首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   210篇
  免费   42篇
  252篇
  2021年   2篇
  2020年   1篇
  2019年   6篇
  2018年   5篇
  2017年   8篇
  2016年   13篇
  2015年   16篇
  2014年   10篇
  2013年   73篇
  2012年   9篇
  2011年   7篇
  2010年   5篇
  2009年   7篇
  2008年   10篇
  2007年   11篇
  2006年   7篇
  2005年   11篇
  2004年   7篇
  2003年   11篇
  2002年   11篇
  2001年   6篇
  2000年   5篇
  1999年   6篇
  1996年   3篇
  1993年   2篇
排序方式: 共有252条查询结果,搜索用时 0 毫秒
1.
As a complex system with multiple components usually deteriorates with age, preventive maintenance (PM) is often performed to keep the system functioning in a good state to prolong its effective age. In this study, a nonhomogeneous Poisson process with a power law failure intensity is used to describe the deterioration of a repairable system, and the optimal nonperiodic PM schedule can be determined to minimize the expected total cost per unit time. However, since the determination of such optimal PM policies may involve numerous uncertainties, which typically make the analyses difficult to perform because of the scarcity of data, a Bayesian decision model, which utilizes all available information effectively, is also proposed for determining the optimal PM strategies. A numerical example with a real failure data set is used to illustrate the effectiveness of the proposed approach. The results show that the optimal schedules derived by Bayesian approach are relatively more conservative than that for non‐Bayesian approach because of the uncertainty of the intensity function, and if the intensity function are updated using the collected data set, which indicates more severe deterioration than the prior belief, replacing the entire system instead of frequent PM activities before serious deterioration is suggested. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   
2.
We state a balancing problem for mixed model assembly lines with a paced moving conveyor as: Given the daily assembling sequence of the models, the tasks of each model, the precedence relations among the tasks, and the operations parameters of the assembly line, assign the tasks of the models to the workstations so as to minimize the total overload time. Several characteristics of the problem are investigated. A line‐balancing heuristic is proposed based on a lower bound of the total overload time. A practical procedure is provided for estimating the deviation of any given line‐balance solution from the theoretical optimum. Numerical examples are given to illustrate the methodology. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   
3.
Extending Sastry's result on the uncapacitated two‐commodity network design problem, we completely characterize the optimal solution of the uncapacitated K‐commodity network design problem with zero flow costs for the case when K = 3. By solving a set of shortest‐path problems on related graphs, we show that the optimal solutions can be found in O(n3) time when K = 3, where n is the number of nodes in the network. The algorithm depends on identifying a list of “basic patterns”; the number of basic patterns grows exponentially with K. We also show that the uncapacitated K‐commodity network design problem can be solved in O(n3) time for general K if K is fixed; otherwise, the time for solving the problem is exponential. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   
4.
We consider the problem of scheduling orders on identical machines in parallel. Each order consists of one or more individual jobs. A job that belongs to an order can be processed by any one of the machines. Multiple machines can process the jobs of an order concurrently. No setup is required if a machine switches over from one job to another. Each order is released at time zero and has a positive weight. Preemptions are not allowed. The completion time of an order is the time at which all jobs of that order have been completed. The objective is to minimize the total weighted completion time of the orders. The problem is NP‐hard for any fixed number (≥2) of machines. Because of this, we focus our attention on two classes of heuristics, which we refer to as sequential two‐phase heuristics and dynamic two‐phase heuristics. We perform a worst case analysis as well as an empirical analysis of nine heuristics. Our analyses enable us to rank these heuristics according to their effectiveness, taking solution quality as well as running time into account. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   
5.
In the field of nanofabrication, engineers often face unique challenges in resource‐limited experimental budgets, the sensitive nature of process behavior with respect to controllable variables, and highly demanding tolerance requirements. To effectively overcome these challenges, this article proposes a methodology for a sequential design of experiments through batches of experimental runs, aptly named Layers of Experiments with Adaptive Combined Design (LoE/ACD). In higher layers, where process behavior is less understood, experimental regions cover more design space and data points are more spread out. In lower layers, experimental regions are more focused to improve understanding of process sensitivities in a local, data‐rich environment. The experimental design is a combination of a space‐filling and an optimal design with a tuning parameter that is dependent on the amount of information accumulated over the various layers. The proposed LoE/ACD method is applied to optimize a carbon dioxide (epet‐CO2) assisted deposition process for fabricating silver nanoparticles with pressure and temperature variables. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 127–142, 2015  相似文献   
6.
We consider the problem of scheduling a set of n jobs on a single batch machine, where several jobs can be processed simultaneously. Each job j has a processing time pj and a size sj. All jobs are available for processing at time 0. The batch machine has a capacity D. Several jobs can be batched together and processed simultaneously, provided that the total size of the jobs in the batch does not exceed D. The processing time of a batch is the largest processing time among all jobs in the batch. There is a single vehicle available for delivery of the finished products to the customer, and the vehicle has capacity K. We assume that K = rD, where and r is an integer. The travel time of the vehicle is T; that is, T is the time from the manufacturer to the customer. Our goal is to find a schedule of the jobs and a delivery plan so that the service span is minimized, where the service span is the time that the last job is delivered to the customer. We show that if the jobs have identical sizes, then we can find a schedule and delivery plan in time such that the service span is minimum. If the jobs have identical processing times, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most 11/9 times the optimal service span. When the jobs have arbitrary processing times and arbitrary sizes, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most twice the optimal service span. We also derive upper bounds of the absolute worst‐case ratios in both cases. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 470–482, 2015  相似文献   
7.
基于ABAQUS有限元软件,采用主从接触算法模拟桩-土相互作用、修正剑桥模型作为土体本构模型,通过在桩顶施加竖向位移荷载以及合适的网格划分技术建立了较为符合压入管桩压桩实际的有限元模型。利用得到的有限元模型模拟了压入管桩压桩产生的挤土位移场,对不同泊松比时压入管桩单桩挤土位移场进行了对比分析。结果表明:不同泊松比时竖向和水平挤土位移场沿深度方向和径向的分布规律趋于一致;土体泊松比的变化会对压入管桩压桩产生的竖向和水平挤土位移场产生较大影响;泊松比越大,压桩产生的竖向和水平挤土位移越大。  相似文献   
8.
为了找到传感器稳定性最好时的脉冲周期,对传感器检测系统进行优化,实验研究了传感器检测饮用水中大肠杆菌时,脉冲周期对传感器稳定性的影响。传感器的构成属于三电极系统,采用常规脉冲伏安法进行检测。结果显示:脉冲周期为20,40,80 ms时传感器稳定性较好,基本不会影响检测结果;脉冲周期为100 ms时稳定性很差,对检测结果有较大影响。实验表明,选择合适的脉冲周期,加以硬件和软件补偿,可以使传感器获得较好的稳定性。  相似文献   
9.
We study a setting with a single type of resource and with several players, each associated with a single resource (of this type). Unavailability of these resources comes unexpectedly and with player‐specific costs. Players can cooperate by reallocating the available resources to the ones that need the resources most and let those who suffer the least absorb all the costs. We address the cost savings allocation problem with concepts of cooperative game theory. In particular, we formulate a probabilistic resource pooling game and study them on various properties. We show that these games are not necessarily convex, do have non‐empty cores, and are totally balanced. The latter two are shown via an interesting relationship with Böhm‐Bawerk horse market games. Next, we present an intuitive class of allocation rules for which the resulting allocations are core members and study an allocation rule within this class of allocation rules with an appealing fairness property. Finally, we show that our results can be applied to a spare parts pooling situation.  相似文献   
10.
Consider a threshold control policy for an imperfect production system with only a work center handling both regular and rework jobs. An imperfect production system studied here, generates defect jobs by factors other than machine failures. A threshold control or (ω, s) policy sets the guideline for a work center to switch between regular and rework jobs. A production cycle begins with loading and processing of several batches of regular jobs with a lot size equal to s. The outcome of each completed regular job is an independent Bernoulli trial with three possibilities: good, rework, or scrap. Once the work center accumulates more than a threshold ω of rework jobs, it finishes the last batch of regular jobs and switches to rework jobs. The objective of this research is to find a threshold ω and a lot size s that maximize the average long‐term profit. The ultimate goal is to construct a simple algorithm to search for ω and s that can be implemented directly in production management systems, as a result of this work. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 273–301, 1999  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号