全文获取类型
收费全文 | 1549篇 |
免费 | 645篇 |
国内免费 | 106篇 |
出版年
2024年 | 4篇 |
2023年 | 21篇 |
2022年 | 25篇 |
2021年 | 29篇 |
2020年 | 27篇 |
2019年 | 33篇 |
2018年 | 41篇 |
2017年 | 70篇 |
2016年 | 106篇 |
2015年 | 92篇 |
2014年 | 131篇 |
2013年 | 127篇 |
2012年 | 116篇 |
2011年 | 126篇 |
2010年 | 100篇 |
2009年 | 119篇 |
2008年 | 87篇 |
2007年 | 97篇 |
2006年 | 109篇 |
2005年 | 105篇 |
2004年 | 101篇 |
2003年 | 73篇 |
2002年 | 78篇 |
2001年 | 83篇 |
2000年 | 60篇 |
1999年 | 51篇 |
1998年 | 57篇 |
1997年 | 46篇 |
1996年 | 40篇 |
1995年 | 19篇 |
1994年 | 36篇 |
1993年 | 18篇 |
1992年 | 26篇 |
1991年 | 14篇 |
1990年 | 19篇 |
1989年 | 9篇 |
1988年 | 5篇 |
排序方式: 共有2300条查询结果,搜索用时 15 毫秒
81.
82.
In many practical multiserver queueing systems, servers not only serve randomly arriving customers but also work on the secondary jobs with infinite backlog during their idle time. In this paper, we propose a c‐server model with a two‐threshold policy, denoted by (e d), to evaluate the performance of this class of systems. With such a policy, when the number of idle servers has reached d (<c), then e (<d) idle agents will process secondary jobs. These e servers keep working on the secondary jobs until they find waiting customers exist in the system at a secondary job completion instant. Using the matrix analytic method, we obtain the stationary performance measures for evaluating different (e, d) policies. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007. 相似文献
83.
This paper proposes a kurtosis correction (KC) method for constructing the X? and R control charts for symmetrical long‐tailed (leptokurtic) distributions. The control charts are similar to the Shewhart control charts and are very easy to use. The control limits are derived based on the degree of kurtosis estimated from the actual (subgroup) data. It is assumed that the underlying quality characteristic is symmetrically distributed and no other distributional and/or parameter assumptions are made. The control chart constants are tabulated and the performance of these charts is compared with that of the Shewhart control charts. For the case of the logistic distribution, the exact control limits are derived and are compared with the KC method and the Shewhart method. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007 相似文献
84.
85.
相控阵天线关键技术发展趋势 总被引:2,自引:0,他引:2
相控阵天线必然朝着降低成本和提高性能的趋势发展,因此从以下几个方面分析其关键技术的发展方向:增加带宽,提高T/R组件的附加功率效率,移相器技术,数字化电路,以及引入稀布阵技术等。对相控阵技术的需求也是对这些相关技术发展的一种重要的推动力。 相似文献
86.
87.
88.
89.
90.