排序方式:
出版年(降序)
出版年(升序)
被引次数(降序)
被引次数(升序)
更新时间(降序)
更新时间(升序)
杂志中文名(升序)
杂志中文名(降序)
杂志英文名(升序)
杂志英文名(降序)
作者中文名(升序)
作者中文名(降序)
作者英文名(升序)
作者英文名(降序)
相关性
共有4469条查询结果,搜索用时 0 毫秒
352.
Exporting Democracy: Fulfilling America's Destiny. By Joshua Muravchik, American Enterprise Institute (1991) ISSN 0–8447–3734–8. $12.95.
Generals in the Palacio. By Roderick Ai Camp. Oxford University Press, (1992), ISBN 0–19–507300–2, £45.
L'Armement en France. Genèse, Ampleur et Coût d'une Industrie By François Chesnais and Claude Serfati, Editions Nathan, Collection Economie/Sciences Sociales, Paris (1992), ISBN 2–09–190086–9.
The Têt Offensive. Intelligence Failure in War. By James Wirtz, Cornell University Press, New York (1991), ISBN 0–8014–2486–0. $38.50.
Restructuring of arms producton in Western Europe. Edited by Michael Brzoska and Peter Lock. Oxford University Press, Oxford (1992), ISBN 0–1982–9147–7. £25.00.
What is Proper Soldiering? A study of new perspectives for the future uses of the Armed Forces of the 1990s. By Michael Harbottle. The Centre for International Peacebuilding, Chipping Norton (1992), £3.50.
The Strategic Defence Initiative By Edward Reiss, Cambridge University Press, Cambridge (1992), ISBN 0–521–41097–5. £30.00. 相似文献
353.
In this article we consider a project scheduling problem where there are cash flows throughout the life of the project and where shorter activity durations can be attained by incurring greater direct costs. In particular, the objective of this problem is to determine the activity durations and a schedule of activity start times so that the net present value of cash flows is maximized. We formulate this problem as a mixed-integer nonlinear program which is amenable to solution using the generalized Benders decomposition technique developed by Geoffrion. We test the algorithm on 140 project scheduling problems, the largest of which contains 30 nodes and 64 activities. Our computational results are quite encouraging inasmuch as 123 of the 140 problems require less than 1 CPU second of solution time. © 1993 John Wiley & Sons, Inc.
相似文献
354.
In this article we consider a single-server system whose customers arrive by appointments only. Both static and dynamic scheduling problems are studied. In static scheduling problems, one considers scheduling a finite number of customer arrivals, assuming there is no scheduled customer arrival to the system. In dynamic scheduling problems, one considers scheduling one customer arrival only, assuming that there are a number of scheduled customers already. The expected delay time is recursively computed in terms of customer interarrival times for both cases. The objective is to minimize the weighted customer delay time and the server completion time. The problem is formulated as a set of nonlinear equations. Various numerical examples are illustrated. © 1993 John Wiley & Sons, Inc.
相似文献
355.
A new algorithm is presented for finding maximal and maximum value flows in directed single-commodity networks. Commonly algorithms developed for this problem find a maximal flow by gradually augmenting (increasing) a feasible flow to a maximal flow. In the presented algorithm, at the beginning of each step or iteration, the flow on arcs is assigned to flow capacity. This may lead to an infeasible flow violating flow conservation at some nodes. During two passes of a MAIN step, consisting of a forward pass and a backward pass, the flow is reduced on some arcs to regain feasibility. The network is then pruned by omitting saturated arcs, and the process is repeated. The parallel implementation of the algorithm applies the two main steps at the same time to the same network. The outputs of the two steps are compared and the processing continues with the higher feasible flow. The algorithm is simple, intuitive, and efficient. © 1993 John Wiley & Sons, Inc.
相似文献
356.
Product support encompasses activities undertaken by durable goods producers to ensure their customers the continued use of the product. Examples of product support elements include after the sale activities such as providing repair services and warranty programs, as well as all the activities undertaken at the design and production stage to improve the reliability of products before they reach the market. The implications of incorporating customer costs while designing product support packages are the concern of this study. We study how the parameters of support package impact the costs incurred by customers and provide insights about selecting appropriate levels of product support. We show that the engineering orientation of maximizing the product's availability ignores market characteristics, and results in a mismatch between the corporation's support package and the customer's needs. The research is intended to be a step in understanding the interaction between design engineering parameters and customer's costs. © 1993 John Wiley & Sons, Inc.
相似文献
357.
We model a two-echelon multi-indentured repairable-item inventory system where each “base” has a maximum number of identical online machines, and each machine consists of several module types. Machine failures are due to module failures and occur according to an exponential distribution. When a machine fails, the failed module is replaced by an identical spare module if one is available. Otherwise, the module is backordered. All failed modules go to a single “depot” repair facility which consists of a finite number of identical repairmen who are able to repair any module type in an exponentially distributed time, although the repair rates for different module types may differ. The principal contribution of this article is an approximation algorithm for calculating the steady-state characteristics of the system. In comparison with simulation results, the algorithm is quite accurate and computationally efficient. © 1993 John Wiley & Sons, Inc.
相似文献
358.
Whenever
n demand points are located on a hemisphere, spherical location problems can be solved easily using geometrical methods or mathematical programming. A method based on a linear programming formulation with four constraints is presented to determine whether
n demand points are on a hemisphere. The formulation is derived from a modified minimax spherical location problem whose Karush-Kuhn-Tucker conditions are the constraints of the linear program. © 1993 John Wiley & Sons, Inc.
相似文献
360.
新中国建立后,我国兵役制度进入新的发展时期——以义务兵役制为主体的时代。50多年来,中国兵役制度经历了渐次改革和完善的过程,逐步形成了"义务兵与志愿兵相结合,民兵与预备役相结合的兵役制度"。本文通过对兵役制度发展沿革的历史回顾,梳理了新中国兵役制度的发展脉络,对新中国兵役制度的历史地位和未来的发展方向作了分析和思考。
相似文献