71.
We deal with the problem of minimizing makespan on a single batch processing machine. In this problem, each job has both processing time and size (capacity requirement). The batch processing machine can process a number of jobs simultaneously as long as the total size of these jobs being processed does not exceed the machine capacity. The processing time of a batch is just the processing time of the longest job in the batch. An approximation algorithm with worst‐case ratio 3/2 is given for the version where the processing times of large jobs (with sizes greater than 1/2) are not less than those of small jobs (with sizes not greater than 1/2). This result is the best possible unless P = NP. For the general case, we propose an approximation algorithm with worst‐case ratio 7/4. A number of heuristics by Uzosy are also analyzed and compared. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 226–240, 2001 相似文献
72.
Ebru K. Bish Thin‐Yin Leong Chung‐Lun Li Jonathan W. C. Ng David Simchi‐Levi 《海军后勤学研究》2001,48(5):363-385
We consider a container terminal discharging containers from a ship and locating them in the terminal yard. Each container has a number of potential locations in the yard where it can be stored. Containers are moved from the ship to the yard using a fleet of vehicles, each of which can carry one container at a time. The problem is to assign each container to a yard location and dispatch vehicles to the containers so as to minimize the time it takes to download all the containers from the ship. We show that the problem is NP‐hard and develop a heuristic algorithm based on formulating the problem as an assignment problem. The effectiveness of the heuristic is analyzed from both worst‐case and computational points of view. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 363–385, 2001 相似文献
73.
We consider scheduling problems involving two agents (agents A and B), each having a set of jobs that compete for the use of a common machine to process their respective jobs. The due dates of the A‐jobs are decision variables, which are determined by using the common (CON) or slack (SLK) due date assignment methods. Each agent wants to minimize a certain performance criterion depending on the completion times of its jobs only. Under each due date assignment method, the criterion of agent A is always the same, namely an integrated criterion consisting of the due date assignment cost and the weighted number of tardy jobs. Several different criteria are considered for agent B, including the maxima of regular functions (associated with each job), the total (weighted) completion time, and the weighted number of tardy jobs. The overall objective is to minimize the performance criterion of agent A, while keeping the objective value of agent B no greater than a given limit. We analyze the computational complexity, and devise polynomial or pseudo‐polynomial dynamic programming algorithms for the considered problems. We also convert, if viable, any of the devised pseudopolynomial dynamic programming algorithms into a fully polynomial‐time approximation scheme. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 416–429, 2016 相似文献
74.
Column generation for stochastic green telecommunication network planning with switchable base stations
下载免费PDF全文
![点击此处可从《海军后勤学研究》网站下载免费的PDF全文](/ch/ext_images/free.gif)
We present the green telecommunication network planning problem with switchable base stations, where the location and configuration of the base stations are optimized, while taking into account uncertainty and variability of demand. The problem is formulated as a two‐stage stochastic program under demand uncertainty with integers in both stages. Since solving the presented problem is computationally challenging, we develop the corresponding Dantzig‐Wolfe reformulation and propose a solution approach based on column generation. Comprehensive computational results are provided for instances of varying characteristics. The results show that the joint location and dynamic switching of base stations leads to significant savings in terms of energy cost. Up to 30% reduction in power consumption cost is achieved while still serving all users. In certain cases, allowing dynamic configurations leads to more installed base stations and higher user coverage, while having lower total energy consumption. The Dantzig‐Wolfe reformulation provides solutions with a tight LP‐gap eliminating the need for a full branch‐and‐price scheme. Furthermore, the proposed column generation solution approach is computationally efficient and outperforms CPLEX on the majority of the tested instances. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 351–366, 2016 相似文献
75.
In this article, we study a two‐level lot‐sizing problem with supplier selection (LSS), which is an NP‐hard problem arising in different production planning and supply chain management applications. After presenting various formulations for LSS, and computationally comparing their strengths, we explore the polyhedral structure of one of these formulations. For this formulation, we derive several families of strong valid inequalities, and provide conditions under which they are facet‐defining. We show numerically that incorporating these valid inequalities within a branch‐and‐cut framework leads to significant improvements in computation. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 647–666, 2017 相似文献
76.
We consider the problem of finding the system with the best primary performance measure among a finite number of simulated systems in the presence of a stochastic constraint on a single real‐valued secondary performance measure. Solving this problem requires the identification and removal from consideration of infeasible systems (Phase I) and of systems whose primary performance measure is dominated by that of other feasible systems (Phase II). We use indifference zones in both phases and consider two approaches, namely, carrying out Phases I and II sequentially and carrying out Phases I and II simultaneously, and we provide specific example procedures of each type. We present theoretical results guaranteeing that our approaches (general and specific, sequential and simultaneous) yield the best system with at least a prespecified probability, and we provide a portion of an extensive numerical study aimed at evaluating and comparing the performance of our approaches. The experimental results show that both new procedures are useful for constrained ranking and selection, with neither procedure showing uniform superiority over the other.© 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010 相似文献
77.
Within a reasonable life‐testing time, how to improve the reliability of highly reliable products is one of the great challenges to today's manufacturers. By using a resolution III experiment together with degradation test, Tseng, Hamada, and Chiao (1995) presented an interesting case study of improving the reliability of fluorescent lamps. However, in conducting such an experiment, they did not address the problem of how to choose the optimal settings of variables, such as sample size, inspection frequency, and termination time for each run, which are influential to the correct identification of significant factors and the experimental cost. Assuming that the product's degradation paths satisfy Wiener processes, this paper proposes a systematic approach to the aforementioned problem. First, an intuitively appealing identification rule is proposed. Next, under the constraints of a minimum probability of correct decision and a maximum probability of incorrect decision of the proposed identification rule, the optimum test plan (including the determinations of inspection frequency, sample size, and termination time for each run) can be obtained by minimizing the total experimental cost. An example is provided to illustrate the proposed method. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 514–526, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10024 相似文献
78.
In this paper, a single‐machine scheduling problem with weighted earliness and tardiness penalties is considered. Idle time between two adjacent jobs is permitted and due dates of jobs could be unequal. The dominance rules are utilized to develop a relationship matrix, which allows a branch‐and‐bound algorithm to eliminate a high percentage of infeasible solutions. After combining this matrix with a branching strategy, a procedure to solve the problem is proposed. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 760–780, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10039 相似文献
79.
This paper studies a scheduling problem arising in a beef distribution system where pallets of various types of beef products in the warehouse are first depalletized and then individual cases are loaded via conveyors to the trucks which deliver beef products to various customers. Given each customer's demand for each type of beef, the problem is to find a depalletizing and truck loading schedule that fills all the demands at a minimum total cost. We first show that the general problem where there are multiple trucks and each truck covers multiple customers is strongly NP‐hard. Then we propose polynomial‐time algorithms for the case where there are multiple trucks, each covering only one customer, and the case where there is only one truck covering multiple customers. We also develop an optimal dynamic programming algorithm and a heuristic for solving the general problem. By comparing to the optimal solutions generated by the dynamic programming algorithm, the heuristic is shown to be capable of generating near optimal solutions quickly. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2003 相似文献
80.
MacGregor and Harris (J Quality Technol 25 (1993) 106–118) proposed the exponentially weighted mean squared deviation (EWMS) and the exponentially weighted moving variance (EWMV) charts as ways of monitoring process variability. These two charts are particularly useful for individual observations where no estimate of variability is available from replicates. However, the control charts derived by using the approximate distributions of the EWMS and EWMV statistics are difficult to interpret in terms of the average run length (ARL). Furthermore, both control charting schemes are biased procedures. In this article, we propose two new control charts by applying a normal approximation to the distributions of the logarithms of the weighted sum of chi squared random variables, which are respectively functions of the EWMS and EWMV statistics. These new control charts are easy to interpret in terms of the ARL. On the basis of the simulation studies, we demonstrate that the proposed charts are superior to the EWMS and EWMV charts and they both are nearly unbiased for the commonly used smoothing constants. We also compare the performance of the proposed charts with that of the change point (CP) CUSUM chart of Acosta‐Mejia (1995). The design of the proposed control charts is discussed. An example is also given to illustrate the applicability of the proposed control charts. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2009 相似文献