首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   189篇
  免费   23篇
  国内免费   3篇
  2023年   1篇
  2022年   1篇
  2021年   2篇
  2020年   6篇
  2019年   5篇
  2018年   4篇
  2017年   6篇
  2016年   6篇
  2015年   8篇
  2014年   13篇
  2013年   14篇
  2012年   15篇
  2011年   10篇
  2010年   19篇
  2009年   16篇
  2008年   15篇
  2007年   11篇
  2006年   6篇
  2005年   9篇
  2004年   7篇
  2003年   8篇
  2002年   3篇
  2001年   7篇
  2000年   5篇
  1999年   4篇
  1998年   3篇
  1997年   1篇
  1996年   1篇
  1995年   4篇
  1994年   1篇
  1992年   3篇
  1991年   1篇
排序方式: 共有215条查询结果,搜索用时 15 毫秒
111.
The quick response (QR) system that can cope with demand volatility by shortening lead time has been well studied in the literature. Much of the existing literature assumes implicitly or explicitly that the manufacturers under QR can always meet the demand because the production capacity is always sufficient. However, when the order comes with a short lead time under QR, availability of the manufacturer's production capacity is not guaranteed. This motivates us to explore QR in supply chains with stochastic production capacity. Specifically, we study QR in a two-echelon supply chain with Bayesian demand information updating. We consider the situation where the manufacturer's production capacity under QR is uncertain. We first explore how stochastic production capacity affects supply chain decisions and QR implementation. We then incorporate the manufacturer's ability to expand capacity into the model. We explore how the manufacturer determines the optimal capacity expansion decision, and the value of such an ability to the supply chain and its agents. Finally, we extend the model to the two-stage two-ordering case and derive the optimal ordering policy by dynamic programming. We compare the single-ordering and two-ordering cases to generate additional managerial insights about how ordering flexibility affects QR when production capacity is stochastic. We also explore the transparent supply chain and find that our main results still hold.  相似文献   
112.
We study stochastic clearing systems with a discrete-time Markovian input process, and an output mechanism that intermittently and instantaneously clears the system partially or completely. The decision to clear the system depends on both quantities and delays of outstanding inputs. Clearing the system incurs a fixed cost, and outstanding inputs are charged a delay penalty, which is a general increasing function of the quantities and delays of individual inputs. By recording the quantities and delays of outstanding inputs in a sequence, we model the clearing system as a tree-structured Markov decision process over both a finite and infinite horizon. We show that the optimal clearing policies, under realistic conditions, are of the on-off type or the threshold type. Based on the characterization of the optimal policies, we develop efficient algorithms to compute parameters of the optimal policies for such complex clearing systems for the first time. We conduct a numerical analysis on the impact of the nonlinear delay penalty cost function, the comparison of the optimal policy and the classical hybrid policy (ie, quantity and age thresholds), and the impact of the state of the input process. Our experiments demonstrate that (a) the classical linear approximation of the cost function can lead to significant performance differences; (b) the classical hybrid policy may perform poorly (as compared to the optimal policies); and (c) the consideration of the state of the input process makes significant improvement in system performance.  相似文献   
113.
We review the operations research/management science literature on data-driven methods in retail operations. This line of work has grown rapidly in recent years, thanks to the availability of high-quality data, improvements in computing hardware, and parallel developments in machine learning methodologies. We survey state-of-the-art studies in three core aspects of retail operations—assortment optimization, order fulfillment, and inventory management. We then conclude the paper by pointing out some interesting future research possibilities for our community.  相似文献   
114.
复杂作战任务弹药配备模型   总被引:1,自引:0,他引:1  
多阶段任务系统(PMS)是一种典型的复杂系统,它包括多个在时间上连续且无相互重叠的基本任务,武器系统的作战过程多数属于这种复杂系统.以某作战单元的一次作战任务流程为例,详细地讨论了多阶段复杂任务系统的特点,并从基本任务阶段的系统可信性、可用度的角度出发,分析了在满足给定火力指标的前提下,建立整个复杂作战任务流程中弹药配备模型的方法.  相似文献   
115.
This paper analyzes the simultaneous production of market‐specific products tailored to the needs of individual regions and a global product that could be sold in many regions. We assume that the global product costs more to manufacture, but allows the decision concerning the allocation of products to regions to be delayed until after the manufacturing process has been completed. We further assume that there is additional demand after the region allocation but prior to delivery, extending the two‐stage stochastic program with recourse to include additional stochastic demand after the recourse. This scenario arises, for example, when there is additional uncertainty during a delivery delay which might occur with transoceanic shipments. We develop conditions for optimality assuming a single build‐allocate‐deliver cycle and stochastic demand during both the build and deliver periods. The optimal policy calls for the simultaneous production of market‐specific and global products, even when the global product is substantially more costly than the market‐specific product. In addition, we develop bounds on the performance of the optimal policy for the multicycle problem. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 438–461, 2003  相似文献   
116.
This article addresses the concept of quality risk in outsourcing. Recent trends in outsourcing extend a contract manufacturer's (CM's) responsibility to several functional areas, such as research and development and design in addition to manufacturing. This trend enables an original equipment manufacturer (OEM) to focus on sales and pricing of its product. However, increasing CM responsibilities also suggest that the OEM's product quality is mainly determined by its CM. We identify two factors that cause quality risk in this outsourcing relationship. First, the CM and the OEM may not be able to contract on quality; second, the OEM may not know the cost of quality to the CM. We characterize the effects of these two quality risk factors on the firms' profits and on the resulting product quality. We determine how the OEM's pricing strategy affects quality risk. We show, for example, that the effect of noncontractible quality is higher than the effect of private quality cost information when the OEM sets the sales price after observing the product's quality. We also show that committing to a sales price mitigates the adverse effect of quality risk. To obtain these results, we develop and analyze a three‐stage decision model. This model is also used to understand the impact of recent information technologies on profits and product quality. For example, we provide a decision tree that an OEM can use in deciding whether to invest in an enterprise‐wide quality management system that enables accounting of quality‐related activities across the supply chain. © 2009 Wiley Periodicals, Inc. Naval Research Logistics 2009  相似文献   
117.
We study the problem of designing a two‐echelon spare parts inventory system consisting of a central plant and a number of service centers each serving a set of customers with stochastic demand. Processing and storage capacities at both levels of facilities are limited. The manufacturing process is modeled as a queuing system at the plant. The goal is to optimize the base‐stock levels at both echelons, the location of service centers, and the allocation of customers to centers simultaneously, subject to service constraints. A mixed integer nonlinear programming model (MINLP) is formulated to minimize the total expected cost of the system. The problem is NP‐hard and a Lagrangian heuristic is proposed. We present computational results and discuss the trade‐off between cost and service. © 2009 Wiley Periodicals, Inc. Naval Research Logistics 2009  相似文献   
118.
Free riding in a multichannel supply chain occurs when one retail channel engages in the customer service activities necessary to sell a product, while another channel benefits from those activities by making the final sale. Although free riding is, in general, considered to have a negative impact on supply chain performance, certain recent industry practices suggest an opposite view: a manufacturer may purposely induce free riding by setting up a high‐cost, customer service‐oriented direct store to allow consumers to experience the product, anticipating their purchase at a retail store. This article examines how the free riding phenomenon affects a manufacturer's supply chain structure decision when there are fixed plus incremental variable costs for operating the direct store. We consider factors such as the effort required to find and buy the product at a retail store after visiting the direct store, the existence of competing products in the market, and the extent of consumer need to obtain direct‐store service. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2009  相似文献   
119.
There has been a dramatic increase over the past decade in the number of firms that source finished product from overseas. Although this has reduced procurement costs, it has increased supply risk; procurement lead times are longer and are often unreliable. In deciding when and how much to order, firms must consider the lead time risk and the demand risk, i.e., the accuracy of their demand forecast. To improve the accuracy of its demand forecast, a firm may update its forecast as the selling season approaches. In this article we consider both forecast updating and lead time uncertainty. We characterize the firm's optimal procurement policy, and we prove that, with multiplicative forecast revisions, the firm's optimal procurement time is independent of the demand forecast evolution but that the optimal procurement quantity is not. This leads to a number of important managerial insights into the firm's planning process. We show that the firm becomes less sensitive to lead time variability as the forecast updating process becomes more efficient. Interestingly, a forecast‐updating firm might procure earlier than a firm with no forecast updating. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2009  相似文献   
120.
由于现代战争后勤补给的快速性、安全性、决策者的主观性及获取情报信息的相关特性,使后勤补给路线的决策问题具有不确定性.利用集对分析对确定不确定信息的良好处理能力,对后勤补给路线的决策问题进行了研究.在选择路线时摒弃了传统的只考虑时间效益的思路,综合分析影响后勤补给路线选择的诸多因素,在遵循目的性、实用性、关联性、客观性和定量化原则基础之上,构建了后勤补给路线选择的指标体系;给出一种基于集对分析的决策定量化数学模型,对后勤补给路线的决策问题进行分析,为指挥员能够科学、合理地选择路线提供参考.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号