首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 718 毫秒
1.
Statistical quality control of complicated production processes subject to a multiplicity of assignable causes may require the utilization of control charts with multiple control limits. This article presents an approximate semieconomic design of such charts, which is easily implementable in practical situations. Evaluations of the semieconomic control chart design show that the proposed approximate method results in solutions that are very close to the true optima and can be obtained with minimal computational effort.  相似文献   

2.
We consider design of control charts in the presence of machine stoppages that are exogenously imposed (as under jidoka practices). Each stoppage creates an opportunity for inspection/repair at reduced cost. We first model a single machine facing opportunities arriving according to a Poisson process, develop the expressions for its operating characteristics and construct the optimization problem for economic design of a control chart. We, then, consider the multiple machine setting where individual machine stoppages may create inspection/repair opportunities for other machines. We develop exact expressions for the cases when all machines are either opportunity‐takers or not. On the basis of an approximation for the all‐taker case, we then propose an approximate model for the mixed case. In a numerical study, we examine the opportunity taking behavior of machines in both single and multiple machine settings and the impact of such practices on the design of an X – Q C chart. Our findings indicate that incorporating inspection/repair opportunities into QC chart design may provide considerable cost savings. © 2009 Wiley Periodicals, Inc. Naval Research Logistics 2009  相似文献   

3.
The existing literature on economic design of process control charts generally assumes perfect process adjustment, such that the process mean is returned to an exactly centered “in control” state following any real or false alarm control chart signal. This paper presents a model which demonstrates the effects of imperfect process adjustment on the economically designed control chart parameters. The model demonstrates that the optimal control limit width depends fundamentally on the precision with which the process can be adjusted. The greater the process adjustment error, all else constant, the wider will be the optimal control limits, in order to alleviate the potential for process overcontrol and tampering effects. By endogenously modeling these effects, the new model helps to rectify the problem of poor statistical properties for which the economic design approach has been criticized. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 597–612, 1999  相似文献   

4.
MacGregor and Harris (J Quality Technol 25 (1993) 106–118) proposed the exponentially weighted mean squared deviation (EWMS) and the exponentially weighted moving variance (EWMV) charts as ways of monitoring process variability. These two charts are particularly useful for individual observations where no estimate of variability is available from replicates. However, the control charts derived by using the approximate distributions of the EWMS and EWMV statistics are difficult to interpret in terms of the average run length (ARL). Furthermore, both control charting schemes are biased procedures. In this article, we propose two new control charts by applying a normal approximation to the distributions of the logarithms of the weighted sum of chi squared random variables, which are respectively functions of the EWMS and EWMV statistics. These new control charts are easy to interpret in terms of the ARL. On the basis of the simulation studies, we demonstrate that the proposed charts are superior to the EWMS and EWMV charts and they both are nearly unbiased for the commonly used smoothing constants. We also compare the performance of the proposed charts with that of the change point (CP) CUSUM chart of Acosta‐Mejia (1995). The design of the proposed control charts is discussed. An example is also given to illustrate the applicability of the proposed control charts. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2009  相似文献   

5.
Control charts are widely used for process surveillance. The design of a control chart refers to the choice of sample size, the width of the control limits, and the interval between samples. Economic designs have been widely investigated and shown to be an effective method of determining control chart parameters. This article describes two different manufacturing process models to which the X¯ control chart is applied: The first model assumes that the process continues in operation while searches for the assignable cause are made, and the second assumes that the process must be shut down during the search. Economic models of the control chart for these two manufacturing process models are developed, and the sensitivity of the control chart parameters to the choice of model is explored. It is shown that the choice of the proper manufacturing process model is critical because selection of an inappropriate process model may result in significant economic penalties.  相似文献   

6.
This article considers the problem of monitoring Poisson count data when sample sizes are time varying without assuming a priori knowledge of sample sizes. Traditional control charts, whose control limits are often determined before the control charts are activated, are constructed based on perfect knowledge of sample sizes. In practice, however, future sample sizes are often unknown. Making an inappropriate assumption of the distribution function could lead to unexpected performance of the control charts, for example, excessive false alarms in the early runs of the control charts, which would in turn hurt an operator's confidence in valid alarms. To overcome this problem, we propose the use of probability control limits, which are determined based on the realization of sample sizes online. The conditional probability that the charting statistic exceeds the control limit at present given that there has not been a single alarm before can be guaranteed to meet a specified false alarm rate. Simulation studies show that our proposed control chart is able to deliver satisfactory run length performance for any time‐varying sample sizes. The idea presented in this article can be applied to any effective control charts such as the exponentially weighted moving average or cumulative sum chart. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 60: 625–636, 2013  相似文献   

7.
The traditional approach to economic design of control charts is based on the assumption that a process is monitored using only a performance variable. If, however, the performance variable is costly to measure and a less expensive surrogate variable is available, the process may be more efficiently controlled by using both performance and surrogate variables. In this article we propose a model for economic design of a two-stage control chart which uses a highly correlated surrogate variable together with a performance variable. The process is assumed to be monitored by the surrogate variable until it signals out-of-control behavior, then by the performance variable until it signals out-of-control behavior or maintains in-control signals for a prespecified amount of time, and the two variables are used in alternating fashion. An algorithm based on the direct search method of Hooke and Jeeves [6] is used to find the optimum values of design parameters. The proposed model is applied to the end-closure welding process for nuclear fuel to compute the amount of reduction in cost compared with the current control procedure. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 958–977, 1999  相似文献   

8.
Conventional control charts are often designed to optimize out‐of‐control average run length (ARL), while constraining in‐control ARL to a desired value. The widely employed grid search approach in statistical process control (SPC) is time‐consuming with unsatisfactory accuracy. Although the simulation‐based ARL gradient estimators proposed by Fu and Hu [Manag Sci 45 (1999), 395–413] can alleviate this issue, it still requires a large number of simulation runs to significantly reduce the variance of gradient estimators. This article proposes a novel ARL gradient estimation approach based on integral equation for efficient analysis and design of control charts. Although this article compares with the results of Fu and Hu [Manag Sci 45 (1999), 395–413] based on the exponentially weighted moving average (EWMA) control chart, the proposed approach has wide applicability as it can generally fit into any control chart with Markovian property under any distributions. It is shown that the proposed method is able to provide a fast, accurate, and easy‐to‐implement algorithm for the design and analysis of EWMA charts, as compared to the simulation‐based gradient estimation method. Moreover, the proposed gradient estimation method facilitates the computation of high‐order derivatives that are valuable in sensitivity analysis. The code is written in Matlab, which is available on request. © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 223–237, 2014  相似文献   

9.
建立火箭及其分离残骸弹道计算动力学模型,并采用四元数方法对姿态角解算进行处理。提出基于优化加点Kriging模型的安全区预示方法,结合Monte Carlo和Kriging代理模型的特点,给出安全区预示流程。以某型助推火箭残骸安全区计算为例,对提出的安全区预示方法进行仿真验证。仿真结果表明:提出的基于优化加点Kriging模型安全区预示方法与Monte Carlo方法相比,在不损失计算精度的前提下,具有更高的计算效率,满足快速迭代的工程需求,相比传统极限偏差叠加方法,可显著降低安全区覆盖面积,具有较强的工程应用价值。  相似文献   

10.
This paper proposes a kurtosis correction (KC) method for constructing the X? and R control charts for symmetrical long‐tailed (leptokurtic) distributions. The control charts are similar to the Shewhart control charts and are very easy to use. The control limits are derived based on the degree of kurtosis estimated from the actual (subgroup) data. It is assumed that the underlying quality characteristic is symmetrically distributed and no other distributional and/or parameter assumptions are made. The control chart constants are tabulated and the performance of these charts is compared with that of the Shewhart control charts. For the case of the logistic distribution, the exact control limits are derived and are compared with the KC method and the Shewhart method. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

11.
This study investigates the statistical process control application for monitoring queue length data in M/G/1 systems. Specifically, we studied the average run length (ARL) characteristics of two different control charts for detecting changes in system utilization. First, the nL chart monitors the sums of successive queue length samples by subgrouping individual observations with sample size n. Next is the individual chart with a warning zone whose control scheme is specified by two pairs of parameters, (upper control limit, du) and (lower control limit, dl), as proposed by Bhat and Rao (Oper Res 20 (1972) 955–966). We will present approaches to calculate ARL for the two types of control charts using the Markov chain formulation and also investigate the effects of parameters of the control charts to provide useful design guidelines for better performance. Extensive numerical results are included for illustration. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

12.
This paper proposes a skewness correction (SC) method for constructing the and R control charts for skewed process distributions. Their asymmetric control limits (about the central line) are based on the degree of skewness estimated from the subgroups, and no parameter assumptions are made on the form of process distribution. These charts are simply adjustments of the conventional Shewhart control charts. Moreover, the chart is almost the same as the Shewhart chart if the process distribution is known to be symmetrical. The new charts are compared with the Shewhart charts and weighted variance (WV) control charts. When the process distribution is in some neighborhood of Weibull, lognormal, Burr or binomial family, simulation shows that the SC control charts have Type I risk (i.e., probability of a false alarm) closer to 0.27% of the normal case. Even in the case where the process distribution is exponential with known mean, not only the control limits and Type I risk, but also the Type II risk of the SC charts are closer to those of the exact and R charts than those of the WV and Shewhart charts. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 555–573, 2003  相似文献   

13.
The distribution of the range of a sample, even in the case of a normal distribution, is not symmetric. Shewhart's control chart for range and other approximations for range from skewed distributions and long‐tailed (leptokurtic) symmetrical distributions assume the distribution of range as symmetric and provide 3 sigma control limits. We provide accurate approximations for the R‐chart control limits for the leptokurtic symmetrical distributions, using a range quantile approximation (RQA) method and illustrate the use of the RQA method with a numerical example. As special cases, we provide constants for the R‐chart for the normal, logistic, and Laplace distributions. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

14.
The flow-shop scheduling problem with sequence-dependent additive setup times is considered as a special case of the general problem, and a polynomially bounded approximate method is developed to find a minimum makespan permutation schedule. The approximate algorithm is shown to yield optimal results for the two-machine case. A version of Sule's model is defined that produces the first approximation of the optimal solution for this problem. Computational experience along with numerical examples are provided to test the effectiveness of the method.  相似文献   

15.
This paper introduces a special control chart procedure for exponentially distributed product life. Statistical control of product life in manufacturing requires continuing life tests of manufactured product so as to detect changes in product life and take appropriate corrective action. These life testing experiments may become exceedingly time consuming and thus can be both impractical because of serious time delays in implementing corrective action on the process when indicated, and quite uneconomical. It is desirable to inquire into the character of life testing by means of a control chart procedure based on the real time to first failure within given samples. Measuring the real minimum life provides a considerable reduction in duration of the testing procedure and in the number of specimens destroyed, yielding a considerable economy over the Shewhart's X control chart.  相似文献   

16.
Taiwan's international status is such that the country's ability to trade and to supply certain goods and technologies remains its primary means of practicing diplomacy and asserting international influence. U.S. pressure to conform to international nonproliferation standards has made the issue of export controls a troubling one for Taiwan. Limiting Taiwan's economic relations affects its ability to sustain itself economically and to maintain productive relations with other nations. On the other hand, as a recipient of U.S. high-technology transfers and security assurances, Taiwan cannot ignore the directives of the United States. The article focuses on this dilemma and how a shift in power to the Democratic Progressive Party is affecting Taiwan's choice between placing limitations on its global economic power or risking being cut off from U.S. technology and losing U.S. security assurances. In order to address this challenge properly, Taiwan will need to reassess its fundamental economic and security interests.  相似文献   

17.
Nonparametric control charts are useful in statistical process control when there is a lack of or limited knowledge about the underlying process distribution, especially when the process measurement is multivariate. This article develops a new multivariate self‐starting methodology for monitoring location parameters. It is based on adapting the multivariate spatial rank to on‐line sequential monitoring. The weighted version of the rank‐based test is used to formulate the charting statistic by incorporating the exponentially weighted moving average control scheme. It is robust to non‐normally distributed data, easy to construct, fast to compute and also very efficient in detecting multivariate process shifts, especially small or moderate shifts which occur when the process distribution is heavy‐tailed or skewed. As it avoids the need for a lengthy data‐gathering step before charting and it does not require knowledge of the underlying distribution, the proposed control chart is particularly useful in start‐up or short‐run situations. A real‐data example from white wine production processes shows that it performs quite well. © 2012 Wiley Periodicals, Inc. Naval Research Logistics 59: 91–110, 2012  相似文献   

18.
在II型混合截尾样本下,得到了广义逆指数分布未知参数的最大似然估计。利用最大似然估计的渐近正态性构造了参数的渐近置信区间,运用Lindley's逼近方法和TierneyKadane's逼近方法计算出了参数的Bayes估计。最后,运用Monte-Carlo方法对上述估计方法结果作了模拟比较。  相似文献   

19.
电能逆变器是军用电源系统的核心,为提高军用电源输出电压电力谐波分析效果,提出改进型希尔伯特-黄变换(HHT)方法的检测分析方法,并设计基于LabVIEW平台的电压谐波检测和分析装置。在研究双闭环控制策略的基础上,针对模态混叠问题,先使用数字滤波器对输出电压信号进行预处理,再进行改进HHT分析,得到输出电压谐波分量的幅频分布,并利用MATLAB对军用电源逆变器模型进行仿真。结果表明该方法可以对军用电源变换器输出谐波分量实时检测和分析,计算精度高,分析效果好,为下一步的谐波抑制方法研究提供有力支持。  相似文献   

20.
CONTRIBUTORS     
ABSTRACT

Narratives about Brazil's nuclear program are distorted by supporters and critics alike. In Brazil, the national nuclear infrastructure is undergoing a period of expansion, with plans to build new nuclear power plants and industrial-scale fuel production facilities. While Brazil's leaders herald the nuclear sector as a triumph for indigenous science and technology, foreigners view the nuclear program as a dangerous legacy of the military regime. This discrepancy becomes even more apparent in discussions about the ongoing construction of Brazil's first nuclear powered submarine. Brazil's military touts the submarine as a symbol of political status, economic growth, and military might. But from abroad, the military's involvement in nuclear development is considered unnecessary, worrisome, and even irresponsible. These narratives—often incomplete or selective—have polarized discussions about Brazil's nuclear submarine program and caused considerable political antagonism during safeguards negotiations. This article works to dispel myths, highlight legitimate concerns, and explain historical perspectives that shed light on some difficulties that can be anticipated in future negotiations.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号