首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   16篇
  免费   0篇
  2018年   1篇
  2017年   3篇
  2013年   4篇
  2006年   1篇
  1995年   1篇
  1993年   1篇
  1988年   1篇
  1984年   1篇
  1978年   1篇
  1974年   1篇
  1972年   1篇
排序方式: 共有16条查询结果,搜索用时 15 毫秒
11.
12.
13.
In this article we present an approach to determine the initially unspecified weights in an additive measurable multiattribute value function. We formulate and solve a series of nonlinear programming problems which (1) incorporate whatever partial information concerning the attribute weights or overall relative value of alternatives the decision maker chooses to provide, yet (2) yield a specific set of weights as a result. Although each formulation is rather easily solved using the nonlinear programming software GINO (general interactive optimizer), solutions in closed form dependent on a single parameter are also provided for a number of these problems.  相似文献   
14.
We consider the stochastic linear knapsack problem in which costs are known with certainty but returns are independent, normally distributed random variables. The objective is to maximize the probability that the overall return equals or exceeds a specified target value. A previously proposed preference order dynamic programming-based algorithm has been shown to be potentially suboptimal. We offer an alternative hybrid DP/branch-and-bound algorithm that both guarantees optimality and significantly outperforms generating the set of Pareto optimal returns.© 1993 John Wiley & Sons, Inc.  相似文献   
15.
This paper addresses a two‐machine open shop scheduling problem, in which the machines are not continuously available for processing. The processing of an operation affected by a non‐availability interval can be interrupted and resumed later. The objective is to minimize the makespan. We present two polynomial‐time approximation schemes, one of which handles the problem with one non‐availability interval on each machine and the other for the problem with several non‐availability intervals on one of the machines. Problems with a more general structure of the non‐availability intervals are not approximable in polynomial time within a constant factor, unless . © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   
16.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号