首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   361篇
  免费   80篇
  国内免费   1篇
  2023年   1篇
  2021年   2篇
  2020年   2篇
  2019年   11篇
  2018年   4篇
  2017年   18篇
  2016年   21篇
  2015年   17篇
  2014年   18篇
  2013年   72篇
  2012年   18篇
  2011年   24篇
  2010年   25篇
  2009年   23篇
  2008年   22篇
  2007年   38篇
  2006年   23篇
  2005年   18篇
  2004年   20篇
  2003年   12篇
  2002年   19篇
  2001年   11篇
  2000年   14篇
  1999年   2篇
  1998年   2篇
  1997年   1篇
  1996年   2篇
  1994年   1篇
  1990年   1篇
排序方式: 共有442条查询结果,搜索用时 15 毫秒
331.
We study discrete‐time, parallel queues with two identical servers. Customers arrive randomly at the system and join the queue with the shortest workload that is defined as the total service time required for the server to complete all the customers in the queue. The arrivals are assumed to follow a geometric distribution and the service times are assumed to have a general distribution. It is a no‐jockeying queue. The two‐dimensional state space is truncated into a banded array. The resulting modified queue is studied using the method of probability generating function (pgf) The workload distribution in steady state is obtained in form of pgf. A special case where the service time is a deterministic constant is further investigated. Numerical examples are illustrated. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 440–454, 2000  相似文献   
332.
This paper examines the discrete equal‐capacity p‐median problem that seeks to locate p new facilities (medians) on a network, each having a given uniform capacity, in order to minimize the sum of distribution costs while satisfying the demand on the network. Such problems arise, for example, in local access and transport area telecommunication network design problems where any number of a set of p facility units can be constructed at the specified candidate sites (hence, the net capacity is an integer multiple of a given unit capacity). We develop various valid inequalities, a separation routine for generating cutting planes that are specific members of such inequalities, as well as an enhanced reformulation that constructs a partial convex hull representation that subsumes an entire class of valid inequalities via its linear programming relaxation. We also propose suitable heuristic schemes for this problem, based on sequentially rounding the continuous relaxation solutions obtained for the various equivalent formulations of the problem. Extensive computational results are provided to demonstrate the effectiveness of the proposed valid inequalities, enhanced formulations, and heuristic schemes. The results indicate that the proposed schemes for tightening the underlying relaxations play a significant role in enhancing the performance of both exact and heuristic solution methods for this class of problems. © 2000 John & Sons, Inc. Naval Research Logistics 47: 166–183, 2000.  相似文献   
333.
独立光伏系统铅酸蓄电池充放电参数的检测对于整个系统的能量控制十分重要。介绍了蓄电池充放电参数检测的特点,设计了充放电电压和电流检测电路,并基于saber仿真平台进行了检测电路的仿真,介绍了以ATmega8L单片机为核心的充放电检测系统的原理和软件设计流程。通过试验证明,系统检测误差较小,电路简单,满足了工程控制的需要,能为独立光伏系统蓄电池充放电控制策略提供准确的控制参数。  相似文献   
334.
For a service provider facing stochastic demand growth, expansion lead times and economies of scale complicate the expansion timing and sizing decisions. We formulate a model to minimize the infinite horizon expected discounted expansion cost under a service‐level constraint. The service level is defined as the proportion of demand over an expansion cycle that is satisfied by available capacity. For demand that follows a geometric Brownian motion process, we impose a stationary policy under which expansions are triggered by a fixed ratio of demand to the capacity position, i.e., the capacity that will be available when any current expansion project is completed, and each expansion increases capacity by the same proportion. The risk of capacity shortage during a cycle is estimated analytically using the value of an up‐and‐out partial barrier call option. A cutting plane procedure identifies the optimal values of the two expansion policy parameters simultaneously. Numerical instances illustrate that if demand grows slowly with low volatility and the expansion lead times are short, then it is optimal to delay the start of expansion beyond when demand exceeds the capacity position. Delays in initiating expansions are coupled with larger expansion sizes. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2009  相似文献   
335.
This article investigates the optimal inventory and admission policies for a “Clicks‐and‐Bricks” retailer of seasonal products that, in addition to selling through its own physical and online stores, also sells through third‐party websites by means of affiliate programs. Through postings on partners' webpages, an affiliate program allows a retailer to attract customers who would otherwise be missed. However, this retailer needs to pay a commission for each sale that originates from the website operators participating in the program. The retailer may also refer online orders to other sources (such as distributors and manufacturers) for fulfillment through a drop‐shipping agreement and thus earns commissions. This would be an option when, for example, the inventories at the physical stores were running low. Therefore, during the selling horizon, the retailer needs to dynamically control the opening/closing of affiliate programs and decide on the fulfillment option for online orders. On the basis of a discrete‐time dynamic programming model, the optimal admission policy of the retailer is investigated in this paper, and the structural properties of the revenue function are characterized. Numerical examples are given to show the revenue impact of optimal admission control. The optimal initial stocking decisions at the physical stores are also studied. © 2009 Wiley Periodicals, Inc. Naval Research Logistics 2009  相似文献   
336.
In many applications of packing, the location of small items below large items, inside the packed boxes, is forbidden. We consider a variant of the classic online one‐dimensional bin packing, in which items allocated to each bin are packed there in the order of arrival, satisfying the condition above. This variant is called online bin packing problem with LIB (larger item in the bottom) constraints. We give an improved analysis of First Fit showing that its competitive ratio is at most , and design a lower bound of 2 on the competitive ratio of any online algorithm. In addition, we study the competitive ratio of First Fit as a function of an upper bound (where d is a positive integer) on the item sizes. Our upper bound on the competitive ratio of First Fit tends to 2 as d grows, whereas the lower bound of two holds for any value of d. Finally, we consider several natural and well known algorithms, namely, Best Fit, Worst Fit, Almost Worst Fit, and Harmonic, and show that none of them has a finite competitive ratio for the problem. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2009  相似文献   
337.
We study a problem of scheduling a maintenance activity on parallel identical machines, under the assumption that all the machines must be maintained simultaneously. One example for this setting is a situation where the entire system must be stopped for maintenance because of a required electricity shut‐down. The objective is minimum flow‐time. The problem is shown to be NP‐hard, and moreover impossible to approximate unless P = NP. We introduce a pseudo‐polynomial dynamic programming algorithm, and show how to convert it into a bicriteria FPTAS for this problem. We also present an efficient heuristic and a lower bound. Our numerical tests indicate that the heuristic provides in most cases very close‐to‐optimal schedules. © 2008 Wiley Periodicals, Inc. Naval Research Logistics 2009  相似文献   
338.
Gamma accelerated degradation tests (ADT) are widely used to assess timely lifetime information of highly reliable products with degradation paths that follow a gamma process. In the existing literature, there is interest in addressing the problem of deciding how to conduct an efficient, ADT that includes determinations of higher stress‐testing levels and their corresponding sample‐size allocations. The existing results mainly focused on the case of a single accelerating variable. However, this may not be practical when the quality characteristics of the product have slow degradation rates. To overcome this difficulty, we propose an analytical approach to address this decision‐making problem using the case of two accelerating variables. Specifically, based on the criterion of minimizing the asymptotic variance of the estimated q quantile of lifetime distribution of the product, we analytically show that the optimal stress levels and sample‐size allocations can be simultaneously obtained via a general equivalence theorem. In addition, we use a practical example to illustrate the proposed procedure.  相似文献   
339.
We consider a dynamic pricing model in which the instantaneous rate of the demand arrival process is dependent on not only the current price charged by the concerned firm, but also the present state of the world. While reflecting the current economic condition, the state evolves in a Markovian fashion. This model represents the real‐life situation in which the sales season is relatively long compared to the fast pace at which the outside environment changes. We establish the value of being better informed on the state of the world. When reasonable monotonicity conditions are met, we show that better present economic conditions will lead to higher prices. Our computational study is partially calibrated with real data. It demonstrates that the benefit of heeding varying economic conditions is on par with the value of embracing randomness in the demand process. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 66:73–89,2019  相似文献   
340.
Recent years have seen a strong trend toward outsourcing warranty repair services to outside vendors. In this article we consider the problem of dynamically routing warranty repairs to service vendors when warranties have priority levels. Each time an item under warranty fails, it is sent to one of the vendors for repair. Items covered by higher priority warranty receive higher priority in repair service. The manufacturer pays a fixed fee per repair and incurs a linear holding cost while an item is undergoing or waiting for repair. The objective is to minimize the manufacturer's long‐run average cost. Because of the complexity of the problem, it is very unlikely that there exist tractable ways to find the optimal routing strategies. Therefore, we propose five heuristic routing procedures that are applicable to real‐life problems. We evaluate the heuristics using simulation. The simulation results show that the index‐based “generalized join the shortest queue” policy, which applies a single policy improvement step to an initial state‐independent policy, performs the best among all five heuristics. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号