全文获取类型
收费全文 | 177篇 |
免费 | 85篇 |
国内免费 | 7篇 |
专业分类
269篇 |
出版年
2023年 | 2篇 |
2022年 | 2篇 |
2021年 | 5篇 |
2020年 | 10篇 |
2019年 | 5篇 |
2018年 | 4篇 |
2017年 | 9篇 |
2016年 | 12篇 |
2015年 | 15篇 |
2014年 | 15篇 |
2013年 | 12篇 |
2012年 | 16篇 |
2011年 | 18篇 |
2010年 | 6篇 |
2009年 | 14篇 |
2008年 | 10篇 |
2007年 | 9篇 |
2006年 | 19篇 |
2005年 | 18篇 |
2004年 | 14篇 |
2003年 | 7篇 |
2002年 | 6篇 |
2001年 | 6篇 |
2000年 | 12篇 |
1999年 | 8篇 |
1998年 | 11篇 |
1997年 | 1篇 |
1995年 | 1篇 |
1994年 | 1篇 |
1991年 | 1篇 |
排序方式: 共有269条查询结果,搜索用时 15 毫秒
101.
Non‐preemptive scheduling of n independent jobs on m unrelated machines so as to minimize the maximal job completion time is considered. A polynomial algorithm with the worst‐case absolute error of min{(1 ? 1/m)pmax, p} is presented, where pmax is the largest job processing time and p is the mth element from the non‐increasing list of job processing times. This is better than the earlier known best absolute error of pmax. The algorithm is based on the rounding of acyclic multiprocessor distributions. An O(nm2) algorithm for the construction of an acyclic multiprocessor distribution is also presented. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006 相似文献
102.
We consider the problem of maximizing the number of on‐time jobs on two uniform parallel machines. We show that a straightforward extension of an algorithm developed for the simpler two identical parallel machines problem yields a heuristic with a worst‐case ratio bound of at least . We then show that the infusion of a “look ahead” feature into the aforementioned algorithm results in a heuristic with the tight worst‐case ratio bound of , which, to our knowledge, is the tightest worst‐case ratio bound available for the problem. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006 相似文献
103.
104.
105.
In 2000, Klein showed that bidirectional scheduling schemes (bidss) outperform single‐directional scheduling schemes (e.g., forward or backward schemes). In 2010, Yoosefzadeh, et al. [J Math Model Algor 9 (2010), 357–373] showed that depending on the nature of the problems and also the type of priority rules used, schedules produced by a so‐called tridirectional scheduling scheme (trdss) yields shorter makespans when compared to forward, backward, and even bidss. Since the justification technique is applied in many of the state‐of‐the‐art algorithms nowadays, we show that the tuned version of the trdss outperforms the double justification technique. Moreover, we investigate the circumstances under which the trdss is more probable to generate schedules with shorter makespans. To this end, we introduce a new measure of resource requirements and their distributions, namely total amount of overflows. Our analytical as well as empirical investigations show that when the new measure is increased, it is more probable to obtain schedules with shorter makespans using the trdss. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 61: 44–55, 2014 相似文献
106.
We study a problem of scheduling products on the same facility, which is motivated by a car paint shop. Items of the same product are identical. Operations on the items are performed sequentially in batches, where each batch is a set of operations on the same product. Some of the produced items are of the required good quality and some items can be defective. Defectiveness of an item is determined by a given simulated function of its product, its preceding product, and the position of its operation in the batch. Defective items are kept in a buffer of a limited capacity, and they are then remanufactured at the same facility. A minimum waiting time exists for any defective item before its remanufacturing can commence. Each product has a sequence independent setup time which precedes its first operation or its operation following an operation of another product. A due date is given for each product such that all items of the same product have the same due date and the objective is to find a schedule which minimizes maximum lateness of product completion times with respect to their due dates. The problem is proved NP‐hard in the strong sense, and a heuristic Group Technology (GT) solution approach is suggested and analyzed. The results justify application of the GT approach to scheduling real car paint shops with buffered rework. © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 458–471, 2014 相似文献
107.
We consider the multitasking scheduling problem on unrelated parallel machines to minimize the total weighted completion time. In this problem, each machine processes a set of jobs, while the processing of a selected job on a machine may be interrupted by other available jobs scheduled on the same machine but unfinished. To solve this problem, we propose an exact branch‐and‐price algorithm, where the master problem at each search node is solved by a novel column generation scheme, called in‐out column generation, to maintain the stability of the dual variables. We use a greedy heuristic to obtain a set of initial columns to start the in‐out column generation, and a hybrid strategy combining a genetic algorithm and an exact dynamic programming algorithm to solve the pricing subproblems approximately and exactly, respectively. Using randomly generated data, we conduct numerical studies to evaluate the performance of the proposed solution approach. We also examine the effects of multitasking on the scheduling outcomes, with which the decision maker can justify making investments to adopt or avoid multitasking. 相似文献
108.
Chemotherapy appointment scheduling is a challenging problem due to the uncertainty in premedication and infusion durations. In this paper, we formulate a two‐stage stochastic mixed integer programming model for the chemotherapy appointment scheduling problem under limited availability of nurses and infusion chairs. The objective is to minimize the expected weighted sum of nurse overtime, chair idle time, and patient waiting time. The computational burden to solve real‐life instances of this problem to optimality is significantly high, even in the deterministic case. To overcome this burden, we incorporate valid bounds and symmetry breaking constraints. Progressive hedging algorithm is implemented in order to solve the improved formulation heuristically. We enhance the algorithm through a penalty update method, cycle detection and variable fixing mechanisms, and a linear approximation of the objective function. Using numerical experiments based on real data from a major oncology hospital, we compare our solution approach with several scheduling heuristics from the relevant literature, generate managerial insights related to the impact of the number of nurses and chairs on appointment schedules, and estimate the value of stochastic solution to assess the significance of considering uncertainty. 相似文献
109.
It is generally recognized that the first model involving job scheduling was presented by Selmer Johnson and published in the inaugural issue of Naval Research Logistics Quarterly (NRLQ) in 1954. NRLQ also published another seminal scheduling paper by Wayne E. Smith a short time later. In the present paper, we discuss the contribution of NRLQ and the role of the Office of Naval Research in the development of the scheduling literature during the first decade (1954–1963). We also provide a critical analysis of the papers by Johnson and Smith. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 335–344, 2015 相似文献
110.
We derive sufficient conditions which, when satisfied, guarantee that an optimal solution for a single‐machine scheduling problem is also optimal for the corresponding proportionate flow shop scheduling problem. We then utilize these sufficient conditions to show the solvability in polynomial time of numerous proportionate flow shop scheduling problems with fixed job processing times, position‐dependent job processing times, controllable job processing times, and also problems with job rejection. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 595–603, 2015 相似文献