首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   21篇
  免费   2篇
  2020年   1篇
  2019年   1篇
  2017年   1篇
  2016年   1篇
  2015年   1篇
  2014年   1篇
  2013年   9篇
  2012年   1篇
  2009年   1篇
  2008年   1篇
  2007年   1篇
  2003年   1篇
  1999年   1篇
  1998年   2篇
排序方式: 共有23条查询结果,搜索用时 15 毫秒
21.
Most historical accounts of the atomic bombings of Japan show little interest in Britain's explicit authorization for the attacks. Meanwhile, the few historians who have attempted to explain it rely on a unitary, rational actor model of the British state that is misleading. This article demonstrates that high-ranking British officials became anxious early on about the strategic consequences of a peremptory use of the new weapon. Therefore, especially over the course of 1944 they sought to engage Washington on the linked questions of the bomb's wartime use and its postwar control. However, these officials' initiatives were rebuffed by Prime Minister Winston Churchill, who paved the way to the bombings based on a fervent desire for Anglo-American integration, and on a dim understanding of the bomb's revolutionary potential.  相似文献   
22.
This paper proposes a skewness correction (SC) method for constructing the and R control charts for skewed process distributions. Their asymmetric control limits (about the central line) are based on the degree of skewness estimated from the subgroups, and no parameter assumptions are made on the form of process distribution. These charts are simply adjustments of the conventional Shewhart control charts. Moreover, the chart is almost the same as the Shewhart chart if the process distribution is known to be symmetrical. The new charts are compared with the Shewhart charts and weighted variance (WV) control charts. When the process distribution is in some neighborhood of Weibull, lognormal, Burr or binomial family, simulation shows that the SC control charts have Type I risk (i.e., probability of a false alarm) closer to 0.27% of the normal case. Even in the case where the process distribution is exponential with known mean, not only the control limits and Type I risk, but also the Type II risk of the SC charts are closer to those of the exact and R charts than those of the WV and Shewhart charts. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 555–573, 2003  相似文献   
23.
ABSTRACT

The armed resistance offered by the Organization of Ukrainian Nationalists (OUN) to the Soviet state was the toughest internal political challenge that the Soviet regime faced from World War II to the 1980s. However, OUN’s grand strategy was based on self-delusion and was, therefore, always irrational. It resulted in misinterpretation of the sentiments of Ukrainians and the international situation, collaboration with Nazi Germany despite incompatible goals, counterproductive ethnic violence and sweeping terror against alleged Soviet collaborators. Local civilians rather than the representatives of the Soviet regime were OUN’s primary target; this alienated most residents of Western Ukraine.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号