首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   226篇
  免费   44篇
  国内免费   1篇
  2023年   1篇
  2022年   4篇
  2021年   4篇
  2020年   2篇
  2019年   5篇
  2018年   2篇
  2017年   5篇
  2016年   10篇
  2015年   14篇
  2014年   10篇
  2013年   67篇
  2012年   17篇
  2011年   8篇
  2010年   7篇
  2009年   11篇
  2008年   15篇
  2007年   15篇
  2006年   10篇
  2005年   13篇
  2004年   9篇
  2003年   12篇
  2002年   11篇
  2001年   6篇
  2000年   5篇
  1999年   6篇
  1998年   1篇
  1993年   1篇
排序方式: 共有271条查询结果,搜索用时 15 毫秒
21.
Extending Sastry's result on the uncapacitated two‐commodity network design problem, we completely characterize the optimal solution of the uncapacitated K‐commodity network design problem with zero flow costs for the case when K = 3. By solving a set of shortest‐path problems on related graphs, we show that the optimal solutions can be found in O(n3) time when K = 3, where n is the number of nodes in the network. The algorithm depends on identifying a list of “basic patterns”; the number of basic patterns grows exponentially with K. We also show that the uncapacitated K‐commodity network design problem can be solved in O(n3) time for general K if K is fixed; otherwise, the time for solving the problem is exponential. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   
22.
文章介绍了一种专门为网络应用设计的宽带语音和音频编解码器SILK的主要特点和编解码基本原理。SILK编解码器在6 kbit/s~40 kbit/s速率上对8 kHz、12 kHz、16 kHz、24 kHz采样的语音和音频信号进行宽带和超宽带编解码;通过控制编码比特率、包速率以及采用抗丢包和DTX等功能使得SILK编解码器更适合于网络应用;SILK编码器可以采用不同的复杂度等级来充分利用处理器资源;并且编码器的所有这些功能特性都可以逐帧进行调整。  相似文献   
23.
In this paper, we extend the inventory lot‐size models to allow for inflation and fluctuating demand (which is more general than constant, increasing, decreasing, and log‐concave demand patterns). We prove that the optimal replenishment schedule not only exists but is also unique. Furthermore, we show that the total cost associated with the inventory system is a convex function of the number of replenishments. Hence, the search for the optimal number of replenishments is simplified to finding a local minimum. Finally, several numerical examples are provided to illustrate the results. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 144–158, 2001  相似文献   
24.
This paper studies a queueing system with a Markov arrival process with marked arrivals and PH‐distribution service times for each type of customer. Customers (regardless of their types) are served on a mixed first‐come‐first‐served (FCFS) and last‐come‐first‐served (LCFS) nonpreemptive basis. That is, when the queue length is N (a positive integer) or less, customers are served on an FCFS basis; otherwise, customers are served on an LCFS basis. The focus is on the stationary distribution of queue strings, busy periods, and waiting times of individual types of customers. A computational approach is developed for computing the stationary distribution of queue strings, the mean of busy period, and the means and variances of waiting times. The relationship between these performance measures and the threshold number N is analyzed in depth numerically. It is found that the variance of the virtual (actual) waiting time of an arbitrary customer can be reduced by increasing N. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 399–421, 2000  相似文献   
25.
面向在轨服务的空间电磁对接技术具有广阔应用前景,但其姿态控制设计存在强非线性及耦合性问题需要解决,电磁/地磁力矩干扰姿态系统稳定。针对绝对/相对姿态动力学模型,分别采用反馈线性化以及鲁棒H∞控制综合方法、扩张状态观测器以及鲁棒H∞控制综合方法设计姿态控制系统。理论研究、对比分析两种控制策略特点,并通过仿真验证了所设计控制系统的可行性。理论研究及仿真结果表明:两种控制策略都是可行的,对模型参数变化及外界干扰具有较强鲁棒性;基于相对姿态动力学的综合控制设计方法能有效利用航天器相对姿态测量信息,且无需额外设计状态估计器。  相似文献   
26.
Consider a threshold control policy for an imperfect production system with only a work center handling both regular and rework jobs. An imperfect production system studied here, generates defect jobs by factors other than machine failures. A threshold control or (ω, s) policy sets the guideline for a work center to switch between regular and rework jobs. A production cycle begins with loading and processing of several batches of regular jobs with a lot size equal to s. The outcome of each completed regular job is an independent Bernoulli trial with three possibilities: good, rework, or scrap. Once the work center accumulates more than a threshold ω of rework jobs, it finishes the last batch of regular jobs and switches to rework jobs. The objective of this research is to find a threshold ω and a lot size s that maximize the average long‐term profit. The ultimate goal is to construct a simple algorithm to search for ω and s that can be implemented directly in production management systems, as a result of this work. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 273–301, 1999  相似文献   
27.
The coordination of production, supply, and distribution is an important issue in logistics and operations management. This paper develops and analyzes a single‐machine scheduling model that incorporates the scheduling of jobs and the pickup and delivery arrangements of the materials and finished jobs. In this model, there is a capacitated pickup and delivery vehicle that travels between the machine and the storage area, and the objective is to minimize the makespan of the schedule. The problem is strongly NP‐hard in general but is solvable in polynomial time when the job processing sequence is predetermined. An efficient heuristic is developed for the general problem. The effectiveness of the heuristic is studied both analytically and computationally. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   
28.
An area defense consists of several groups that act independently, i.e., do not communicate with each other. Each group has a fixed number of defenders and a controller that allocates these defenders optimally against the individual attackers comprising an attack. We analyze the effectiveness of this partially coordinated defense against a simultaneous attack of known size in which all attackers are considered to be equally lethal. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   
29.
We consider the problem of finding the Kth shortest path for a time‐schedule network, where each node in the network has a list of prespecified departure times, and departure from the node can take place only at one of these departure times. We develop a polynomial time algorithm independent of K for finding the Kth shortest path. The proposed algorithm constructs a map structure at each node in the network, using which we can directly find the Kth shortest path without having to enumerate the first K − 1 paths. Since the same map structure is used for different K values, it is not necessary to reconstruct the table for additional paths. Consequently, the algorithm is suitable for directly finding multiple shortest paths in the same network. Furthermore, the algorithm is modified slightly for enumerating the first K shortest paths and is shown to have the lowest possible time complexity under a condition that holds for most practical networks. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   
30.
We consider a make‐to‐order production–distribution system with one supplier and one or more customers. A set of orders with due dates needs to be processed by the supplier and delivered to the customers upon completion. The supplier can process one order at a time without preemption. Each customer is at a distinct location and only orders from the same customer can be batched together for delivery. Each delivery shipment has a capacity limit and incurs a distribution cost. The problem is to find a joint schedule of order processing at the supplier and order delivery from the supplier to the customers that optimizes an objective function involving the maximum delivery tardiness and the total distribution cost. We first study the solvability of various cases of the problem by either providing an efficient algorithm or proving the intractability of the problem. We then develop a fast heuristic for the general problem. We show that the heuristic is asymptotically optimal as the number of orders goes to infinity. We also evaluate the performance of the heuristic computationally by using lower bounds obtained by a column generation approach. Our results indicate that the heuristic is capable of generating near optimal solutions quickly. Finally, we study the value of production–distribution integration by comparing our integrated approach with two sequential approaches where scheduling decisions for order processing are made first, followed by order delivery decisions, with no or only partial integration of the two decisions. We show that in many cases, the integrated approach performs significantly better than the sequential approaches. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号