首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 531 毫秒
1.
In this article, we study the Shewhart chart of Q statistics proposed for the detection of process mean shifts in start‐up processes and short runs. Exact expressions for the run‐length distribution of this chart are derived and evaluated using an efficient computational procedure. The procedure can be considerably faster than using direct simulation. We extend our work to analyze the practice of requiring multiple signals from the chart before responding, a practice sometimes followed with Shewhart charts. The results show that waiting to receive multiple signals severely reduces the probability of quickly detecting shifts in certain cases, and therefore may be considered a risky practice. Operational guidelines for practitioners implementing the chart are discussed. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2009  相似文献   

2.
We consider an exponential repair model with s machines and one repairman. The machines' failure rates are equal but the repair rate may change from machine to machine. The repairman repairs the failed machines one at a time and in the course of his work he may even interrupt repairing one machine and start another. We compare repair policies and prove an optimality result by means of stochastic order. The proof is based on representing the compared models simultaneously in a special way and comparing then the sample paths of the interesting stochastic processes.  相似文献   

3.
We consider the problem of scheduling N jobs on M parallel machines so as to minimize the maximum earliness or tardiness cost incurred for each of the jobs. Earliness and tardiness costs are given by general (but job-independent) functions of the amount of time a job is completed prior to or after a common due date. We show that in problems with a nonrestrictive due date, the problem decomposes into two parts. Each of the M longest jobs is assigned to a different machine, and all other jobs are assigned to the machines so as to minimize their makespan. With these assignments, the individual scheduling problems for each of the machines are simple to solve. We demonstrate that several simple heuristics of low complexity, based on this characterization, are asymptotically optimal under mild probabilistic conditions. We develop attractive worst-case bounds for them. We also develop a simple closed-form lower bound for the minimum cost value. The bound is asymptotically accurate under the same probabilistic conditions. In the case where the due date is restrictive, the problem is more complex only in the sense that the set of initial jobs on the machines is not easily characterized. However, we extend our heuristics and lower bounds to this general case as well. Numerical studies exhibit that these heuristics perform excellently even for small- or moderate-size problems both in the restrictive and nonrestrictive due-date case. © 1997 John Wiley & Sons, Inc.  相似文献   

4.
We consider server scheduling on parallel dedicated machines to minimize the makespan. Each job has a loading operation and a processing operation. The loading operation requires a server that serves all the jobs. Each machine has a given set of jobs to process, and the processing sequence is known and fixed. We design a polynomial‐time algorithm to solve the two‐machine case of the problem. When the number of machines is arbitrary, the problem becomes strongly NP‐hard even if all the jobs have the same processing length or all the loading operations require a unit time. We design two heuristic algorithms to treat the case where all the loading times are unit and analyze their performance.  相似文献   

5.
We consider a class of production scheduling models with m identical machines in parallel and k different product types. It takes a time pi to produce one unit of product type i on any one of the machines. There is a demand stream for product type i consisting of ni units with each unit having a given due date. Before a machine starts with the production of a batch of products of type i a setup cost c is incurred. We consider several different objective functions. Each one of the objective functions has three components, namely a total setup cost, a total earliness cost, and a total tardiness cost. In our class of problems we find a relatively large number of problems that can be solved either in polynomial time or in pseudo‐polynomial time. The polynomiality or pseudo‐polynomiality is achieved under certain special conditions that may be of practical interest; for example, a regularity pattern in the string of due dates combined with earliness and tardiness costs that are similar for different types of products. The class of models we consider includes as special cases discrete counterparts of a number of inventory models that have been considered in the literature before, e.g., Wagner and Whitin (Manage Sci 5 (1958), 89–96) and Zangwill (Oper Res 14 (1966), 486–507; Manage Sci 15 (1969), 506–527). © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

6.
We consider a problem of scheduling jobs on m parallel machines. The machines are dedicated, i.e., for each job the processing machine is known in advance. We mainly concentrate on the model in which at any time there is one unit of an additional resource. Any job may be assigned the resource and this reduces its processing time. A job that is given the resource uses it at each time of its processing. No two jobs are allowed to use the resource simultaneously. The objective is to minimize the makespan. We prove that the two‐machine problem is NP‐hard in the ordinary sense, describe a pseudopolynomial dynamic programming algorithm and convert it into an FPTAS. For the problem with an arbitrary number of machines we present an algorithm with a worst‐case ratio close to 3/2, and close to 3, if a job can be given several units of the resource. For the problem with a fixed number of machines we give a PTAS. Virtually all algorithms rely on a certain variant of the linear knapsack problem (maximization, minimization, multiple‐choice, bicriteria). © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

7.
We study optimal age‐replacement policies for machines in series with non‐instantaneous repair times by formulating two nonlinear programs: one that minimizes total cost‐rate subject to a steady‐state throughput requirement and another that maximizes steady‐state throughput subject to a cost‐rate budget constraint. Under reasonable assumptions, the single‐machine cost‐optimal and throughput‐optimal solutions are unique and orderable, and the multi‐machine optimal solutions have appealing structure. Furthermore, we establish equivalence between the two formulations and provide an illustrative numerical example. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

8.
Lot splitting refers to breaking a production lot into smaller sublots during production. Coordinating lot splitting decisions across multiple stages of a production process is a challenging task. Traditional lot splitting and lot streaming models implicitly assume that the entire system is operated and owned by the same firm, or there exists a coordinator who controls the operation of all machines in the system. In this paper, we consider the situation where the machines in a multiple‐stage production process are owned and managed by different companies. Every item in a given production lot has to go through the processing by the supplier's machine, followed by the manufacturer's machine, and so on. We develop and analyze coordination mechanisms that enable different parties in the supply chain to coordinate their lot splitting decisions so as to achieve a systemwide optimum. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   

9.
10.
We consider a system of N (nonsymmetric) machine centers of the K-out-of-M : G type that are maintained by a single repairman. [A machine center functions if and only if at least K of the M machines belonging to the center are good (G).] Such systems are commonly found in various manufacturing and service industries. A stochastic model is developed that accommodates generally distributed repair times and repairman walk times, and most repair scheduling disciplines. K-out-of-M : G type systems also appear as a modeling paradigm in reliability analysis and polling systems performance analysis. Several performance measures are derived for machine-repair systems having K-out-of-M-type centers. A simple example system is developed in detail that exposes the computations involved in modeling applications. © 1992 John Wiley & Sons, Inc.  相似文献   

11.
This paper develops a forward algorithm and planning horizon procedures for an important machine replacement model where it is assumed that the technological environment is improving over time and that the machine-in-use can be replaced by any of the several different kinds of machines available at that time. The set of replacement alternatives may include (i) new machines with different types of technologies such as labor- and capital- intensive, (ii) used machines, (iii) repairs and/or improvements which affect the performance characteristics of the existing machine, and so forth. The forward dynamic programming algorithm in the paper can be used to solve a finite horizon problem. The planning horizon results give a procedure to identify the forecast horizon T such that the optimal replacement decision for the first machine based on the forecast of machine technology until period T remains optimal for any problem with horizon longer than T and, for that matter, for the infinite horizon problem. A flow chart and a numerical example have been included to illustrate the algorithm.  相似文献   

12.
In this paper we study a machine repair problem in which a single unreliable server maintains N identical machines. The breakdown times of the machines are assumed to follow an exponential distribution. The server is subject to failure and the failure times are exponentially distributed. The repair times of the machine and the service times of the repairman are assumed to be of phase type. Using matrix‐analytic methods, we perform steady state analysis of this model. The time spent by a failed machine in service and the total time in the repair facility are shown to be of phase type. Several performance measures are evaluated. An optimization problem to determine the number of machines to be assigned to the server that will maximize the expected total profit per unit time is discussed. An illustrative numerical example is presented. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 462–480, 2003  相似文献   

13.
In this article we present an algorithm for the minimum makespan preemptive open shop, which is superior to existing algorithms in both space and time requirements. We define the more complex generalized open shop and flexible open shop and address the minimum makespan problem on these shops. We show how we can use the algorithm for the minimum makespan open shop to achieve load balancing in simple and generalized open shops without increasing the complexity of the algorithm. Load balancing dictates that the number of busy machines in each period is as even as possible. We also consider preventive maintenance issues in the open shop, and makespan retains its minimum value. In particular we consider the scenario where a machine can be maintained during any period that it happens to be idle. Also we consider the case that a maintenance schedule is prespecified. We show that this problem can be solved via a linear programming formulation that can also take into account release times for the jobs and ready times for the machines. Faster algorithms are presented for open shops with three machines or less. © 1995 John Wiley & Sons, Inc.  相似文献   

14.
State‐level newborn screening allows for early treatment of genetic disorders, which can substantially improve health outcomes for newborns. As the cost of genetic testing decreases, it is becoming an essential part of newborn screening. A genetic disorder can be caused by many mutation variants; therefore, an important decision is to determine which variants to search for (ie, the panel design), under a testing budget. The frequency of variants that cause a disorder and the incidence of the disorder vary by racial/ethnic group. Consequently, it is important to consider equity issues in panel design, so as to reduce disparities among different groups. We study the panel design problem using cystic fibrosis (CF) as a model disorder, considering the trade‐offs between equity and accuracy, under a limited budget. Most states use a genetic test in their CF screening protocol, but panel designs vary, and, due to cost, no state's panel includes all CF‐causing variants. We develop models that design equitable genetic testing panels, and compare them with panels that maximize sensitivity in the general population. Our case study, based on realistic CF data, highlights the value of equitable panels and provides important insight for newborn screening practices.  相似文献   

15.
We consider a single machine scheduling problem in which the objective is to minimize the mean absolute deviation of job completion times about a common due date. We present an algorithm for determining multiple optimal schedules under restrictive assumptions about the due date, and an implicit enumeration procedure when the assumptions do not hold. We also establish the similarity of this problem to the two parallel machines mean flow time problem.  相似文献   

16.
Consider a two machine flow shop and n jobs. The processing time of job j on machine i is equal to the random variable Xij One of the two machines is subject to breakdown and repair. The objective is to find the schedule that minimizes the expected makespan. Two results are shown. First, ifP(X2j ≧ X1j) = 1 for all j and the random variables X11, X12,…, X1n are likelihood ratio ordered, then the SEPT sequence minimizes the expected makespan when machine 2 is subject to an arbitrary breakdown process; if P(X1j≧X2j) = 1 and X21, X22,….,X2n are likelihood ratio ordered, then the LEPT sequence minimizes the expected makespan when machine 1 is subject to an arbitrary breakdown process. A generalization is presented for flow shops with m machines. Second, consider the case where X1j and X2j are i.i.d. exponentially distributed with rate λj. The SEPT sequence minimizes the expected makespan when machine 2 is subject to an arbitrary breakdown process and the LEPT sequence is optimal when machine 1 is subject to an arbitrary breakdown process. © 1995 John Wiley & Sons, Inc.  相似文献   

17.
We consider order-quantity/reorder-point inventory models where the availability of supply is subject to random fluctuations. We use concepts from renewal reward processes to develop average cost objective function models for single, two, and multiple suppliers. Identifying the regenerative cycle for each problem aids the development of the cost function. In the case of two suppliers, spectral theory is used to derive explicit expressions for the transient probabilities of a four-state continuous-time Markov chain representing the status of the system. These probabilities are used to compute the exact form of the average cost expression. For the multiple-supplier problem, assuming that all the suppliers have similar availability characteristics, we develop a simple model and show that as the number of suppliers becomes large, the model reduces to the classical EOQ model. © 1996 John Wiley & Sons, Inc.  相似文献   

18.
Motivated by the flow of products in the iron and steel industry, we study an identical and parallel machine scheduling problem with batch deliveries, where jobs finished on the parallel machines are delivered to customers in batches. Each delivery batch has a capacity and incurs a cost. The objective is to find a coordinated production and delivery schedule that minimizes the total flow time of jobs plus the total delivery cost. This problem is an extension of the problem considered by Hall and Potts, Ann Oper Res 135 (2005) 41–64, who studied a two‐machine problem with an unbounded number of transporters and unbounded delivery capacity. We first provide a dynamic programming algorithm to solve a special case with a given job assignment to the machines. A heuristic algorithm is then presented for the general problem, and its worst‐case performance ratio is analyzed. The computational results show that the heuristic algorithm can generate near‐optimal solutions. Finally, we offer a fully polynomial‐time approximation scheme for a fixed number of machines. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 492–502, 2016  相似文献   

19.
In the last decade, there has been much progress in understanding scheduling problems in which selfish jobs aim to minimize their individual completion time. Most of this work has focused on makespan minimization as social objective. In contrast, we consider as social cost the total weighted completion time, that is, the sum of the agent costs, a standard definition of welfare in economics. In our setting, jobs are processed on restricted uniform parallel machines, where each machine has a speed and is only capable of processing a subset of jobs; a job's cost is its weighted completion time; and each machine sequences its jobs in weighted shortest processing time (WSPT) order. Whereas for the makespan social cost the price of anarchy is not bounded by a constant in most environments, we show that for our minsum social objective the price of anarchy is bounded above by a small constant, independent of the instance. Specifically, we show that the price of anarchy is exactly 2 for the class of unit jobs, unit speed instances where the finite processing time values define the edge set of a forest with the machines as nodes. For the general case of mixed job strategies and restricted uniform machines, we prove that the price of anarchy equals 4. From a classical machine scheduling perspective, our results establish the same constant performance guarantees for WSPT list scheduling. © 2012 Wiley Periodicals, Inc. Naval Research Logistics, 2012  相似文献   

20.
We consider the problem of assigning a set of jobs to different parallel machines of the same processing speed, where each job is compatible to only a subset of those machines. The machines can be linearly ordered such that a higher‐indexed machine can process all those jobs that a lower‐indexed machine can process. The objective is to minimize the makespan of the schedule. This problem is motivated by industrial applications such as cargo handling by cranes with nonidentical weight capacities, computer processor scheduling with memory constraints, and grades of service provision by parallel servers. We develop an efficient algorithm for this problem with a worst‐case performance ratio of + ε, where ε is a positive constant which may be set arbitrarily close to zero. We also present a polynomial time approximation scheme for this problem, which answers an open question in the literature. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号