首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   185篇
  免费   39篇
  2021年   1篇
  2019年   5篇
  2018年   2篇
  2017年   5篇
  2016年   10篇
  2015年   14篇
  2014年   8篇
  2013年   62篇
  2012年   9篇
  2011年   8篇
  2010年   4篇
  2009年   7篇
  2008年   9篇
  2007年   11篇
  2006年   7篇
  2005年   11篇
  2004年   7篇
  2003年   11篇
  2002年   10篇
  2001年   6篇
  2000年   5篇
  1999年   6篇
  1993年   1篇
  1992年   1篇
  1988年   1篇
  1985年   1篇
  1983年   1篇
  1980年   1篇
排序方式: 共有224条查询结果,搜索用时 812 毫秒
211.
We consider three network disconnection problems in a centralized network where a source node provides service to the other nodes, called demand nodes. In network disconnection problems, each demand node gets a certain benefit when connected to a source node and a network attacker destroys edges to prevent demand nodes from achieving benefits. As destroying edges incurs expenses, an attacker considers the following three different strategies. The first is to maximize the sum of benefits of the disconnected nodes while keeping the total edge destruction cost no more than a given budget. The second is to minimize the total destruction cost needed to make a certain amount of benefits not accomplished. The last is to minimize the ratio of the total destruction cost to the benefits not accomplished. In this paper, we develop exact algorithms to solve the above three problems. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   
212.
We consider a dynamic lot‐sizing model with production time windows where each of n demands has earliest and latest production due dates and it must be satisfied during the given time window. For the case of nonspeculative cost structure, an O(nlogn) time procedure is developed and it is shown to run in O(n) when demands come in the order of latest production due dates. When the cost structure is somewhat general fixed plus linear that allows speculative motive, an optimal procedure with O(T4) is proposed where T is the length of a planning horizon. Finally, for the most general concave production cost structure, an optimal procedure with O(T5) is designed. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   
213.
We formulate exact expressions for the expected values of selected estimators of the variance parameter (that is, the sum of covariances at all lags) of a steady‐state simulation output process. Given in terms of the autocovariance function of the process, these expressions are derived for variance estimators based on the simulation analysis methods of nonoverlapping batch means, overlapping batch means, and standardized time series. Comparing estimator performance in a first‐order autoregressive process and the M/M/1 queue‐waiting‐time process, we find that certain standardized time series estimators outperform their competitors as the sample size becomes large. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   
214.
We consider a manufacturer (i.e., a capacitated supplier) that produces to stock and has two classes of customers. The primary customer places orders at regular intervals of time for a random quantity, while the secondary customers request a single item at random times. At a predetermined time the manufacturer receives advance demand information regarding the order size of the primary customer. If the manufacturer is not able to fill the primary customer's demand, there is a penalty. On the other hand, serving the secondary customers results in additional profit; however, the manufacturer can refuse to serve the secondary customers in order to reserve inventory for the primary customer. We characterize the manufacturer's optimal production and stock reservation policies that maximize the manufacturer's discounted profit and the average profit per unit time. We show that these policies are threshold‐type policies, and these thresholds are monotone with respect to the primary customer's order size. Using a numerical study we provide insights into how the value of information is affected by the relative demand size of the primary and secondary customers. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   
215.
We consider the problem of scheduling n independent and simultaneously available jobs without preemption on a single machine, where the machine has a fixed maintenance activity. The objective is to find the optimal job sequence to minimize the total amount of late work, where the late work of a job is the amount of processing of the job that is performed after its due date. We first discuss the approximability of the problem. We then develop two pseudo‐polynomial dynamic programming algorithms and a fully polynomial‐time approximation scheme for the problem. Finally, we conduct extensive numerical studies to evaluate the performance of the proposed algorithms. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 172–183, 2016  相似文献   
216.
We consider the problem of determining the capacity to assign to each arc in a given network, subject to uncertainty in the supply and/or demand of each node. This design problem underlies many real‐world applications, such as the design of power transmission and telecommunications networks. We first consider the case where a set of supply/demand scenarios are provided, and we must determine the minimum‐cost set of arc capacities such that a feasible flow exists for each scenario. We briefly review existing theoretical approaches to solving this problem and explore implementation strategies to reduce run times. With this as a foundation, our primary focus is on a chance‐constrained version of the problem in which α% of the scenarios must be feasible under the chosen capacity, where α is a user‐defined parameter and the specific scenarios to be satisfied are not predetermined. We describe an algorithm which utilizes a separation routine for identifying violated cut‐sets which can solve the problem to optimality, and we present computational results. We also present a novel greedy algorithm, our primary contribution, which can be used to solve for a high quality heuristic solution. We present computational analysis to evaluate the performance of our proposed approaches. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 236–246, 2016  相似文献   
217.
The warehouse problem with deterministic production cost, selling prices, and demand was introduced in the 1950s and there is a renewed interest recently due to its applications in energy storage and arbitrage. In this paper, we consider two extensions of the warehouse problem and develop efficient computational algorithms for finding their optimal solutions. First, we consider a model where the firm can invest in capacity expansion projects for the warehouse while simultaneously making production and sales decisions in each period. We show that this problem can be solved with a computational complexity that is linear in the product of the length of the planning horizon and the number of capacity expansion projects. We then consider a problem in which the firm can invest to improve production cost efficiency while simultaneously making production and sales decisions in each period. The resulting optimization problem is non‐convex with integer decision variables. We show that, under some mild conditions on the cost data, the problem can be solved in linear computational time. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 367–373, 2016  相似文献   
218.
In order‐quantity reorder‐point formulations for inventory items where backordering is allowed, some of the more common ways to prevent excessive stockouts in an optimal solution are to impose either a cost per unit short, a cost per stockout occasion, or a target fill rate. We show that these popular formulations, both exact and approximate, can become “degenerate” even with quite plausible parameters. By degeneracy we mean any situation in which the formulation either cannot be solved, leads to nonsensical “optimal” solutions, or becomes equivalent to something substantially simpler. We explain the reasons for the degeneracies, yielding new insight into these models, and we provide practical advice for inventory managers. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 686–705, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10037  相似文献   
219.
Estimation of warranty costs, in the event of product failure within the warranty period, is of importance to the manufacturer. Costs associated with replacement or repair of the product are usually drawn from a warranty reserve fund created by the manufacturer. Considering a stochastic sales process, first and second moments (and thereby the variance) are derived for the manufacturer's total discounted warranty cost of a single sale for single‐component items under four different warranty policies from a manufacturer's point of view. These servicing strategies represent a renewable free‐replacement, nonrenewable free‐replacement, renewable pro‐rata, and a nonrenewable minimal‐repair warranty plans. The results are extended to determine the mean and variance of total discounted warranty costs for the total sales over the life cycle of the product. Furthermore, using a normal approximation, warranty reserves necessary for a certain protection level, so that reserves are not completely depleted, are found. Results and their managerial implications are studied through an extensive example. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 499–513, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10023  相似文献   
220.
Various indices of component importance with respect to system reliability have been proposed. The most popular one is the Birnbaum importance. In particular, a special case called uniform Birnbaum importance in which all components have the same reliability p has been widely studied for the consecutive‐k system. Since it is not easy to compare uniform Birnbaum importance, the literature has looked into the case p = ½, p → 1, or p ≥ ½. In this paper, we look into the case p → 0 to complete the spectrum of examining Birnbaum importance over the whole range of p. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 159–166, 2002; DOI 10.1002/nav.10001  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号