首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   27篇
  免费   3篇
  30篇
  2019年   1篇
  2015年   3篇
  2013年   17篇
  2011年   1篇
  2008年   1篇
  2007年   2篇
  2006年   1篇
  2000年   1篇
  1998年   1篇
  1997年   1篇
  1996年   1篇
排序方式: 共有30条查询结果,搜索用时 0 毫秒
11.
This paper models and estimates Greek defence spending over the 1950–1989 period. It employs the Stone‐Geary welfare function and estimates levels of defence expenditures by the Engle‐Granger two‐step procedure. The Dickey‐Fuller test regression for cointegration is specified in terms of the significance of additional augmentations. The Deaton‐Muellbauer functional form is then employed and an estimating equation for the expenditure share of defence is derived. This specification is compared with the levels equation through a number of non‐nested tests involving model transformation.  相似文献   
12.

With the collapse of bipolarity and the end of the East-West armaments race, defence budgets have shrunk and military expenditures across many countries have fallen, opening-up the prospect of potential beneficial economic spin-offs. In the case of Greece, a country with a higher than average defence burden, military spending has not exhibited similar downward trends as it has done in other members of NATO and the European Union. The paper, using a Computable General Equilibrium model, estimates through simulations the effects on the Greek economy had reductions in current defence spending been equal to the NATO average. The results from the CGE estimations suggest that a shift of expenditure from defence into non-defence public spending would have an appreciable beneficial impact.  相似文献   
13.
We consider the problem of maximizing the number of on‐time jobs on two uniform parallel machines. We show that a straightforward extension of an algorithm developed for the simpler two identical parallel machines problem yields a heuristic with a worst‐case ratio bound of at least . We then show that the infusion of a “look ahead” feature into the aforementioned algorithm results in a heuristic with the tight worst‐case ratio bound of , which, to our knowledge, is the tightest worst‐case ratio bound available for the problem. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   
14.
It is generally recognized that the first model involving job scheduling was presented by Selmer Johnson and published in the inaugural issue of Naval Research Logistics Quarterly (NRLQ) in 1954. NRLQ also published another seminal scheduling paper by Wayne E. Smith a short time later. In the present paper, we discuss the contribution of NRLQ and the role of the Office of Naval Research in the development of the scheduling literature during the first decade (1954–1963). We also provide a critical analysis of the papers by Johnson and Smith. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 335–344, 2015  相似文献   
15.
We derive sufficient conditions which, when satisfied, guarantee that an optimal solution for a single‐machine scheduling problem is also optimal for the corresponding proportionate flow shop scheduling problem. We then utilize these sufficient conditions to show the solvability in polynomial time of numerous proportionate flow shop scheduling problems with fixed job processing times, position‐dependent job processing times, controllable job processing times, and also problems with job rejection. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 595–603, 2015  相似文献   
16.
We investigate the solvability of two single‐machine scheduling problems when the objective is to identify among all job subsets with cardinality k,1≤kn, the one that has the minimum objective function value. For the single‐machine minimum maximum lateness problem, we conclude that the problem is solvable in O(n2) time using the proposed REMOVE algorithm. This algorithm can also be used as an alternative to Moore's algorithm to solve the minimum number of tardy jobs problem by actually solving the hierarchical problem in which the objective is to minimize the maximum lateness subject to the minimum number of tardy jobs. We then show that the REMOVE algorithm cannot be used to solve the general case of the single‐machine total‐weighted completion time problem; we derive sufficient conditions among the job parameters so that the total weighted completion time problem becomes solvable in O(n2) time. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 60: 449–453, 2013  相似文献   
17.
We show that the linear objective function of a search problem can be generalized to a power function and/or a logarithmic function and still be minimized by an index priority rule. We prove our result by solving the differential equation resulting from the required invariance condition, therefore, we also prove that any other generalization of this linear objective function will not lead to an index priority rule. We also demonstrate the full equivalence between two related search problems in the sense that a solution to either one can be used to solve the other one and vice versa. Finally, we show that the linear function is the only function leading to an index priority rule for the single‐machine makespan minimization problem with deteriorating jobs and an additive job deterioration function. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   
18.
In interval scheduling, not only the processing times of the jobs but also their starting times are given. This article surveys the area of interval scheduling and presents proofs of results that have been known within the community for some time. We first review the complexity and approximability of different variants of interval scheduling problems. Next, we motivate the relevance of interval scheduling problems by providing an overview of applications that have appeared in literature. Finally, we focus on algorithmic results for two important variants of interval scheduling problems. In one variant we deal with nonidentical machines: instead of each machine being continuously available, there is a given interval for each machine in which it is available. In another variant, the machines are continuously available but they are ordered, and each job has a given “maximal” machine on which it can be processed. We investigate the complexity of these problems and describe algorithms for their solution. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   
19.
20.
We consider two‐stage and three‐stage flexible flow shops with parallel machines in each stage and the minimum makespan objective. We develop linear time algorithms for these problems with absolute worst‐case bounds either sharper or no worse than the currently available ones and we accomplish this with lower complexity algorithms. We also demonstrate the asymptotic optimality of a class of algorithms for multistage flexible flow shop problems (which includes the proposed algorithms) under certain probabilistic assumptions on the job processing times. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 259–268, 2000  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号