption is not allowed, the problem is NP-hard in the strong sense if the number of machines is variable, and is NP-hard in the ordinary sense in the case of two machines. For the latter case we give a heuristic algorithm that runs in linear time and produces a schedule with the makespan that is at most 5/4 times the optimal value. We also show that the two-machine problem in the nonpreemptive case is solvable in pseudopolynomial time by a dynamic programming algorithm, and that the algorithm can be converted into a fully polynomial approximation scheme. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 705–731, 1998  相似文献   

6.
We consider open‐shop scheduling problems where operation‐processing times are a convex decreasing function of a common limited nonrenewable resource. The scheduler's objective is to determine the optimal job sequence on each machine and the optimal resource allocation for each operation in order to minimize the makespan. We prove that this problem is NP‐hard, but for the special case of the two‐machine problem we provide an efficient optimization algorithm. We also provide a fully polynomial approximation scheme for solving the preemptive case. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

7.
Job shop scheduling with a bank of machines in parallel is important from both theoretical and practical points of view. Herein we focus on the scheduling problem of minimizing the makespan in a flexible two-center job shop. The first center consists of one machine and the second has k parallel machines. An easy-to-perform approximate algorithm for minimizing the makespan with one-unit-time operations in the first center and k-unit-time operations in the second center is proposed. The algorithm has the absolute worst-case error bound of k − 1 , and thus for k = 1 it is optimal. Importantly, it runs in linear time and its error bound is independent of the number of jobs to be processed. Moreover, the algorithm can be modified to give an optimal schedule for k = 2 .  相似文献   

8.
We consider server scheduling on parallel dedicated machines to minimize the makespan. Each job has a loading operation and a processing operation. The loading operation requires a server that serves all the jobs. Each machine has a given set of jobs to process, and the processing sequence is known and fixed. We design a polynomial‐time algorithm to solve the two‐machine case of the problem. When the number of machines is arbitrary, the problem becomes strongly NP‐hard even if all the jobs have the same processing length or all the loading operations require a unit time. We design two heuristic algorithms to treat the case where all the loading times are unit and analyze their performance.  相似文献   

9.
We consider a problem of scheduling jobs on m parallel machines. The machines are dedicated, i.e., for each job the processing machine is known in advance. We mainly concentrate on the model in which at any time there is one unit of an additional resource. Any job may be assigned the resource and this reduces its processing time. A job that is given the resource uses it at each time of its processing. No two jobs are allowed to use the resource simultaneously. The objective is to minimize the makespan. We prove that the two‐machine problem is NP‐hard in the ordinary sense, describe a pseudopolynomial dynamic programming algorithm and convert it into an FPTAS. For the problem with an arbitrary number of machines we present an algorithm with a worst‐case ratio close to 3/2, and close to 3, if a job can be given several units of the resource. For the problem with a fixed number of machines we give a PTAS. Virtually all algorithms rely on a certain variant of the linear knapsack problem (maximization, minimization, multiple‐choice, bicriteria). © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

10.
We consider parallel‐machine scheduling with a common server and job preemption to minimize the makespan. While the non‐preemptive version of the problem is strongly NP‐hard, the complexity status of the preemptive version has remained open. We show that the preemptive version is NP‐hard even if there is a fixed number of machines. We give a pseudo‐polynomial time algorithm to solve the case with two machines. We show that the case with an arbitrary number of machines is unary NP‐hard, analyze the performance ratios of some natural heuristic algorithms, and present several solvable special cases. © 2017 Wiley Periodicals, Inc. Naval Research Logistics 64: 388–398, 2017  相似文献   

11.
If the processing time of each job in a flow shop also depends on the time spent prior to processing, then the choice of a sequence influences processing times. This nonstandard scheduling problem is studied here for the minimum makespan schedule in a flow shop with two machines. The problem is NP-hard in the strong sense and already contains the main features of the general case [10]. Restricting to the case of permutation schedules, we first determine the optimal release times of the jobs for a given sequence. Permutation schedules are evaluated for this optimal policy, and the scheduling problem is solved using branch-and-bound techniques. We also show the surprising result that the optimal schedule may not be a permutation schedule. Numerical results on randomly generated data are provided for permutation schedules. Our numerical results confirm our preliminary study [10] that fairly good approximate solutions can efficiently be obtained in the case of limited computing time using the heuristics due to Gilmore and Gomory [7]. © 1993 John Wiley & Sons, Inc.  相似文献   

12.
The minimum makespan of the general parallel machine scheduling problem with m machines and n jobs is studied. As for a number of other important combinatorial problems, the theory of empirical processes proves to be a very elegant and powerful tool for the probabilistic analysis of the solution value. It is used in this paper to derive a scheduling constant θ such that, for random processing times, the minimum makespan almost surely grows as θn when n goes to infinity. Moreover, a thorough probabilistic analysis is performed on the difference between the minimum makespan and θn. Explicit expressions for the scheduling constant are given for an arbitrary number of unrelated machines with identically distributed processing times (with an increasing failure rate), and for an arbitrary number of uniform machines and generally distributed processing times. © 1996 John Wiley & Sons, Inc.  相似文献   

13.
We study a two‐machine flow shop scheduling problem with no‐wait in process, in which one of the machines is not available during a specified time interval. We consider three scenarios of handing the operation affected by the nonavailability interval. Its processing may (i) start from scratch after the interval, or (ii) be resumed from the point of interruption, or (iii) be partially restarted after the interval. The objective is to minimize the makespan. We present an approximation algorithm that for all these scenarios delivers a worst‐case ratio of 3/2. For the second scenario, we offer a 4/3‐approximation algorithm. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   

14.
In this article, we consider the concurrent open shop scheduling problem to minimize the total weighted completion time. When the number of machines is arbitrary, the problem has been shown to be inapproximable within a factor of 4/3 ‐ ε for any ε > 0 if the unique games conjecture is true in the literature. We propose a polynomial time approximation scheme for the problem under the restriction that the number of machines is fixed. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

15.
We consider the single machine parallel batch scheduling problems to minimize makespan and total completion time, respectively, under precedence relations. The complexities of these two problems are reported as open in the literature. In this paper, we settle these open questions by showing that both problems are strongly NP‐hard, even when the precedence relations are chains. When the processing times of jobs are directly agreeable or inversely agreeable with the precedence relations, there is an O(n2) time algorithm to minimize the makespan. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   

16.
This paper deals with the problem of makespan minimization in a flow shop with two machines when the input buffer of the second machine can only host a limited number of parts. Here we analyze the problem in the context of batch processing, i.e., when identical parts must be processed consecutively. We propose an exact branch-and-bound algorithm, in which the bounds exploit the batching nature of the problem. Extensive computational results show the effectiveness of the approach, and allow us to compare it with a previous heuristic approach. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 141–164, 1998  相似文献   

17.
Consider a two machine flow shop and n jobs. The processing time of job j on machine i is equal to the random variable Xij One of the two machines is subject to breakdown and repair. The objective is to find the schedule that minimizes the expected makespan. Two results are shown. First, ifP(X2j ≧ X1j) = 1 for all j and the random variables X11, X12,…, X1n are likelihood ratio ordered, then the SEPT sequence minimizes the expected makespan when machine 2 is subject to an arbitrary breakdown process; if P(X1j≧X2j) = 1 and X21, X22,….,X2n are likelihood ratio ordered, then the LEPT sequence minimizes the expected makespan when machine 1 is subject to an arbitrary breakdown process. A generalization is presented for flow shops with m machines. Second, consider the case where X1j and X2j are i.i.d. exponentially distributed with rate λj. The SEPT sequence minimizes the expected makespan when machine 2 is subject to an arbitrary breakdown process and the LEPT sequence is optimal when machine 1 is subject to an arbitrary breakdown process. © 1995 John Wiley & Sons, Inc.  相似文献   

18.
We consider problem of scheduling jobs on‐line on batch processing machines with dynamic job arrivals to minimize makespan. A batch machine can handle up to B jobs simultaneously. The jobs that are processed together from a batch, and all jobs in a batch start and complete at the same time. The processing time of a batch is given by the longest processing time of any job in the batch. Each job becomes available at its arrival time, which is unknown in advance, and its processing time becomes known upon its arrival. In the first part of this paper, we address the single batch processing machine scheduling problem. First we deal with two variants: the unbounded model where B is sufficiently large and the bounded model where jobs have two distinct arrival times. For both variants, we provide on‐line algorithms with worst‐case ratio (the inverse of the Golden ratio) and prove that these results are the best possible. Furthermore, we generalize our algorithms to the general case and show a worst‐case ratio of 2. We then consider the unbounded case for parallel batch processing machine scheduling. Lower bound are given, and two on‐line algorithms are presented. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 241–258, 2001  相似文献   

19.
The problem of minimum makespan on an m machine jobshop with unit execution time (UET) jobs (m ≥ 3) is known to be strongly NP‐hard even with no setup times. We focus in this article on the two‐machine case. We assume UET jobs and consider batching with batch availability and machine‐dependent setup times. We introduce an efficient \begin{align*}(O(\sqrt{n}))\end{align*} algorithm, where n is the number of jobs. We then introduce a heuristic for the multimachine case and demonstrate its efficiency for two interesting instances. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

20.
In the flow shop delivery time problem, a set of jobs has to be processed on m machines. Every machine has to process each one of the jobs, and every job has the same routing through the machines. The objective is to determine a sequence of the jobs on the machines so as to minimize maximum delivery completion time over all the jobs, where the delivery completion time of a job is the sum of its completion time, and the delivery time associated with that job. In this paper, we prove the asymptotic optimality of the Longest Delivery Time algorithm for the static version of this problem, and the Longest Delivery Time among Available Jobs (LDTA) algorithm for the dynamic version of this problem. In addition, we present the result of computational testing of the effectiveness of these algorithms. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2003  相似文献   