首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   314篇
  免费   67篇
  2021年   2篇
  2020年   1篇
  2019年   11篇
  2018年   4篇
  2017年   15篇
  2016年   20篇
  2015年   15篇
  2014年   15篇
  2013年   68篇
  2012年   15篇
  2011年   20篇
  2010年   21篇
  2009年   18篇
  2008年   21篇
  2007年   31篇
  2006年   20篇
  2005年   14篇
  2004年   20篇
  2003年   12篇
  2002年   14篇
  2001年   10篇
  2000年   11篇
  1999年   3篇
排序方式: 共有381条查询结果,搜索用时 15 毫秒
41.
Vendor‐managed revenue‐sharing arrangements are common in the newspaper and other industries. Under such arrangements, the supplier decides on the level of inventory while the retailer effectively operates under consignment, sharing the sales revenue with his supplier. We consider the case where the supplier is unable to predict demand, and must base her decisions on the retailer‐supplied probabilistic forecast for demand. We show that the retailer's best choice of a distribution to report to his supplier will not be the true demand distribution, but instead will be a degenerate distribution that surprisingly induces the supplier to provide the system‐optimal inventory quantity. (To maintain credibility, the retailer's reports of daily sales must then be consistent with his supplied forecast.) This result is robust under nonlinear production costs and nonlinear revenue‐sharing. However, if the retailer does not know the supplier's production cost, the forecast “improves” and could even be truthful. That, however, causes the supplier's order quantity to be suboptimal for the overall system. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   
42.
This study combines inspection and lot‐sizing decisions. The issue is whether to INSPECT another unit or PRODUCE a new lot. A unit produced is either conforming or defective. Demand need to be satisfied in full, by conforming units only. The production process may switch from a “good” state to a “bad” state, at constant rate. The proportion of conforming units in the good state is higher than in the bad state. The true state is unobservable and can only be inferred from the quality of units inspected. We thus update, after each inspection, the probability that the unit, next candidate for inspection, was produced while the production process was in the good state. That “good‐state‐probability” is the basis for our decision to INSPECT or PRODUCE. We prove that the optimal policy has a simple form: INSPECT only if the good‐state‐probability exceeds a control limit. We provide a methodology to calculate the optimal lot size and the expected costs associated with INSPECT and PRODUCE. Surprisingly, we find that the control limit, as a function of the demand (and other problem parameters) is not necessarily monotone. Also, counter to intuition, it is possible that the optimal action is PRODUCE, after revealing a conforming unit. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   
43.
This paper proposes a kurtosis correction (KC) method for constructing the X? and R control charts for symmetrical long‐tailed (leptokurtic) distributions. The control charts are similar to the Shewhart control charts and are very easy to use. The control limits are derived based on the degree of kurtosis estimated from the actual (subgroup) data. It is assumed that the underlying quality characteristic is symmetrically distributed and no other distributional and/or parameter assumptions are made. The control chart constants are tabulated and the performance of these charts is compared with that of the Shewhart control charts. For the case of the logistic distribution, the exact control limits are derived and are compared with the KC method and the Shewhart method. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   
44.
Design and management of complex systems with both integer and continuous decision variables can be guided using mixed‐integer optimization models and analysis. We propose a new mixed‐integer black‐box optimization (MIBO) method, subspace dynamic‐simplex linear interpolation search (SD‐SLIS), for decision making problems in which system performance can only be evaluated with a computer black‐box model. Through a sequence of gradient‐type local searches in subspaces of solution space, SD‐SLIS is particularly efficient for such MIBO problems with scaling issues. We discuss the convergence conditions and properties of SD‐SLIS algorithms for a class of MIBO problems. Under mild conditions, SD‐SLIS is proved to converge to a stationary solution asymptotically. We apply SD‐SLIS to six example problems including two MIBO problems associated with petroleum field development projects. The algorithm performance of SD‐SLIS is compared with that of a state‐of‐the‐art direct‐search method, NOMAD, and that of a full space simplex interpolation search, Full‐SLIS. The numerical results suggest that SD‐SLIS solves the example problems efficiently and outperforms the compared methods for most of the example cases. © 2017 Wiley Periodicals, Inc. Naval Research Logistics 64: 305–322, 2017  相似文献   
45.
Under quasi‐hyperbolic discounting, the valuation of a payoff falls relatively rapidly for earlier delay periods, but then falls more slowly for longer delay periods. When the salespersons with quasi‐hyperbolic discounting consider the product sale problem, they would exert less effort than their early plan, thus resulting in losses of future profit. We propose a winner‐takes‐all competition to alleviate the above time inconsistent behaviors of the salespersons, and allow the company to maximize its revenue by choosing an optimal bonus. To evaluate the effects of the competition scheme, we define the group time inconsistency degree of the salespersons, which measures the consequence of time inconsistent behaviors, and two welfare measures, the group welfare of the salespersons and the company revenue. We show that the competition always improves the group welfare and the company revenue as long as the company chooses to run the competition in the first place. However, the effect on group time inconsistency degree is mixed. When the optimal bonus is moderate (extreme high), the competition motivates (over‐motivates) the salesperson to work hard, thus alleviates (worsens) the time inconsistent behaviors. © 2017 Wiley Periodicals, Inc. Naval Research Logistics 64: 357–372, 2017  相似文献   
46.
We study a setting with a single type of resource and with several players, each associated with a single resource (of this type). Unavailability of these resources comes unexpectedly and with player‐specific costs. Players can cooperate by reallocating the available resources to the ones that need the resources most and let those who suffer the least absorb all the costs. We address the cost savings allocation problem with concepts of cooperative game theory. In particular, we formulate a probabilistic resource pooling game and study them on various properties. We show that these games are not necessarily convex, do have non‐empty cores, and are totally balanced. The latter two are shown via an interesting relationship with Böhm‐Bawerk horse market games. Next, we present an intuitive class of allocation rules for which the resulting allocations are core members and study an allocation rule within this class of allocation rules with an appealing fairness property. Finally, we show that our results can be applied to a spare parts pooling situation.  相似文献   
47.
We consider the problem of scheduling a set of n jobs on a single batch machine, where several jobs can be processed simultaneously. Each job j has a processing time pj and a size sj. All jobs are available for processing at time 0. The batch machine has a capacity D. Several jobs can be batched together and processed simultaneously, provided that the total size of the jobs in the batch does not exceed D. The processing time of a batch is the largest processing time among all jobs in the batch. There is a single vehicle available for delivery of the finished products to the customer, and the vehicle has capacity K. We assume that K = rD, where and r is an integer. The travel time of the vehicle is T; that is, T is the time from the manufacturer to the customer. Our goal is to find a schedule of the jobs and a delivery plan so that the service span is minimized, where the service span is the time that the last job is delivered to the customer. We show that if the jobs have identical sizes, then we can find a schedule and delivery plan in time such that the service span is minimum. If the jobs have identical processing times, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most 11/9 times the optimal service span. When the jobs have arbitrary processing times and arbitrary sizes, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most twice the optimal service span. We also derive upper bounds of the absolute worst‐case ratios in both cases. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 470–482, 2015  相似文献   
48.
We consider a partially observable degrading system subject to condition monitoring and random failure. The system's condition is categorized into one of three states: a healthy state, a warning state, and a failure state. Only the failure state is observable. While the system is operational, vector data that is stochastically related to the system state is obtained through condition monitoring at regular sampling epochs. The state process evolution follows a hidden semi‐Markov model (HSMM) and Erlang distribution is used for modeling the system's sojourn time in each of its operational states. The Expectation‐maximization (EM) algorithm is applied to estimate the state and observation parameters of the HSMM. Explicit formulas for several important quantities for the system residual life estimation such as the conditional reliability function and the mean residual life are derived in terms of the posterior probability that the system is in the warning state. Numerical examples are presented to demonstrate the applicability of the estimation procedure and failure prediction method. A comparison results with hidden Markov modeling are provided to illustrate the effectiveness of the proposed model. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 190–205, 2015  相似文献   
49.
In scheduling problems with two competing agents, each one of the agents has his own set of jobs to be processed and his own objective function, and both share a common processor. In the single‐machine problem studied in this article, the goal is to find a joint schedule that minimizes the total deviation of the job completion times of the first agent from a common due‐date, subject to an upper bound on the maximum deviation of job completion times of the second agent. The problem is shown to be NP‐hard even for a nonrestrictive due‐date, and a pseudopolynomial dynamic program is introduced and tested numerically. For the case of a restrictive due‐date (a sufficiently small due‐date that may restrict the number of early jobs), a faster pseudopolynomial dynamic program is presented. We also study the multiagent case, which is proved to be strongly NP‐hard. A simple heuristic for this case is introduced, which is tested numerically against a lower bound, obtained by extending the dynamic programming algorithm. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 61: 1–16, 2014  相似文献   
50.
Service systems such as call centers and hospital emergency rooms typically have strongly time‐varying arrival rates. Thus, a nonhomogeneous Poisson process (NHPP) is a natural model for the arrival process in a queueing model for performance analysis. Nevertheless, it is important to perform statistical tests with service system data to confirm that an NHPP is actually appropriate, as emphasized by Brown et al. [8]. They suggested a specific statistical test based on the Kolmogorov–Smirnov (KS) statistic after exploiting the conditional‐uniform (CU) property to transform the NHPP into a sequence of i.i.d. random variables uniformly distributed on [0,1] and then performing a logarithmic transformation of the data. We investigate why it is important to perform the final data transformation and consider what form it should take. We conduct extensive simulation experiments to study the power of these alternative statistical tests. We conclude that the general approach of Brown et al. [8] is excellent, but that an alternative data transformation proposed by Lewis [22], drawing upon Durbin [10], produces a test of an NHPP test with consistently greater power. We also conclude that the KS test after the CU transformation, without any additional data transformation, tends to be best to test against alternative hypotheses that primarily differ from an NHPP only through stochastic and time dependence. © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 66–90, 2014  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号