首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 343 毫秒
1.
Procedures are described which yield single and double sample Dodge-Romig [1] lot tolerance percent defective (LTPD) rectifying inspection plans. For the determination of such plans only a desk calculator and standard tables of the discrete probability distributions are required. Some advantages gained by using these procedures rather than the Dodge-Romig table include: (a) The Consumer's Risk is not limited to 0.10. (b) More choices of LTPD are available. (c) Smaller average total inspection is achieved by using a plan designed for specific “process average” and lot size rather than a compromise plan designed to cover intervals on these two parameters.  相似文献   

2.
This article discusses the behavior of three continuous sampling plans: continuous sampling plan 1 (CSP 1) and continuous sampling plan 2 (CSP 2) developed by Dodge [5] and Dodge and Torrey [7], and multilevel continuous sampling plan 2 (MLP 2) developed by Lieberman and Solomon [11], when the quality of successive units in a continuous production process follows a two-state time-homogeneous Markov chain. We first derive the average outgoing quality (AOQ) expressions of these plans. Exact procedures for determining the average outgoing quality limit (AOQL) can be obtained only for CSP 1. For CSP 2 and MLP 2 plans, iterative procedures have been used to obtain the AOQL contours. For these plans, it is assumed that the serial correlation coefficient between the two consecutive random variables of the Markov chain is known. In addition, estimation procedures for the coefficient are given. We show that if the serial correlation coefficient of the Markov chain is positive (negative), the AOQL is increased (decreased) as compared to the case when the successive units in the production process follows a Bernoulli pattern. Let r denote the number of production units examined in succession which are found to be of good quality and k denote the inverse of the sampling fraction employed when quality is good. Then if r and k are sufficiently small, it is observed from the graph that, for small departures of the serial correlation coefficient from zero, the AOQL values do not differ significantly for each of the three plans; whereas for sufficiently large values of r and k, the AOQL values differ significantly. Various aspects of these plans, such as their operating characteristics 2 (OC 2) and the serial correlation coefficient, are discussed.  相似文献   

3.
根据序贯概率比检验的理论,给出计数序贯抽样检验方案的设计原理,得到国家标准GB/T8051—2008中计数序贯抽样检验方案的OC函数和ASN的计算方法。  相似文献   

4.
Acceptance sampling plans are used to assess the quality of an ongoing production process, in addition to the lot acceptance. In this paper, we consider sampling inspection plans for monitoring the Markov‐dependent production process. We construct sequential plans that satisfy the usual probability requirements at acceptable quality level and rejectable quality level and, in addition, possess the minimum average sample number under semicurtailed inspection. As these plans result in large sample sizes, especially when the serial correlation is high, we suggest new plans called “systematic sampling plans.” The minimum average sample number systematic plans that satisfy the probability requirements are constructed. Our algorithm uses some simple recurrence relations to compute the required acceptance probabilities. The optimal systematic plans require much smaller sample sizes and acceptance numbers, compared to the sequential plans. However, they need larger production runs to make a decision. Tables for choosing appropriate sequential and systematic plans are provided. The problem of selecting the best systematic sampling plan is also addressed. The operating characteristic curves of some of the sequential and the systematic plans are compared, and are observed to be almost identical. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 451–467, 2001  相似文献   

5.
Renewal theory is used to study the effectiveness of a class of continuous sampling plans first introduced by Dodge. This approach provides a simple way of viewing and computing the long-run Average Outgoing Quality (AOQ) and its maximum AOQL. More importantly, it is used to study the average outgoing quality in a short production run through an approximation formula AOQ*(t). Formulas for AOQ and AOQ*(t) are provided. By simulation, it is found that AOQ*(t) is sufficiently accurate in situations corresponding to actual practice.  相似文献   

6.
For situations where there are several markets with different profit-cost structures, economic attributes sampling plans are developed for determining the market to ship the lot to. Two sampling plans are considered; the fixed-size sampling plan with several levels of acceptance numbers, and the inverse sampling plan with several levels of sample sizes. Linear profit models are constructed which involve four profit/cost components; profit from a conforming item, inspection cost, replacement cost, and cost from an accepted nonconforming item. For fixed-size and inverse sampling plans, methods of finding optimal sampling plans are presented and examples with beta-binomial prior distributions are given.  相似文献   

7.
Bayesian models for multiattribute acceptance sampling have been developed under the assumption that sampling inspection is carried to completion. A Bayesian multiattribute model for stepwise sampling inspection is proposed, whereby sampling inspection is terminated as soon as the disposition of the inspection lot is determined. An iterative solution procedure is developed for obtaining optimal or near-optimal multiattribute acceptance sampling plans under stepwise sampling inspection. The effect of stepwise sampling inspection on the characteristics of an optimal sampling plan is investigated. It is shown that stepwise sampling inspection achieves a sampling plan with lower total expected cost than complete sampling inspection. In addition, it is shown that the sequence of attributes in a stepwise sampling inspection substantially affects the sampling plan and resultant expected cost. The proposed methodology is used to evaluate various heuristics which may be used to determine the sequence of attributes in a stepwise inspection procedure.  相似文献   

8.
The historical and, to some extent, the current role of attribute inspection sampling in the United States Air Force is described. Some insight into consideration culminating in revisions made to the original MIL-STD-105 sampling plans is provided. These revisions were motivated from a practitioner's perspective rather than that of a statistical expert. Some significant administrative applications within the Air Force are described, and a practical method, based on the total amount of inspection, is given for distinguishing between sampling plans that have a fixed risk level (i.e., common value on the OC curves).  相似文献   

9.
给出了制定药物效用鉴定的序贯抽样检验方案,对未用的同类药品进行随机抽样,利用抽样结果,对剩下的N-n个样品的性能进行推断,得到判断药品是否失效的抽样方法以及有效的抽样截断方案,在减小抽样量的前提下,准确的判断药物是否有效.并对该序贯抽样性能的优劣与固定样本最优检验方法进行了比较,得到在犯同样错误的前提下,序贯抽样检验的样本量比固定样本最优检验的样本量小的多.  相似文献   

10.
Traditionally continuous sampling plans have been evaluated according to relatively few criteria. These typically include the OC curve (on which AQL systems are based), the ASN, and the AOQ curve. These characteristics are all calculated under the assumption that the process is “in control” so that mathematically they are derived as long-term averages. Thus, any two plans which (long term) spend the same proportion of time on each type of sampling inspection will be identical relative to these criteria. This is true whether sampling from lots or doing unit-by-unit inspection. The goal is to first establish desirable additional criteria and then to develop methods to determine which procedure (of those which satisfy the standard criteria) is optimal relative to the new criteria. To be considered will be measures of a plan's ability to detect a sudden drop in quality (such as ARL).  相似文献   

11.
This paper investigates the relationships among incoming quality limit (AIQL), manufacturing quality level in each stage of production, and outgoing quality limit (AOQL), for a multistage manufacturing connected-unit situation from the systems cost-effectiveness point of view. An objective function is developed and the formulated problem is solved using discrete optimization technique. The study is restricted to the development of single sampling plans where inspection is by attribute. Lot size and sample size are fixed for incoming and outgoing inspection for each stage of manufacturing.  相似文献   

12.
This paper presents a procedure akin to dynamic programming for designing optimal acceptance sampling plans for item-by-item inspection. Using a Bayesian procedure, a prior distribution is specified, and a suitable cost model is employed depicting the cost of sampling, accepting or rejecting the lot. An algorithm is supplied which is digital computer oriented.  相似文献   

13.
文对ISO2859、JISZ9015和GB2828三个标准的放宽检查抽样方案的OC和ASN曲线进行了全面的计算和分析,重点讨论了上述标准的二次和多次抽样方案的等效性和有效性,并对各标准优良性进行了分析和评价。  相似文献   

14.
Although there has been considerable research directed toward developing Bayesian acceptance sampling plans, little consideration has been given to incorporating a decision-maker's risk attitude or treating such problems in terms of multiple-type defects and multiple criteria. We review our own work which is focused on the above issues. A model incorporating risk preference is shown to yield substantial differences in the characteristics of an optimal sampling plan relative to a typical Bayesian linear cost (risk neutral) model. Bayesian models and optimization schemes for a variety of multiple-type defect plans are reviewed. A bicriterion acceptance model, employing average outgoing quality and average inspection cost is also formulated. Traditional versus interactive optimization procedures are compared empirically in terms of ease of use, satisfaction with solutions, and insight gained into the problem.  相似文献   

15.
The standard problem in sampling inspection is to consider plans with and without curtailment. Curtailment causes difficulty and authors rarely give exact results (i.e., exact OC and ASN functions) for curtailed procedures. In this article we regard curtailment as an inverse sampling procedure and use Dirichlet integrals to obtain exact formulas for the OC, the ASN, and also the variance of the number of observations required under three types of plans: no curtailment, semicurtailment (for rejection only) and two-sided curtailment. Different sections of the article deal with the single sample, the two-stage, and the multiple-stage sampling problems. New tables for carrying out the single-sample procedure are included in the article. The authors feel that this article presents new directions and new ways of dealing with problems associated with quality control.  相似文献   

16.
In this article we study the properties of the optimal Bayesian single-sampling plans when the prior distribution of the lot fraction defective is modified Beta, which has been found useful in the analysis of inspection schemes for complex production systems. These properties are used to devise an improved and more efficient algorithm for the determination of the optimal sampling plans. Numerical examples are presented to illustrate the potential computational savings of the algorithm.  相似文献   

17.
The Quality Measurement Plan (QMP) and the Universal Sampling Plan (USP) are the data analysis and sampling plans for the AT&T Technologies quality audit. This article describes QMP/USP, an acceptance sampling plan based on QMP and USP principles. QMPIUSP is a complete acceptance sampling system. It combines the elements of classical rectification inspection plans with those of MIL-STD-IOSD. There is no switching between plans, no tables of numbers to look through, and no discontinue state. QMP/USP is a computerized, self-contained system that features:
  • Acceptance decisions based on the QMP Bayes empirical Bayes analysis of current and past sampling result
  • Sample size selection based on USP, i.e., lot size, AQL, a cost ratio, the QMP analysis, and a budget constraint
  • Guaranteed AOQ
  • A complete statistical analysis of the quality process.
In this article, we describe the operation of QMP/USP and compare its performance with that of MIL-STD-IOSD. The comparison is made under many different quality environments with many metrics. Our results show that QMP/USP and MIL/STD/IOSD perform similarly for the environments where quality could be described as “in control”; and that QMPlUSP is superior in the environments where quality is “out of control”.  相似文献   

18.
本文通过分析一般工业产品计数抽样检验方法与外语单词专项测验的特点,发现二者本质相同。利用统计抽样方法不仅可以获得随机样本(试卷),排除某些主观干扰,同时还可以对受试方和考核方风险率进行评价和选择(按四个分级标准,给出了风险率不同的六组测验方案)。此法已为《大学英语词汇系统软件》采用.  相似文献   

19.
Because of the rapid growth in automated manufacturing systems, complete inspection (screening) becomes very attractive. Sophisticated automated inspection equipment can efficiently process a large number of items and produce consistent and accurate results. However, in many applications the performance variable of interest is expensive to measure even by using automated inspection equipment. One alternative to deal with this problem is to use another variable, which is correlated with the performance variable and relatively inexpensive to measure as the screening variable. Since a screening variable is not perfectly correlated with the performance variable, decision errors that reject good-quality items or accept poor-quality items may occur. To reduce these errors, we propose a two-stage screening procedure in which the first-stage screening is based on a screening variable and the second-stage screening is based on the performance variable. The second-stage screening is performed only on those items of which the disposition cannot clearly be determined by the result of first stage screening. Three losses are considered in the formulation of the model. The first loss is the cost of inspection, the second loss is the cost associated with the disposition of rejected items, and the third loss is incurred by imperfect quality of accepted items. The optimal solution is derived and compared to the single-stage screening procedures based on the screening variable and the performance variable. In addition, the sensitivity of the optimal screening procedure with respect to the correlation between the performance variable and the screening variable and the cost of inspecting the performance variable is discussed and demonstrated by numerical results.  相似文献   

20.
An integral part of the MIL–STD–105D scheme for sampling inspection by attributes is the transfer from normal inspection to reduced or tightened inspection when the historical record of inspected lots suggests unusually good or bad quality. The switching rules in MIL–STD–105D have been criticized, especially by Japanese manufacturers, as being too severe when what is defined as acceptable quality material is submitted. This paper examines the long range fraction of lots rejected for several MIL–STD–105D sampling plans by using the MIL–STD–105D switching rules, using a modification suggested by the Japanese Standards Association, and by using a second modification developed by the authors. The Japanese Standards Association switching rules are more complex than those in MIL–STD–105D. It is demonstrated that they lead to improved long–range properties for Normal–Tightened–Reduced schemes, but to poorer properties for Normal–Tightened schemes. A simplified set of switching rules is suggested, wherein the “limit numbers” in MIL–STD–105D are eliminated. In comparison to MIL–STD–105D, the simpler rules lead to a lower probability of rejection for good lots and a comparable probability of rejection for bad lots.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号