首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   14篇
  免费   0篇
  2013年   3篇
  2011年   1篇
  2007年   1篇
  1997年   1篇
  1992年   1篇
  1989年   1篇
  1988年   1篇
  1987年   1篇
  1986年   1篇
  1985年   1篇
  1983年   1篇
  1980年   1篇
排序方式: 共有14条查询结果,搜索用时 62 毫秒
11.
In this article we extend the work of Mehrez and Stulman [5] on the expected value of perfect information (EVPI) to the expected value of sample information (EVSI) for a class of economic problems dealing with the decision to reject or accept an investment project. It is shown that shifting the mean of the underlying a priori distribution of X, the project's monetary value from zero in either direction will decrease the associated EVSI of Y, the random sampled information. A theorem is then presented which gives an upper bound on the EVSI over all distributions of Y, as well as the structure of the posterior mean E[X|Y] for which this upper bound is achieved. Finally, the case where E[X|Y] is linear in Y is discussed and its performance compared with that of the optimal case.  相似文献   
12.
13.
We study the quadratic bottleneck problem (QBP) which generalizes several well‐studied optimization problems. A weak duality theorem is introduced along with a general purpose algorithm to solve QBP. An example is given which illustrates duality gap in the weak duality theorem. It is shown that the special case of QBP where feasible solutions are subsets of a finite set having the same cardinality is NP‐hard. Likewise the quadratic bottleneck spanning tree problem (QBST) is shown to be NP‐hard on a bipartite graph even if the cost function takes 0–1 values only. Two lower bounds for QBST are derived and compared. Efficient heuristic algorithms are presented for QBST along with computational results. When the cost function is decomposable, we show that QBP is solvable in polynomial time whenever an associated linear bottleneck problem can be solved in polynomial time. As a consequence, QBP with feasible solutions form spanning trees, s‐t paths, matchings, etc., of a graph are solvable in polynomial time with a decomposable cost function. We also show that QBP can be formulated as a quadratic minsum problem and establish some asymptotic results. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   
14.
This article studies a maintenance problem that is applicable for multidivision organizations on lessee-lessor relationships. It is assumed that the parties sign a contract for a fixed time period. Within the period, the lessor is allowed to use the equipment supplied by the lessee. The availability of the equipment that may suffer from breakdown depends on the preventive maintenance policy adopted by the lessor. The properties of this policy as well as other features of the problem are analyzed using a one-period model that takes into account the economic value of the contract as perceived by the lessor and the lessee. The optimal contracting arrangements are analyzed from the perspective of efficient risk sharing and incentive provisions.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号