首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   185篇
  免费   39篇
  2021年   1篇
  2020年   1篇
  2019年   5篇
  2018年   2篇
  2017年   6篇
  2016年   10篇
  2015年   14篇
  2014年   10篇
  2013年   61篇
  2012年   9篇
  2011年   7篇
  2010年   4篇
  2009年   7篇
  2008年   9篇
  2007年   11篇
  2006年   7篇
  2005年   11篇
  2004年   7篇
  2003年   11篇
  2002年   10篇
  2001年   6篇
  2000年   5篇
  1999年   6篇
  1993年   2篇
  1979年   1篇
  1978年   1篇
排序方式: 共有224条查询结果,搜索用时 15 毫秒
81.
We consider a container terminal discharging containers from a ship and locating them in the terminal yard. Each container has a number of potential locations in the yard where it can be stored. Containers are moved from the ship to the yard using a fleet of vehicles, each of which can carry one container at a time. The problem is to assign each container to a yard location and dispatch vehicles to the containers so as to minimize the time it takes to download all the containers from the ship. We show that the problem is NP‐hard and develop a heuristic algorithm based on formulating the problem as an assignment problem. The effectiveness of the heuristic is analyzed from both worst‐case and computational points of view. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 363–385, 2001  相似文献   
82.
We consider the problem of finding the system with the best primary performance measure among a finite number of simulated systems in the presence of a stochastic constraint on a single real‐valued secondary performance measure. Solving this problem requires the identification and removal from consideration of infeasible systems (Phase I) and of systems whose primary performance measure is dominated by that of other feasible systems (Phase II). We use indifference zones in both phases and consider two approaches, namely, carrying out Phases I and II sequentially and carrying out Phases I and II simultaneously, and we provide specific example procedures of each type. We present theoretical results guaranteeing that our approaches (general and specific, sequential and simultaneous) yield the best system with at least a prespecified probability, and we provide a portion of an extensive numerical study aimed at evaluating and comparing the performance of our approaches. The experimental results show that both new procedures are useful for constrained ranking and selection, with neither procedure showing uniform superiority over the other.© 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   
83.
MacGregor and Harris (J Quality Technol 25 (1993) 106–118) proposed the exponentially weighted mean squared deviation (EWMS) and the exponentially weighted moving variance (EWMV) charts as ways of monitoring process variability. These two charts are particularly useful for individual observations where no estimate of variability is available from replicates. However, the control charts derived by using the approximate distributions of the EWMS and EWMV statistics are difficult to interpret in terms of the average run length (ARL). Furthermore, both control charting schemes are biased procedures. In this article, we propose two new control charts by applying a normal approximation to the distributions of the logarithms of the weighted sum of chi squared random variables, which are respectively functions of the EWMS and EWMV statistics. These new control charts are easy to interpret in terms of the ARL. On the basis of the simulation studies, we demonstrate that the proposed charts are superior to the EWMS and EWMV charts and they both are nearly unbiased for the commonly used smoothing constants. We also compare the performance of the proposed charts with that of the change point (CP) CUSUM chart of Acosta‐Mejia (1995). The design of the proposed control charts is discussed. An example is also given to illustrate the applicability of the proposed control charts. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2009  相似文献   
84.
In this article, we study a two‐level lot‐sizing problem with supplier selection (LSS), which is an NP‐hard problem arising in different production planning and supply chain management applications. After presenting various formulations for LSS, and computationally comparing their strengths, we explore the polyhedral structure of one of these formulations. For this formulation, we derive several families of strong valid inequalities, and provide conditions under which they are facet‐defining. We show numerically that incorporating these valid inequalities within a branch‐and‐cut framework leads to significant improvements in computation. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 647–666, 2017  相似文献   
85.
We consider scheduling problems involving two agents (agents A and B), each having a set of jobs that compete for the use of a common machine to process their respective jobs. The due dates of the A‐jobs are decision variables, which are determined by using the common (CON) or slack (SLK) due date assignment methods. Each agent wants to minimize a certain performance criterion depending on the completion times of its jobs only. Under each due date assignment method, the criterion of agent A is always the same, namely an integrated criterion consisting of the due date assignment cost and the weighted number of tardy jobs. Several different criteria are considered for agent B, including the maxima of regular functions (associated with each job), the total (weighted) completion time, and the weighted number of tardy jobs. The overall objective is to minimize the performance criterion of agent A, while keeping the objective value of agent B no greater than a given limit. We analyze the computational complexity, and devise polynomial or pseudo‐polynomial dynamic programming algorithms for the considered problems. We also convert, if viable, any of the devised pseudopolynomial dynamic programming algorithms into a fully polynomial‐time approximation scheme. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 416–429, 2016  相似文献   
86.
We present the green telecommunication network planning problem with switchable base stations, where the location and configuration of the base stations are optimized, while taking into account uncertainty and variability of demand. The problem is formulated as a two‐stage stochastic program under demand uncertainty with integers in both stages. Since solving the presented problem is computationally challenging, we develop the corresponding Dantzig‐Wolfe reformulation and propose a solution approach based on column generation. Comprehensive computational results are provided for instances of varying characteristics. The results show that the joint location and dynamic switching of base stations leads to significant savings in terms of energy cost. Up to 30% reduction in power consumption cost is achieved while still serving all users. In certain cases, allowing dynamic configurations leads to more installed base stations and higher user coverage, while having lower total energy consumption. The Dantzig‐Wolfe reformulation provides solutions with a tight LP‐gap eliminating the need for a full branch‐and‐price scheme. Furthermore, the proposed column generation solution approach is computationally efficient and outperforms CPLEX on the majority of the tested instances. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 351–366, 2016  相似文献   
87.
The problem considered is to locate one or more new facilities relative to a number of existing facilities when both the locations of the existing facilities, the weights between new facilities, and the weights between new and existing facilities are random variables. The new facilities are to be located such that expected distance traveled is minimized. Euclidean distance measure is considered; both unconstrained and chance-constrained formulations are treated.  相似文献   
88.
89.
Africa has had no shortage of guerrilla movements since 1975. However, very few have been successful that have not fought against European colonial rule or white minority regimes. Fundamentally, without external support, these movements have been almost universally failures. One major exception to this rule was the National Resistance Army of Uganda, which overthrew the regime led by General Tito Okello in 1986. What made the National Resistance Army a success and distinct from other guerrilla armies were its sound leadership, its superior organization and its creative strategy.  相似文献   
90.
Reviews     
A. Hamish Ion and E.J. Errington (eds.), Great Powers and Little Wars: the Limits of Power. Westport, CT: Praeger, 1993. Pp.246, select biblio, index. $49.95. ISBN 0275–93965–0

John M. Rothgeb, Jr., Defining Power: Influence and Force in the Contemporary International System. New York: St. Martin's Press, 1993. Pp.205. $39.95 (hbk); $18.70 (pbk). ISBN 0312–086–822 and 061–056

Brian L. Job (ed.), The Insecurity Dilemma: National Security in Third World States. Boulder, CO: Lynne Rienner Publishers, 1992, Pp.257. $37. ISBN 1–55587–267–0

Edwin G. Corr and Stephen Sloan (eds.), Low‐Intensity Conflict: Old Threats in a New World. Westview Studies in Regional Security, Boulder, CO: Westview, 1992. Pp.310, maps, figures, index. $55 (hbk); $18.85 (pbk). ISBN 0–8133–8593–8 and 8594–6  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号